jf"%

-s e c i lh

% $ [7j(

E UNITED STATES NUCLEAR REGULATORY COMMISSION 4

g6 WASHINGTON, D.C. 20555-0001

.....f POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NVCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 212 License No. DPR-59 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Power Authority of the State of New York (the licensee) December 28, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

9406240185 940616 PDR ADOCK 05000333 P

PDR

_ -=

I

_2_

l l

l (2) Technical Soecifications l

The Technical Specifications contained in Appendices A and B, as I

revised through Amendment No. 212, are hereby incorporated in the l

license. The licensee shall operate the facility in accordance with l

the Technical Specifications.

l 3.

This license amendment is effective as of the date of its issuance to be l

implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION l

s.

Michael L. Boy

, Acting Director Project Directorate I-I Division of Reactor Projects - I/II i

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: June 16, 1994

l ATTACHMENT TO LICENSE AMENDMENT NO. 212 FACILITY OPERATING LICENSE NO. OPR-59 QQCKET NO. 50-333 Revise Appendix A as follows:

Remove Paae Insert Paae 254a 254a l

a JAFNPP 2.

the change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's license on the unit affected.

3.

The change is documented, reviewed by the PORC and approved by the Resident Manager within 14 days of implementation.

6.9 REPORTING REQUIREMENTS (A) ROUTINE REPORTS The following reports shall be submitted in accordance with 10 CFR 50 unless otherwise noted.

1.

STARTUP REPORT a.

A summary report of plant startup and power escalation testing shall be submitted following (1) amendment to the license involving a planned increase in power level, (2) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (3) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant. The Startup Report for the initial fuel cycle shall address each of the tests identified in the FSAR and shallinclude a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report. Startup Reports for subsequent fuel cycles shall address startup tests that are necessary to demonstrate the acceptability of changes and modifications.

Amendment No. 7, 22, 32,110, 212 254a l

._