ML20069J959
Jump to navigation
Jump to search
| ML20069J959 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 04/15/1983 |
| From: | Reavis J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20069J954 | List: |
| References | |
| NUDOCS 8304260156 | |
| Download: ML20069J959 (1) | |
Text
-
3 OPERATING DATA REPORT DOCKET NO.
50-370 l
~
DATE 4-15-83 COMPLETED BY J. A. Reavis TELEPHONE 704-373 '7567-
.i i
OPERATING STATUS McGuire Unit 2 Hotes : Nameplate Rating
- 1. Unit Name:
- 2. Reporting Period:
March 1, 1983 - March 31, 1983 (Gross e calculated as
- 3. Licensed Thermal Power ()(Wr):
170 1450.00G cNA x.90 power.
g
- 4. Nameplate Rating (Gross MWep:
1305 NUREG-0020.
I 5., Design Electrical Rating (Net MWe): 1180
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1180
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line NOT IN COMMERCIAL OPERATION
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
^ 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8304260156 830420
~'
PDR ADDCK 05000370 R
PDR iC
. ~.. -.... -..,. -... - - -. - -. - - -, - - -
-