Interim Significant Const Deficiency Rept 32 Re Failure to Perform Stress Analysis for Welded Pipe Support Attachments Prior to Fabrication.Initially Reported on 810810.Eleven Hangers Need Reworking.Final Rept Will Be Sent by 830624
ML20069J748
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/15/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0072, W3I82-72, NUDOCS 8210250242
Download: ML20069J748 (1)


Text

i i

LOUISIANA 442 OcLAnONOt srnrer POWE R & L1GHT P O BOX 6008

= Pswa L. V. MAURIN Vice President l

October 15, 1982 Nuclear operations W3182-0072 Q-3-A35. 07. 32 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission hh@

611 Ryan Plaza Drive, Suite 1000 f

t

-- gf Arlington, Texas 76012

.J l., !;'

J f

N l 8 !O7

SUBJECT:

Waterford SES Unit No. 3 j (' '

Docket No. 50-382 l ~,1i y --

Significant Construction Deficiency Report No. 32

" Stress Analysis For Welded Pipe Support Attachments L_.

Was Not Performed Prior To Fabrication" Third Interim Report

REFERENCES:

(1) LP&L Letter W3K81-0286 Dated August 10, 1981 (2) LP&L Letter W3K82-0200 Dated April 2, 1982

Dear Mr. Collins:

At the present time, the completion of the corrective action as described in reference 1 has not been completed.

Eleven hangers still remain to be reworked. A final report will, therefore, be transmitted by June 24, 1983.

Very truly yours,

'Y 6 L. V. Maurin LVM/ MAL:keh cc:

1) Director Office of Inspection & Enforcement 1

U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director Office of Management Information and Program Control l

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 f

8210250242 821015 PDR ADOCK 05000292 S

pDa