Monthly Operating Rept for Mar 1983
ML20069J959
Person / Time
Site: Mcguire
Issue date: 04/15/1983
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20069J954 List:
References
NUDOCS 8304260156
Download: ML20069J959 (1)


Text

- -. . .. - __ . - - -

3 .

OPERATING DATA REPORT DOCKET NO. 50-370 ~ l DATE 4-15-83 COMPLETED BY J. A. Reavis

.i TELEPHONE 704-373 '7567-i OPERATING STATUS

1. Unit Name: McGuire Unit 2 Hotes : Nameplate Rating
2. Reporting Period: March 1, 1983 - March 31, 1983 (Gross e calculated as 170 1450.00G cNA x .90 power.
3. Licensed Thermal Power ()(Wr): g
4. Nameplate Rating (Gross MWep: 1305 NUREG-0020.

I 5., Design Electrical Rating (Net MWe): 1180

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe): 1180

, 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulative

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line NOT IN COMMERCIAL OPERATION
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor

^ 20. Unit Availability Factor '

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY '

COMMERCIAL OPER ATION

~'

8304260156 830420 PDR ADDCK 05000370 R iC PDR