Advises That Mods Required by NUREG-0737,Item III.D.3.4, Control Room Habitability, Will Not Be Completed Until 830315 Due to Delays in Receipt of Matl & Sampling Equipment
ML20069K308
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/22/1982
From: Musolf D
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM NUDOCS 8210260154
Download: ML20069K308 (3)


Text

<

o s

Northem States Power Company 414 Niccilet Mall Moneapohs. Minnesota 55401 Telephone (612)330 5500 October 22, 1982 Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License Nc. DPR-42 50-306 DPR-60 Delay in Implementation Schedule for NUREG-0737, Item III.D.3.4, Control Room Habitability Modification In our letter dated June 4, 1982 we stated that plant modifications required by NUREG-0737, Item III.D.3.4, would be completed by January 1, 1983.

It now appears that we will be unable to complete this project as originally scheduled.

The purpose of this letter is to revise the completion date provided in our June 4, 1982 letter and provide a new schedule of key activities for this project.

Our new schedule projects a completion date of March 15, 1983. This represents a delay of two and one-half months in our original schedule. Major reasons for this delay are:

a. Engineering delays - the design of the sampling equipment and method of installation continually evolved and required extensive redesign work.
b. Material delaf - untimely material and equipment delivery has been a continuing cause fec construction delay.
c. Limited Manpower - The Prairie Island Unit I refueling outage is scheduled to begin on November 13, 1982 and end on December 17, 1982. The individuals assigned to bench test the instrumentation and calibrate the system after installation are the same individuals needed for other outage activities.

O B210260154 021022

~ ~

PDR ADOCK 05000282 P

PDR

3 NORTHERN STATES POWER COMPAP4Y Dir of NRR October 22, 1982 Page 2 We believe the revised completion date of March 15, 1983 is realistic and achievable. A revised bar chart schedule showing key activities leading to project completion and turnover to the plant operating staff is attached.

Please contact us if you have any questions concerning our revised schedule for completing this Action Plan requirement.

h David Musolf

/

Manager of Nuclear Support Services DMM/SAF/bd cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector G Charnoff Attachment i

I l

[

l

N82 BAR CHART SCHEDULE

$Q$$f23 Attechment PROJECT Prairie Island Nuclear Generating Plant onMol hom HamaMmy WMHmh SUBJECT FORM 9 7 4406(F 8 8)

_ Month October._ November:_Deceroerh. January February March.

1118 i 25 I 815.'22 29,6_13 2027[3.10;17 2431,7jl4'212817_14 21: 28..

Week of I

Material Deliver,

'.2-i I

Toxic Gas Detectors

//// _ -

Instrument Cable

///

Control Cable

' ~ ///f

_['

~

/'

Engineering Power Source Selection

/

/

Engineering Design Draw l tigs hf

[/h Construction Specification j//,

Design Change Package

//[// f[//.,

Procedures If/ / f/i _ _

.I Installation Calibration and Checkout j/,

f

'/j '/f [//,

Pre-operational

/

Construction Concrete Pads

  1. [///

ktfl((/ [/d Equipment

(/4 ///l f#

/

Electrical and T & C Testing & Checkout h [//

Calibration and Checkout

//

Pre-operational Testing

  1. /((/f[g /[f//((fd I

Operational Traininc & Checkotit l

i l

{

l l

l l

t