ML20069J479

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.1 Re Initial Classification,Epip 1.3 Re Estimation of Source Term & EPIP 6.1 Re Limited Plant Evacuation
ML20069J479
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/11/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20069J477 List:
References
NUDOCS 8304220617
Download: ML20069J479 (1)


Text

'. .

s 1 .

MRSin EW eowra couraur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201

JebrWary 11, 1983 s Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION /

Washington, D. C. 20555 Attention: Mr. R. A. Clark, Chief Operating Reactors Branch 3 Genticmen: ,

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are two copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures. These revisions consist of page changes which should be filed in your' copies of the procedures in accordance with the attached instructions.

Please r,eturn the receipt form for these two copies to:

Wisconsin Electric Power Company

~

Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 5424'l Very truly yours,.

Vice President - N ar Power C. W. Fay Attachments Copies to NRC Resident Inspector Incident Response Center, Region III -

$d 8304220617 830420 PDR ADOCK 05000266 ~

F PDR