Monthly Operating Rept for May 1994 for Monticello Nuclear Generating Plant
ML20069M467
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/31/1994
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9406220002
Download: ML20069M467 (5)


Text

_ _ _ _ _ _ _

s Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 June 14, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report May, 1994 Attached is the Monthly operating Report for May, 1994 for the Monticello Nuclear Generating Plant.

iffp' p

of Roger O Anders n Director Licensing and Management Issues c:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment i

9406220002 940531

/

PDR ADOCK 05000263

/.h 8

h.. t t,

PDR l

l i

f f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello-DATE 6-1-94 COMPLETED BY H.

H.

Paustian TELEPHONE G12/295-5151 MONTH OF MAY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Met)

(MWe-Net) 1 547.

17 542.

2 547.

18 543.

3 547.

19 541.

4 546.

20 539.

5 547.

21 541.

6

545, 22 535.

7 549.

23 537.

8 544.

24 536.

9 545.

25 536.

10 546.

26 536.

11 547.

27 534.

12 542.

28 534.

13 544.

29 531.

14 545.

30 531.

15 540.

31 531.

16 545.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OPERATING DATA REPORT

+

DOCKET NO.

50-263 DATE 6-1-94 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1. Unit Name :

Monticello

]

]

2.

Reporting period:

MAY

]

]

3. Licensed Thermal Power (MWt):

1670

]

]

4. Nameplate Rating (Gross MWe) :

569

]

. ]

5. Design Electrical Rating (Net MWe) :

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe) : __564

]

]

7. Maximum Dependable Capacity (Net MWe) :

536

]

]

8.

If Changes Occur in Capacity Ratings (Items Number 3_Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A i

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE 4
11. Hours In Reporting Period 744-3623 200901
12. Number Of Hours Reactor Was Critical 744.0 3580.5 162956.2 i
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7 t
14. Hours Generator On-Line 744.0 3570.4 160171.1
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 1241544 5942258 247207038
17. Gross Electrical Energy Generated (MWH) 418749 2014697 83569360
18. Net Electrical Energy Generated (MNH) 402550 1941375 79960168
19. Unit Service Factor 100.0%

98.5%

79.7%

20. Unit Availability Factor 100.0%

98.5%

79.7%

21. Unit Capacity Factor (Using MDC Net) 100.9%

100.0%

74.3%

22. Unit Capacity Factor (Using DER Net) 99.2%

98.2%

73.0%

23. Unit Forced Outage Rate 0.0%

1.5%

3.6%

l

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) j
Refueling Outage - 9/15/94 - 39 days

$ 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A

26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY

)

INITIAL ELECTRICITY COMMERCIAL OPERATION

.f 6

G Ns i

a m-

.-,..r e-r em-revi,.-ev

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 6-1-94 COMPLETED BY H. H.

Paustian I

TELEPHONE 612/295-5151 MONTH MAY l

05-1-94 to Power operation.

05-31-94 l

1 i

i l

i Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

~

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-263 UNIT NAME -Monticello DATE 01-94 COMPLETED BY -H. H. Paustran REPORT MONTH May TELEPHONE 2612/295-5151 ~

}

Duration Reason Method LER System Comp.

Cause & Corrective No.

Date Ty(pe (hours)

(2) of No.

Code Code Action to 1) 4 Shutdown (4)

(5)

Prevent Recurrence (3) h None a

J

\\

l 4

i I

t 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS) j B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 i

E-Operator Training & License Examination F-Administrative i

G-Operational Error (Explain)

H-Other (Explain) j I

-