ML20069J782

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Defective Valve Actuators. Corrective Action of Reworking Valves Still in Progress. Final Rept to Be Transmitted by 830107
ML20069J782
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/15/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0074, W3I82-74, NUDOCS 8210250254
Download: ML20069J782 (1)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

LOUISIANA P OW E R & LIG H T! P O 142 DRAAONCE SmW 004 6000

  • NEW ORLE ANS LOUtSIANA 70174 1504) 366 2345 YOOLE SOUTH UT L T E5 STS7EV V ce President October 15, 1982 Ndecr Operates W3I82-0074 Q-3-A35.07.23 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission k.. ~ h $ (k/lEll ff l

611 Ryan Plaza Drive, Suite 1000 f

~ }'

3 Arlington, Texas 76012

  • k N !O N

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-332 j(

Significant Construction Deficiency Report No. 23

~,

" Defective Valve Actuators (Fisher Controls)"

Seventh Interim Report

REFERENCES:

(1) LP&L Letter W3K81-0127 Dated March 16, 1981 (2) LP&L Letter W3K82-0290 Dated May 20, 1982

Dear Mr. Collins:

At the present time, the corrective action as described in ref;rence 1 is still in progress. Rework of the valves is being performed under the technical supervision of the Technical Sales, Inc. site representative.

A final report will, therefore, be transmitted by January 7, 1983.

Very truly fours, his L. V. Maurin LVM/ MAL:keh cc:

1) Director Office of Inspection & Enforcement U.

S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director rJ Office of Management

/ l%

Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 EEh288?o30003gg n>Oss a

PDR

_.