ML20069N921
| ML20069N921 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/29/1982 |
| From: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20069N924 | List: |
| References | |
| ST-HL-AE-909, NUDOCS 8212070262 | |
| Download: ML20069N921 (4) | |
Text
-
The Light mmPuy Houston Lighting & Power P.O. Box 1700 Houston, Texas 77001 (713)228 9211 November 29. 198:
~
ST>HL-AE-SO9 File Number: G9.2 SFN: V-0100 Mr. Harold Denton Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
South Texas Project Units 1 & 2 Docket Nos. STN-50-498, STN 50-499 Final Safety Analysis Report Amendment 27 Please find, under separate cover, sixty copies of Amendment 27 to the South Texas Project (STP) Units 1 & 2 Final Safety Analysis Report (FSAR). A copy of this transmittal is attached to each amendment copy.
Amendment 27 revises the FSAR to incorporate the following:
1.
Revisions to FSAR Chapter 13 resulting from organizational
- changes, 2.
Responses to Quality Assurance Branch and corresponding
[
changes to FSAR Section 17.2, 1
l 3.
Deletion of the Technical Specifications from the FSAR with a commitment to resubmit the proposed STP Technical Specifications 18 months prior to the date of issuance of the operating license for STP Unit 1.
I 4.
Revisions to previously submitted responses to various NRC questions; and l
l S.
Miscellaneous FSAR text revisions and editorial changes.
Very truly yours, J. H. Goldberg i
Vice President Nuclear Engineering & Construction MAM/mg Attachment 1h
~l U (@
r212070262 821129 n
PDR ADOCK 05000498 K
Ilouston Lighting & Power Company cc:
G. W. Oprea, Jr.
ST-HL-AE-909 J. H. Goldberg File #: G12.132 J. G. Dewease Page Two J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC)
D. E. Sells NRC)
W. M. Hill, Jr.
NRC)
M. D. Schwarz Baker &Botts)
R. Gordon Gooch (Baker &Botts)
J. R. Newman (Lowenstein,Newman,Reis,&Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R< L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livernore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Revision Date 10-18-82
Before the
[
United States Nuclear Regulatory Commission Docket Nos. STN 50-498, STN 50-499 Houston Lighting & Power Company, et. al.
South Texas Project Units 1 & 2 Amendment 27 Houston Lighting & Power Company, an applicant in the above captioned proceeding, for itself and for the City of San Antonio, Central Power and Light Company and the City of Austin, hereby files Amendment 27 to the Final Safety Analysis Report.
Amendment 27 revises the Final Safety Analysis Report to include the following:
1.
Revisions to FSAR Chapter 13 resulting from organizational
- changes, 2.
Responses +o Quality Assurance Branch questions and corresponding changes to FSAR Section 17.2, 3.
Deletion of the Technical Specifications from the FSAR with a commitment to resubmit the proposed STP Technical Specifications 18 months prior to the date of issuance of the l
operating license for STP Unit 1, 4.
Revisions to previously submitted responses to various NRC questions; and 5.
Miscellaneous FSAR text revisions and editorial changes.
Respectfully submitted, H01)STON LIGHTING & POWER COMPANY J. H. Goldberg Vice President Nuclear Engineering & Construction l
F UNITED STATES OF AMERICA NUCLEAR REGULA9RY COMMISSION In the Matter S
S Houston Lighting & Power S
Docket Nos. 50-498 Company, et al.,
S 50-499 S
South Texas Project S
Units 1 and 2 S
AFFIDAVIT J. H. Goldberg being duly sworn, hereby deposes and says that he is Vice President Nuclear Engineering & Construction of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regula-tory Commission the attached Amendment 27 to the STP FSAR; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief.
1 L
J. H. Goldberg V
Vice President Nuclear Engineering & Construction STATE OF TEXAS S
S ra"NTY OF HARRIS S Subscribedandgworntobeforeme,aNotaryPublicinandforHarris M
day of
~M M, 1982.
County, Texas this omunu,,,
+O.hL?
fs E
imi
\\[
5 Notary Public in end/for the 9 M ~.......,f((
State of Texas l
+4 My commissi pires:pe l
BEVERLh).71Yh j
Notary Putgic. %,. ni hu My Commission Expires
/O/r ? /N
' I