Third Interim Deficiency Rept Re Inadequate Clearance Between Process Piping Sys & Box Type Pipe Supports & Restraints.Nineteen Hangers Remain to Be Reworked.Final Rept Will Be Transmitted by 830708
ML20069J680
Person / Time
Site: Waterford 
Issue date: 10/15/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0073, W3I82-73, NUDOCS 8210250217
Download: ML20069J680 (1)


Text

- _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _

l l

I P O W E R & L i G H T! P O BOX 6006

  • NEW ORLEANS, LOUISIANA 70174 142 DELAHONDE STREET

. (504) 366-2345 fAIOCl E SOUTH Ullui LS SYLIEfA L. V. NMURIN October 15, 1982 vice p,esiaen, Nuclear operations W3I82-0073 Q-3-A35.07.29

[hbhf;[Q' T

), ['

Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Ccmnission 611 Ryan Plaza Drive, Suite 1000 N l 0 l7d2 1

Arlington, Texas 76012 L

!Q

~ ~.

SUBJECr: Waterford SES Unit No. 3 i

l j

Docket No. 50-382 j

Significant Construction Deficiency Report No. 29 "Inadeguate Clearance Between Process Piping Systens and Bax-Type Pipe Supports / Restraints" Third Interim Report

REFERENCES:

(1) LP&L Intter W3K81-0257 Dated July 14, 1981 (2) LP&L Letter W3K82-0419 Dated July 15, 1982 l

Dear Mr. Collins:

At the present time, the corrective action as described in reference 1 l

has not been canpletcd. Nineteen (19) hangers still rarain to be reworked.

A final report will therefore be transmitted by July 8, 1983.

Very truly yours, hu L. V. Maurin LVM/ MAL:keh l

l cc:

1) Director Office of Inspection & Enforcanent U. S. Nuclear Regulatory Cannission Washington, D. C.

20555

2) Director l

Office of Managenent Information and Program Control U. S. Nuclear Regulatory Catmission

/

[/

Washington, D. C.

20555 0210250217 821015 DR ADOCK 05000382 PDR

~

~