Power su, u,,,
y Comp 2Ry Midland Project: PO som 1963, Midland, MI 45640. (617) 631-8660 April 19,1983 Mr. Jay Harrison, Chief Midland Project Section U.S. Nuclear Regulatory Cctrmission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MILIAND ENERGY CENTER - GO 7020 REMEDIAL SOILS WORK AUDIORIZATION File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6672 12*32 We have ccrpleted our review for the following activities:
165052325 - Drift frcm West Access Shaft to Pier KC2 165053320 - Excavate Pier KC2 165054315 - Install and Load Pier KC2 i
165052310 - Drift to KC3 fran W8 165053310 - Excavate Pier KC3 165054305 - Install and Load KC3 155052310 - Drift to KC10 fran EB 155053310 - Excavate Pier KC10 155054305 - Install and Load KC10 155052325 - Drift frcm East Access Shaft to Pier KCll 155053320 - Excavate Pier KCll 155054315 - Install and Load Pier KCll 155052050 - Install E10 Bulkhead 155053035 - Excavate Pier 10E 155054030 - Install and Load Pier 10E 165052050 - Install W10 Bulkhead 165053035 - Excavate Pier 10W 165054030 - Install and Load Pier 10W B304260146 830420 DR ADOCK 05000329 PDR
e Serial CSC-6672 Page'2 e
& 162550010 - Install Platform at EL. 600' (West) DOES NoT IMCu d6
/
q-152550010 - Install Platform at EL. 600' (East) fu TTIMg, OF TUNN6L O PbFIM6-4 20705040 /- Repair SWPS Duct Bank Q. 822550001/- Excavate for Install and Backfill Drainline and Slab for Acid-Caustic Unloading Station at East End of Turbine Building In accordance with the NRC/CPCo Work Authorization Proecdure we request your concurrance to proceed with the above work.