ML20069J748
| ML20069J748 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/15/1982 |
| From: | Maurin L LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3I82-0072, W3I82-72, NUDOCS 8210250242 | |
| Download: ML20069J748 (1) | |
Text
i i
LOUISIANA 442 OcLAnONOt srnrer POWE R & L1GHT P O BOX 6008
- NEW ORLEANS LOUISIANA 70174 * (504) 366-2345
- = Pswa L. V. MAURIN Vice President l
October 15, 1982 Nuclear operations W3182-0072 Q-3-A35. 07. 32 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission hh@
611 Ryan Plaza Drive, Suite 1000 f
t
-- gf Arlington, Texas 76012
.J l., !;'
J f
N l 8 !O7
SUBJECT:
Waterford SES Unit No. 3 j (' '
Docket No. 50-382 l ~,1i y --
Significant Construction Deficiency Report No. 32
" Stress Analysis For Welded Pipe Support Attachments L_.
Was Not Performed Prior To Fabrication" Third Interim Report
REFERENCES:
(1) LP&L Letter W3K81-0286 Dated August 10, 1981 (2) LP&L Letter W3K82-0200 Dated April 2, 1982
Dear Mr. Collins:
At the present time, the completion of the corrective action as described in reference 1 has not been completed.
Eleven hangers still remain to be reworked. A final report will, therefore, be transmitted by June 24, 1983.
Very truly yours,
'Y 6 L. V. Maurin LVM/ MAL:keh cc:
- 1) Director Office of Inspection & Enforcement 1
U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director Office of Management Information and Program Control l
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 f
8210250242 821015 PDR ADOCK 05000292 S
pDa
____________ __,