.p A
e
.$haCA"1-THE CINCINNATI GAS & ELECTRIC COMPANY saf CINCINNATO. OHIO d5201 November 19, 1982 QA-2124 E. A. BOROMAN N SENtOR VICE PRE $10(NT U. S. Nuclear Regulatory Commission Region III 709 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J. G. Keppler Regional Administrator RE:
WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e), ITEM M-65, SEISMIC CLEARANCE DEFICIENCIES, DOCKET NO. 50-358, CONSTRUC-TION PERMIT NO. CPPR-88, W.O. #57300 JOB E-5590, FIL,NO. NRC-8, M-65 Centlemen:
This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on October 29, 1982 as a potentially reportable deficiency under the requirements of 10CFR50.55(e).
Task VI of the Zimmer Quality Confirmation Program identi-fled on Nonconformance Report (NR) #Q-QAD-82-4218E that the in-spection procedure for pipe support installation, MIP-13, does not contain seismic clearance criteria between pipe supports and cable trays, conduits and their associated supports as required by S&L Design Specifications H-2256 and H-2173.
In addition, it had been determined through project meetings that S&L would no longer compute, on a case by case basis, seismic deflection for conduit supported by vertical hangers greater than 60 inches in length and horizontal hangers greater than 50 inches and will generate specific seismic separation criteria for the above mentioned instances.
S&L is currently evaluating and clarifying the seismic separation criteria in H-2256 and H-2173.
8212O20257 821119 PDR ADOCK 05000358 NOV 2 6 W.
S PDR
\\
Q o
Mr. J. G. Keppler Regional Administrator Region III November 19, 1982 QA-2124 I
Page 2 CG&E Management Corrective Action Request No. 82-11 has been issued to resc1ve the above mentioned condition.
A walkdown of the as-built installations will be performed to assure compliance with these requirements. These actions are ex-pected to be completed and a report submitted by July 31, 1983.
We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Yours very truly, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. Borgmann Senior Vice President FKP:pic cc: NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attn:
W. F. Christianson Zimmer Project Inspector Region III