Nuclear Power PLANTS-CONSTRUCTION Status Report.Data as of June 30,1982.(Yellow Book)
ML20069J045
Person / Time
Issue date: 10/31/1982
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0030, NUREG-0030-V06-N02, NUREG-30, NUREG-30-V6-N2, NUDOCS 8210220142
Download: ML20069J045 (163)


Text

- -- ---- -- --- - -------- -- - -- _ _ - _ _ _ -

saa 8"5

=!!!

NUREG-0030 SE Vol. 6, No. 2 e

i E NUCLEAR POWER PLANTS 1

i CONSTRUCTION STATUS REPORT DATA AS OF 06/30/82 l

1 UNITED STATES NUCLEAR REGULATORY COMMISSION

\\

.y%,,,

s

Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Office Washington, D.C. 20402 A year's subscription consists of 4 issues for this publication.

Single copies of this pubitcation are available from National Technical Information Service, Springfield, VA 22161 Microfiche of single copies are available from NRC/GPO Sales Program Washington, D.C. 20555 f

1 l

l NUREG 0030 Vol. 6, No. 2 1

i NUCLEAR POWER PLANTS CONSTRUCTION STATUS REPORT DATA AS OF 06/30/82 i

1 l

l ateYu $ished c ober 198 0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 s...

/

4

l J

I i

AUTHORIZATION AND CLEARANCE

.i 4

DN JULY L, 1981, THE U. S. NUCLEAR REGULATORY.CDM*ISSION REQUESTED A?>"40 VAL FOR l

COLLECTION OF DATA AND PUBLICATION OF THE CCM3TRUCTIt!N STATUS REPORT (NUREG-0030)

FROM THE OFFICE OF MANAGEMENT AND BUDGET.

BY ACTION DATED AUGUST 3, 1981, THE OFFICE OF MANAGEMEdr AND BUDGET GRANTED APPROVAL OF THE REQUEST.

THE FOLLOWING INFORMATION IS TO APPEAR ON THE FIRST PAGE OF THE REPORT:

APPRGVED BY OMB OMB NO. 3150-0930 EXPIRES 12-31-82 k

P 9

4 i

l i

FOREWORD J

This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide j

information necessary for monitoring progress of all nuclear power plants which have Construction Permits.

The report includes data from utilities sponsoring the construction, as well as from NRC's i

Office of Inspection and Enforcement.

1his data is used to synchronize the licensing process with pre-dicted fuel load dates for this central Federal Government presentation of commercial reactor construction.

UPDATES FOR THIS EDITION WERE NOT RECEIVED FROM THE FOLLOWING PLANTS:

CDMANCHE PEAK 1 MILLSTONE 3 COMANCHE PEAK 2 PERRY 1 DIABLO CANYON 1 PERRY 2 DIABLO CANYON 2 SAN ONOFRE 3 FERMI 2 WOLF CREEK 1 i

a i

I 1

I.

la TABLE OF CONTENTS l

1 SECTION 1

SUMMARY

OF FUEL LDADING CHANGES 1-001 l

FACILITY STATUS

SUMMARY

1-002 THRU 1-004 PLANTS AND STAGES OF CONSTRUCTION BY REGION 1-005 AVERAGE CONSTRUCTION DURATIONS 1-006 THRU 1-012 4

i SECTION 2 PLANT DATA / CONSTRUCTION STATUS 2-002 THRU 2-141 SECTION 3 SCHEDULE FOR UPDATES - CALENDAR YEAR 1982 3-001 BLANK CONSTRUCTION STATUS REPORT FORMS 3-002 THRU 3-003 1

i l

l

4

-J a

_-2_

m.

.w..

M E

O_

o LaJ t/">

l l

1

C0NSTRUCTION STATUS REPORT PAGE N08 1-001 NUCLEAR POWER PLANTS

SUMMARY

0F FUEL L0ADING CHANGES DURING THE PERIOD FROM 04-01-82 TO 06-30-82. THE FOLLOWING LICENSING ACTIONS WERE AUTHORIZED:

LASALLE 1 WAS ISSUED A LOW POWER LICENSE 04-17-82.

GRAND GULF 1 WAS ISSUED A LOW POWER LICENSE 06-16-82.

THE FOLLOWING PLANTS REPORTED CHANGES IN THEIR ESTIMATED FUEL LOADING DATES DURING THE ABOVE REPORTING PERIOD:

FLD LAST FLD THIS SLIPPAGE /

PLANT NAME PERIOD

.f_ERIOD.

(IMPROJFMENT)

BELLEF9NTE 1 M

09-00-83 05-00-85 20.00 M0tlTHS BELLEFONTE 2 09-00-84 05-00-86 20.00 MONIHS ENRICO FERMI 2 M

11-30-82 06-00-83 6.00 MONTHS HOPE CREEK 1 u

06-00-86 01-00-86

( 5.00 MONTHS)

LIMERICK 2 04-00-87 UNKHOWN 0.00 MONTHS MAR 3LE HILL 2 06-00-87 12-00-87 6.00 MONTHS PALO VERDE 1 w

11-00-82 08-01-83 9.03 MONTHS SUMMER 1 w

05-90-82 08-00-82 3.00 MONTHS SUSQUEHANNA 1 w

07-01-82 07-15-82 0.47 MONTHS WASHINGTON NUCLEAR 3 08-00-85 06-00-85

( 2.00 MONTHS) l

+

m FIRST OF A MULTI-UNIT OR A SINGLE UNIT APPLICATION.

FACILITY

$TATUS

SUMMARY

PAGE NO:

1-002 NUCLEAR POWER PLANTS DATE APPLICANT'S APPLICANT'S PERCENT DOCKET REACTOR DESIGN IE CONSTRUCTION FLD AT CP CURRENT CONSTRUCTION P_LANT NAMJ HUMBIR TYPE MWJ_

RffGI_0_$

STARTED ISSUANCE FLD COMPLETE 1

PEAVER VALLEY 2 05000412 PWR 852 1

05-04-74 02-00-79 12-31-85 56%

2.

BELLEF0HTE 1 05000438 PWR 1235 2

09-00-74 06-00-79 05-00-85 79%

3.

BELLErONTE 2 05000439 PWR 1235 2

09-00-74 03-00-80 05-00-86 65%

4.

BRAIDN00D 1 05000456 PWR 1120 3

08-00-75 05-00-81 04-00-85 63%

5.

BRAIDWOOD 2 05000457 PWR 1120 3

08-00-75*

05-00-82 04-00-86 49%

6.

BYRON 1 05000454 PWR 1120 3

04-00-75 05-00-80 04-00-83 82%

7.

BYRON 2 05000455 PWR 1120 3

04-00-75 05-00-81 04-00-84 66%

8.

CALLAWAY 1 05000483 PWR 1988 3

09-03-75 06-01-81 06-01-83 82%

9.

CATAMBA 1 05000413 PWR 1145 2

05-16-74 12-00-78 10-00-84 90%

10.

CATAW3A 2 05000414 PWR 1145 2

05-16-74 12-00-79 10-00-86 45%

11 CHEROKEE 1 05000491 PWR 1280 2

07-09-76 05-00-83 UNKNOWN 18%

12.

CHEROKEE 2 05000492 PWR 1280.

2 07-09-76 05-00-85 UNKNOWN 00%

13.

CHEROKEE 3 05000493 PWR 1280 2

07-09-76 05-00-88 UNKNOWN 00%

14.

CLINTON 1 05000461 BWR 950 3

10-06-75 10-00-80 01-03-84 84%

15.

CLINTON 2 05000462 BWR 950 3

10-06-75 10-00-83 UNKNOWN 01%

16.

CCMANCHE PEAK 1 05000445 PWR 1950 4

10-00-74 06-00-79 06-00-83 89%

17.

COMANCHE PEAK 2 05000446 PWR 1150 4

10-17-74 06-00-81 UNKNOWN 57%

18.

DIABLO CANYOH 1 05000275 PWR 1084 5

06-14-68 04-00-72 UNKNOWN 99%

19.

DIABLO CANYON 2 05000323 PWR 1106 5

06-14-68 11-00-74 UNKNOWN 98%

20.

FNRICO FERMI 2 05000341 BHR 1993 3

05-00-69 08-00-73 06-00-83 88%

21 GRAND GULF 2 05000417 BWR 1250 2

05-03-74 03-00-81 UNKNOWN 22%

22.

HARRIS 1 05000400 PWR 915 2

01-14-74 09-00-80 12-00-84 66%

23.

HARRIS 2 05000401 PWR 915 2

01-14-74 06-01-85 06-01-88 04%

24.

HARTSVILLE A-1 05000518 BWR 1205 2

04-22-76 06-00-81 01-01-90 44%

25.

HARTSVILLE A-2 05000519 BWR 1205 2

04-22-76 06-00-82 01-01-91 34%

l FACILITY

$TATUS

SUMMARY

PAGE NO:

1-003 NUCLEAR POWER PLANTS DATE APPLICANT'S APPLICANT'S PERCENT PLANT HAME NUMBER TYPE

. Mt!E REGTON STARTFD I S SJr.A N C[_

FLD ~

CONSTRUCTION DOCKET REACTOR DESIGN IE CONSTRUCTION FLD AT CP CURRENT C0"PLETE 26.

HARTSVILLE B-1 05000520 BWR 1205 2

04-22-76 12-00-81 UNKNOWN 17%

27.

HARTSVILLE B-2 05000521 BWR

!205 2

04-22-76 12-00-82 UNKNOWN 07%

28.

HOPE CREEK 1 05300354 BWR 1067 1

03-00-76 06-03-81 01-00-86 50%

29.

LASALLE 2 05000374 BWR 1078 3

10-00-73 08-01-75 04-30-83 87%

30.

LIMERICK 1 05000352 BWR 1065 1

05-00-70 04-00-79 10-00-84 76%

31 LIMERICK 2 05000353 BWR 1065 1

05-00-70 09-00-80 UNKNOWN 30%

32.

MARBLE HILL 1 05000546 PWR T130 3

08-00-77 04-00-82 06-00-86 41%

33.

MARBLE HILL 2 05000547 PWR 1130 3

12-00-77 07-00-83 12-00-87 21%

34.

MCGUIRE 2 05000370 PWR 1180 2

04-01-71 10-01-76 04-01-83 97%

35.

MIDLAND 1 05000329 PWR 492 3

03-00-73 11-00-79 12-00-83 83%

36.

MIDLAND 2 05000330 PWR 818 3

03-00-73 11-00-78 07-00-83 83%

37.

MILLSTONE 3 05000423 PWR 1159 1

05-00-74 12-01-78 12-01-85 43%

38.

NINE MILE POINT 2 05000410 BWR 1080 1

08-25-75 05-01-78 03-00-86 50%

39.

NORTH ANNA 3 05000404 PWR 907 2

07-00-72 07-00-78 04-00-89 08%

40.

PALD VERDE 1 05000528 PWR 1304 5

05-00-76 11-00-81 08-01-83 96%

41 PALO VERDE 2 05000529 PWR 1304 5

06-00-76 11-00-83 08-01-84 83%

42.

PALD VERDE 3 05000530 PWR 1304 5

06-00-76 11-00-85 11-00-85 42%

43.

PERRY I 05000440 BWR 1205 3

10-00-74 05-30-81 11-00-83 81%

44.

PERRY 2 05000441 BWR 1205 3

10-00-74 12-30-82 05-00-87 41%

45.

PHIPPS BEND 1 05000553 BWR 1220 2

10-19-77 01-00-83 01-00-93 29%

46.

PHIPPS BEND 2 05000554 BWR 1220 2

UNKNOWN 01-00-83 UNKNOWN 05%

47.

RIVER BEND 1 05000458 BWR 934 4

04-08-79 10-00-81 04-00-85 52%

48.

RIVER BEND 2 05000459 BWR 934 4

bHKNOWN UNKNOWN UNKNOWN 01%

49.

SAN ONOFRE 3 05000362 PWR 1100 5

02-07-74 05-00-80 11-01-82 87%

^

50.

SEABROOK 1 05000443 PWR 1198 1

07-00-76 08-01-81 11-30-83 69%

FACILITY STATUS

SUMMARY

PAGE N0; 1-004 NUCLEAR POWER PLANTS DATE APPLICANT'S APPLICANT'i PERCENT DOCKET REACTOR DESIGN IE CONSTRUCTION FLD AT CP CURRENT CONSTRUCTION PLANT HAME NUMBER TYPE MWF REGION STARTED ___

ISSUANCE FLD COMPLETE 51 SEABROOK 2 05000444 PWR 1198 1

07-00-76 10-01-83 02-28-86 15%

52.

SHOREHAM 05000322 BWR 854 1

11-00-72 03-00-77 09-20-82 93%

53.

SOUTH TEXAS 1 05000498 PWR 1250 4

09-00-75 05-01-80 12-00-86 45%

54.

SOUTH TEXAS 2 05000499 PWR 1250 4

09-00-75 10-01-81 12-00-88 18%

55.

ST LUCIE 2 05000389 PWR 842 2

05-02-77 05-13-83 10-28-82 87%

56.

SUMMER 1 05000395 PWR 900 2

04-00-73 10-01-77 08-00-82 99%

57.

SUSQUEHANNA 1 05000387 BWR 1052 1

11-00-73 05-01-79 07-15-82 97%

58.

SUSQUEHANNA 2 05000388 BWR 1052 1

11-00-73 11-01-80 01-00-84 68%

59.

V0GTLE 1 05000424 PWR 1100 2

08-01-76 10-01-79 09-01-86 35%

60.

V0GTLE 2 05000425 PWR 1100 2

08-01-76 10-01-80 03-01-88 11%

61.

WAS111NGTON NUCLEAR 1 05000460 PWR 1266 5

08-01-75 03-00-80 UNKNOWN 63%

62.

WASHINGTON NUCLEAR 2 05000397 BWR 1103 5

08-00-72 04-00-77 09-00-83 98%

63.

WASHINGTON NUCLEAR 3 05000508 PWR 1242 5

04-00-77 07-00-83 06-00-85 56%

64.

WATERFORD 3 05000382 PWR 1151 4

11-14-74 06-00-78 01-00-83 94%

65.

WATTS BAR 1 05000390 PWR 1165 2

12-26-72 11-00-76 08-00-83 82%

66.

WATTS 8AR 2 05000391 PWR 1165 2

12-26-72 05-00-77 08-00-84 52%

67.

WOLF CREEK 1 05000482 PWR 1150 4

01-24-77 10-08-82 12-16-83 80%

68.

YELLOW CREEK 1 05000566 PWR 1285 2

02-09-78 02-01-84 07-01-89 35%

69.

YELLOW CREEK 2 05000567 PWR 1285 2

UNKNOWN UNKNOWN UNKNOWN 03%

70.

ZIMMER 1 05000358 BWR 810 3

03-00-71 01-00-77 12-00-82 98%

M

f. &

9

. */

)

i s

g A

"+

v y * ;

V,<,

lj p \\,

"n, '

-g a

p y

j s

n e,

I 2

-)2 h (J f

2 f.

I

~

},

s r

e a

u-a

+

s

.)

PAGE NO 1-005 7

C0N5TRUCTION 5TATUS REPORT V

r

.g,

'4 HUCLEAR POWER

'P L A N T 5 n

p PLANTS SY IE REGION TOTAL -

70 IE REGIDH 1 (II)

J Q GION 2_

(26)

[ERE5 ION 3~

(16) e, IE REGION 4

( 8)

IE REGION 5

( 9) act?N?AD 2 ~ f y(

m-s, DIABLO CANYOH 1 g

fRMDkddD l'

i CDMANCHE PEAK 1 3

BEAVER VALLEY 2 BELLErcatTE Atis,

A COMANCHE PEAK 2

\\

DIABLO CANYON 2 HOPE CREEK 1 BELLEFONIE 7' 4'%

LIMERICK 1 CATAWBA 1

%., f 3YR04 1 ' _ s.

RIVER BEND 1

  • _q4 PALO VERDE 1 ti RIVER BEND 2 PAlo VERDE 2 l

lit!ERICK 2 i

CATAWBA 2

  • 3YF0H,2 s.

MILLSTONE 3 CHEROKEE 1 1

(,s CAttAWAY 1 SOUTH TEXAS 1 Js(

o

'PALD VERDE 3 SAN OMtFRE 3

-;LINTON 1 SOUTH TEXAS 2 NINE F11LE POINT 2 CHEROKEE 2 S

~

SEABROOK l'

CHER0!!EE 3 t%

CLINTON 2 Wi"ERFORD 3 WASHINGTON NUCLEAR 1 ENRICO FERMI 2 f WOLF CREEK 1 WASHINGTON NUC1EAk 2 SEABROCK 2 GRAND GULF 2 ~ d,,

LASALLE 2

~ 1; O *,

WASHINGTON NUCLEAR 3 SHOREHAM HARRIS 1

'g

(, g MARBLE HILL 2 A

,") ' $

MARBLE HILL 1 SDSCVEHANNA 1 HARRIS 2 SUSQUEHANNA 2 HARTtVILLE A-1 j

HARTSVILLE E V u

' MIDLAND 2 3 'L p HAPTSVILLE A-2 A

h MIDLAND ?

d

^

~

4.

4 HARTSVILLE B-2 PERRY 1 y

+

MCGUIRE 2 PERRY 2 NORTH ANNA 3 ZIMMER 1 PHIPPS BEND 1

. ^Ki

'l e

'f[S'h PHIPPS BEND 2,p l

ST LUCIE 2 I

SUMMER 1 l

V0GTLE 1 V0GTLE 2 WATTS BAR 1

/

)

I-l dl,

WATTS BAR 2 p

a N YELLOW CREEK 1 a

}YELLOWCREEK2 o3 4

l

^

e n

l e

f e' h

i

/

L STAGES 0F[?LANT COHATAUCTION IE R t G I 0.N

} F.. Y

,,s a;~

~ ;

p f

3 f

$^

. if 25%To'94f.

'1?? TO 9B TOTAL l

REGION et TO 24%

19% 70 74%

/

s 1

1 2

5 3

4 11)

'k.

l 2

11 6

31 6

26 '

t.

j '(

2 9

if

}

3 2

3 r

}a[r.

8 jZ, 3

4 2

"1 s

s.

?

s

_g

_t j'

_A

^

TOTAL 16 13 14 27 70 J f-i 7

?

k

~

[.

h i

a-s

AVERAGE C0MSTQUCTION DURATION 5 PAGE NO:

1-006 NUCLEAR P0WER PLANTS PRIOR TO 197J - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM El_ ANT NAME CONSTRUCTION ESTIMATE

$_0MPLETE SIACTOR ttW E_,,_

DURATION DRESDEN 1 M

05-01-56 09-24-59C 100%

BWR 200 40.9 YANKEE-ROWE 1 M

03-01-58 07-09-60C 10Ct PWR 175 28.3 INDIAN POINT 1 M

12-01-56 03-26-62C 100%

PUR 265 63.8 HUMBOLDT BAY M

11-01-60 08-28-62C 100%

BWR 65 21.9 BIG ROCK POINT 1 M

03-01-60 08-30-62C 100%

BUR 72 30.0 SAN ONOFRE 1 M

07-01-64 03-27-67C 100%

PWR 436 32.9 HADDAM NECK M

04-01-64 06-30-67C 100%

PUR SL2 39.0 LA CROSSE N

06-01-62 07-03-67C 100%

BUR 50 61.1 OYSTER CREEK 1 M

09-01-63 04-09-69C 100%

BWR 650 67.3 NINE MILE POINT 1 M

07-D1-63 08-22-69C 100%

BWR 620 73.7 GINNA N

04-01-66 09-19-69C 100%

PWR 470 41.6 DRESDEN 2 M

09-01-65 12-22-69C 100%

BWR 794 51.7 AVE: 365 AVE: 46.0 CALENDAR YEAR 1970 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CCHSTRUCTION MM PLANT HAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MNE DURATION ROBINSON 2 M

02-01-67 07-31-70C 100%

PW't 700 42.0 MONTICELLO M

09-01-66 09-08-70C 100%

BWR 545 48.2 POINT BEACH 1 M

01-01-67 10-05-70C 100%

PWR 497 45.1 MILLSTONE 1 M

03-01-66 10-06-70C 100%

BWR 660 55.2 AVE: 601

.\\VE:

47.6 CALENDAR YEAR 1971 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR

_ Mt4 E DUPATION DRESDEN 3 M

03-01-66 01-12-71C 100%

BWR 794 58.4 PALISADES M

08-01-68 03-24-71C 100%

PWR 805 31.8 QUAD CITIES 1 M

10-01-66 10-01-71C 100%

BUR 789 60.0 INDIAN POINT 2 M

01-01-66 10-19-71C 100%

PWR 873 69.6 POINT BEACH 2 M

01-01-67 11-16-71C 100%

FWR 497 58.5 i

AVE: 752 AVE: 55.7 INE DURATION FOR NUCLEAR POWER PLANT CONSTRUCTION IS DEFINED AS TPE ELAPSED TIME FROM ACTUAL GROUND BREAKING UNTIL THE PLANT IS CONilDERED READY FOR N,J.Ti t FUEL LOADING. THIS DOES NOT INCLUDE AN AVERACE FIRST OF A MULTI UNIT OR A SINGLE UNIT APPLICATION.

N I

DURATION OF SIX (6) MONTHS FOR POWER ASCENSION TO MM IN CALENDAR MONTHS.

COMMERCIAL OPERATION.

AVERAGE C0NSTRUCTION DURATIONS PAGE NO 1-007 NUCLEAR POWER PLANTS CALENDAR YEAR 1972 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSlRUCTION Mu PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR

_MWE,

DURATION VERMONT YANKEE 1 M

12-12-67 03-21-72C 100%

BWR 514 51.3 QUAD CITIES 2 10-01-66 03-31-72C 100%

BWR 789 66.0 SURRY 1 M

12-01-66 05-25-72C 100%

PWR 788 65.8 PILGRIM 1 M

02-01-67 06-08-72C 100%

BWR 655 64.2 TURKEY POINT 3 M

01-01-67 07-19-72C 100%

PWR 693 66.6 MAINE YANKEE N

06-01-68 09-15-72C 100%

PWR 825 51.5 AVE: 711 AVE:

60.9 CALENDAR YEAR 1973 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM PLANT HAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION SURRY 2 12-01-66 01-29-73C 100%

PWR 788 73.9 OCONEE 1 M

03-01-67 02-06-73C 100%

PWR 887 71.2 ZION 1 M

04-01-68 04-06-73C 100%

PWR 1040 60.2 TURKEY POINT 4 01-01-67 04-10-73C 100%

PWR 693 75.3 FORT CALHOUN 1 M

02-01-68 05-23-73C 100%

PWR 478 63.7 BROWNS FERRY 1 09-01-66 06-26-73C 100%

BWR 1065 81.8 PEACH BOTTOM 2 M

02-01-67 08-08-73C 100%

BWR 1065 78.2 PRAIRIE ISLAND 1 06-01-68 08-09-73C 100%

PWR 530 62.3 OCONEE 2 03-01-67 10-06-73C 100%

PWR 887 79.2 ZION 2 04-01-68 11-14-73C 100%

PWR 1040 67.4 FORT ST VRAIN N

05-01-68 12-21-73C 100%

HTGR 330 67.7 KEWAUNEE N

12-01-67 12-21-73C 100%

PWR 535 72.7 1

AVE: 778 AVE:

71.1

AVERAGE C0NSTRUCTION DURATIONS PAGE NO:

1-008 NUCLEAR POWER PLANTS CALENDAR YEAR 1974 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT NAME CONSTRUCTION ESTIM4TE COMPLETE REAQTOR MWE DURATION COOPER STATION N

02-01-68 01-18-74C 100%

BWR 778 71.6 DUANE ARHOLD M

09-01-70 02-22-74C 100%

BUR 538 41.7 THREE MILE ISLAND 1 W

01-01-68 04-19-74C 100%

PWR 819 75.6 ARKANSAS 1 12-01-68 0 5-21-74 C 100%

PWR 850 65.7 BROWNS FERRY 2 09-01-66 06-28-74C 100%

BUR 1065 93.9 PEACH BOTTOM 3 02-01-67 07-02-74C 100%

BWR 1065 89.0 OCONEE 3 11-01-67 07-19-74C 100%

PUR 887 80.6 CALVERT CLIFFS 1 m

02-01-68 07-31-74C 1004 FUR 845 78.0 HATCH 1 M

09-01-68 08-06-74C 10C%

BUR 777 71.2 RANCHO SECO 1 W

04-01-69 08-16-74C 100%

PWR 918 64.5 FITZPATRICK 01-01-69 10-17-74C 100%

BWR 821 69.5 COOK 1 W

03-01-69 10-25-74C 100%

PWR 1054 67.8 PRAIRIE ISLAND 2 06-01-68 10-29-74C 100%

PWR 530 76.9 BRUNSNICK 2 N

10-01-69 12-27-74C 100%

BWR 821 62.9 AVE: 841 AVE:

72.1 CALENDAR YEAR 1975 - ACTUAL DURATIONS 1

START, FLD PERCENT TYPE DESIGN CONSTRUCTION mm PLANT NAME CONS T R11C_11EM EELIN AT E

[ctPLETE REACTOR

_MUE DURATION MILLSTONE 2 11-01-69 08-01-75C 100%

PWR 870 69.0 TROJAN w

03-01-70 11-21-75C 100%

PWR 1130 68.7 INDIAN POINT 3 u

10-01-67 12-12-75C 100%

PWP 965 98.4 AVE: 988 AVE:

78.7 CALENDAR YEAR 1976 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM PLANT NAME CONSTRU_QTLOR ESTIHtTE

$_0J1PL E T E REACTOR

_.UW E___

DURATION BEAVER VALLEY 1 N

06-01-69 01-30-76C 100%

P11R 852 80.0 ST LUCIE 1 M

02-15-69 03-01-76C 100%

PWR 802 84.5 BROUNS FERRY 3 p

09-00-66 07-02-76C 100%

BNR 1065 118. 1 SALEM 1 M

01-00-68 08-13-76C 100%

PUR 1090 103.4 CALVERT CLIFFS 2 02-00-68 05-13-76C 100%

PWR 845 102.4 BRUNSWICK 1 07-00-70 09-01-76C 100%

BWR 821 74.0 CRYSTAL RIVER 3 09-25-68 11-22-76C 100%

FWR 825 97.9 AVE: 900 AVE:

94.3

AVERAGE C0N$TRUCTION DURATIONS PAGE N08 1-009 NUCLEAR POWER PLANTS CALENDAR YEAR 1977 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT NAME

$pHSTRUCTION ESTIMATE COMPLETE REACTOR

_MUE.

DURATION DAVIS-BESSE 1 M

09-10-70 04-18-77C 100%

PWR 906 79.3 FARLEY 1 M

10-00-70 06-25-77C 100%

PWR 829 80.8 HORTH ANNA 1 N

12-08-69 10-31-77C 100%

PWR 907 94.8 COOK 2 03-25-69 12-21-77C 100%

PWR 1100 104.9 AVE: 936 AVE: 90.0 CALENDAR YEAR 1978 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MN PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DtlRATION THREE MILE ISLAND 2 N

02-01-69 01-01-78C 100%

PWR 906 107.0 HATCH 2 N

09-01-68 05-01-78C 100%

BWR 784 116.0 ARKANSAS 2 N

05-15-71 06-19-78C 100%

PWR 912 85.1 AVE: 867 AVE: 102.7 CALENDAR YEAR 1979 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT NAME CONSTRUCTION ESTIMATE COMPLETS REACTOR MWE DURATION NO PLANTS LOADED FUEL DURING CALENDAR YEAR 1979.

CALENDAR YEAR 1980 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT NAME CONSTRUCTID3 ESTIMATE COMPLETE REACTOR

_GIE__

DURATION SEQUOYAN 1 M

05-05-69 02-29-80C 100%

PWR 1148 129.8 NORTH ANNA 2 12-08-69 04-11-80C 100%

PWR 907 124.1 SALEM 2 01-01-68 04-18-80C 100%

PWR 1115 147.6 FARLEY 2 10-00-70 10-00-80C 100%

PWR 829 120.0 AVE: 1000 AVE: 130.4 I

2 I

d AVERAGE C0N$TRUCTION DURATIONS PAGE NO2 1-010 NUCLEAR POWER PLANTS CALENDAR YEAR 1981 - ACTUAL DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM PLANT NAME CCNSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION MCGUIRE t M

04-01-71 01-00-81C 100%

PWR 1180 117.0 SEQUDYAH 2 05-05-69 07-03-81C 100%

PWR 1148 145.8 AVE: 1164 AVE: 131.4 CALENDAR YEAR 1982 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MUE DURATION LASALLE 1 M

10-00-73 04-15-82C 100%

BttR 1078 102.5 GRAND GULF 1 M

05-03-74 05-14-82C 100%

BWR 1250 96.4 SUSQUENANNA 1 W

11-00-73 07-15-82 97%

BWR 1052 104.5 4

$UMMER 1 M

04-00-73 08-00-82 99%

PUR 900 112.0 SHOREHAM M

11-00-72 09-20-82 93%

BUR 854 118.7 ST LUCIE 2 M

05-02-77 10-23-82 87%

PWR 842 65.9 SAN ONOFRE 3 02-07-74 11-01-82 87%

PUR 1100 104.8 SAN ONOFRE 2 M

02-07-74 11-01-82 100%

PWR 1100 104.8 ZIMMER 1 M

03-00-71 12-00-82 98%

BWR 810 141.0 AVE: 998 AVE: 105.6 CALENDAR YEAR 1983 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION MM PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION WATERFORD 3 M

11-14-74 01-00-83 94%

PWR 1151 97.5 BYRON 1 M

04-00-75 04-00-83 82%

PWR 1120 96.0 MCGUIRE 2 04-01-71 04-01-83 97%

PUR 1180 144.0 LASALLE 2 10-00-73 04-30-83 87%

BWR 1078 115.0 ENRICO FERMI 2 M

05-00-69 06-00-83 88%

BUR 1093 169.0 COMANCHE PEAK 1 M

10-00-74 06-00-83 89%

PWR 1150 104.0 CALLAWAY 1 M

09-03-75 06-01-83 82%

PWR 1188 92.9 MIDLAND 2 M

03-00-73 07-00-83 83%

P!JR 818 124.0 WATTS BAR 1 M

12-26-72 08-00-83 82%

PWR 1165 127.1 PALO VERDE 1 M

05-00-76 08-01-83 96%

PWR 1304 87.0 WASHINGTON NUCLEAR 2 M

08-00-72 09-00-83 91%

BWR 1103 133.0 PERRf 1 M

10-00-74 11-00-83 81%

BWR 1205 109.0 SEABROOK 1 M

07-00-76 11-30-83 69%

PWR 1998 89.0 MIDLAND 1 03-00-73 12-00-83 83%

PWR 492 129.0 WOLF CREEK 1 M

01-24-77 12-16-83 80%

PWR 4150 82.7 AVE: 1093 AVE: 113.3

AVERAGE C0H$TRUCTIOH DURATIOHS PAGE H0t 1-011 HUCLEAR POWER PLAHT$

CALENDAR YEAR 1984 - PROJECTED DURAlIDHS START FLD PERCENT TYPE DESIGH CONSTRUCTIDH NN PLANT HAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION SUSQUEHANNA 2 11-00-73 01-00-84 68%

BWR 1052 122.0 CLINTON 1 W

10-06-75 01-03-84 84%

BWR 950 98.9 BYRON 2 04-00-75 04-00-84 66%

PWR 1120 108.0 WATTS BAR 2 12-26-72 08-00-84 52%

PWR 1865 139.1 PALO VFRDE 2 06-00-76 08-01-84 88%

PWR 1304 98.0 LIMERICK 1 M

05-00-70 10-00-84 76%

BWR 1065 173.0 CATAWBA 1 M

05-16-74 10-00-84 90%

PWR 1145 124.5 HARRIS 1 W

01-14-74 12-00-84 66%

PWR 915 130.5 AVE: 1090 AVE: 124.3 CALENDAR YEAR 1985 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT NAME CONSTRUCTION ESTIMATE COMPLETE REACTOR MWE DURATION BRAIDWOOD 1 M

08-00-75 04-00-85 63%

PWR 1120 116.0 1

RIVER BEND 1 M

04-08-79 04-00-85 52%

BWR 934 71.7 BELLEFONTE 1 M

09-00-74 05-00-85 79%

PL1R 1235 128.0 WASHINGTON NUCLEAR 3 u

04-00-77 06-00-85 56%

PWR 1242 98.0 PALO VERDE 3 06-00-76 11-00-85 42%

PWR 1304 113.0 MILLSTONE 3 w

05-00-74 12-01-85 43%

PWR 1159 139.0 DEAVER VALLEY 2 M

05-04-74 12-31-85 56%

PWR 852 139.9 AVE: 112t AVE: 115.1 CALENDAR YEAR 1986 - PROJECTED DURATIONS START Ft D PERCENT TYPE DESIGN CONSTRUCTION MN PLANT NAME CONSTRUCTION ESTIMAlg COMPLETE REACTOR MNE DURATION HOPE CREEK 1 N

03-00-76 01-00-86 50%

BWR 1067 118.0 SEABROCK 2 07-00-76 02-28-86 15%

PWR 1198 115.9 HINE MILE POINT 2 M

08-25-75 03-00-86 50%

BWR 1080 126.2 BRAIDWOOD 2 03-00-75 04-00-86 49%

PWR 1120 128.0 BELLEFONIE 2 09-00-74 05-00-86 65%

PWR 1235 140.0 MARBLE HILL 1 M

08-00-77 06-00-86 41%

PWR 1130 106.0 V0GTLE 1 08-01-76 09-01-86 35%

PWR 1100 121.0 CATAWDA 2 05-16-74 10-00-86 45%

PWR 1145 148.5 SOUTH TEXAS 1 M

09-00-75 12-00-86 45%

PWR 1250 135.0 AVE: 1147 AVE: 126.5

AVERAGE C0NSTRUCTION DURATIONS PAGE N08 1-012 NUCLEAR POWER PLANTS CALENDAR YEAR 1987 - PRDJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT NAME CONSTRtfCTION ESTIMAT1 COMPLETE REACTOR

_tWE__

DURATION PERRY 2 10-00-74 05-00-87 41%

BWR 1205 151.0 MARBLE HILL 2 12-00-77 12-03-87 21%

PWR 1130 120.0 AVE: 1168 AVE: 135.5 CALENDAR YEAR 1988 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION un PLAKT NAME LEN51RUCTION ESTIMATE COMPLETE REACTOR

. MWE DURATION V0GTLE 2 03-01-76 03-01-38 11%

PWR 1100 139.0 HARRIS 2 01-14-74 06-01-88 04%

PWR 915 172.6 SOUTH TEXAS 2 09-00-75 12-00-88 18%

PWR 1250 159.0 AVE: 1088 AVE: 156.9 CALENDAR YEAR 1989 - PROJECTED DURATIONS START FLD PERCENT TYPE DESIGN CONSTRUCTION NN PLANT HAME CON S T R U_C,110N ESTIMATE QMPLETE R_EAQTOR

[1WE___

DURATION NORTH ANNA 3 4

07-00-72 04-00-89 08%

PWR 907 201.0 YELLOW CREEK 1 02-09-78 07-01-89 35%

PWR 1285 136.7 AVE: 1096 AVE: 168.9 CALENDAR YEARS 1990 THRU 1999 - PROJECTED DURATIONS START FLD PERCENT TYP'c DESIGN CONSTRUCTION um PLANT HAME CONS T RUC T (QN ESTTM4TE COMPLETE REACTOR MWE DURATION HARTSVILL E A-1 w

04-22-76 ci-01-90 44%

BWR 1205 164.3 HARTSVILLE A-2 04-22-76 01-01-91 34%

BWR 1205 176.3 PHIPPS BEND 1 M

10-19-77 01-00-93 29%

BWR 1220 182.4 AVE: 1210 AVE: 174.3 4

N E

O G)

La.J M

i i

l i

C0N$TRUCTION STATU$

REPQRT PAGE NO: 2-002 BEAVER VALLEY 2 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000412 CORPORATE CONTACT:

E. J. WOOLEVER, VICE PRESIDENT CP NO. & DATE ISSUED: CPPR-105/ 05-03-74 CP EXPIRATION DATE:

02-01-80 CORPORATE ADDRESS:

436 SIXTH AVENUE APPLICANT:

DUQUESNE LIGHT PITTSBURGH PENNSYLVANIA 15299 PLANT LOCATION:

5 MI E OF E. LIVERPOOL, ON IE REGION:

1 CORPORATE PHONE NO:

(412) 471-4300. EXT. 6430 AE STONE 8 WEBSTER NSSS:

WESTINGHOUSE CONSTRUCTOR:

STONE 8 WEBSTER NRC LPM:

E. DOOLITTLE REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

0852 IE RESIDENT INSPECTOR:

GLENN A. WALTON IN5PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY U T I L I T Y:

Aor. 1982 - Jun. 1932 REPORT BEG DATE END DATE DATE SCHEEULE RF,E2.RTED BY UTILITY NUMBER OF I;4SP.

OF INSP.

09-27-74 02-00-81 FINANCING PROBLEMS.

82-04 04-07-82 05-06-82 04-01-76 03-00-81 NO REASON GIVEN BY THE UTILITY.

82-05 04-05-82 04-08-82 07-14-76 12-00-81 SITE SOIL FOUNDATION PROBLEMS.

82-06 05-06-82 06-01-82 09-13-73 10-00-82 NO REASON GIVEN BY THE UTILITY.

11-15-78 12-00-53 FINANCIAL CONSIDERATIONS AND REDUCED LOAD FORECASTS.

l C6-19-80 12-00-85 REDUCTION IN LEVEL CF CONSTRUCTION Inspection Reports are available at local PDRs.

ACTIVITY DUE 10 FIK..NCI AL CONSIDERATIONS.

L0 CAL PUBLIC D0CUMENT R 0 0 M:

B. F. JONES MEMORIAL LIBRARY 663 FRANKLIN AVENUE ALIQUIPPA, PENNSYLVANIA 15001

C0NSTRUCTION

$TATUS REP 0RT PAGE NO: 2-003 BEAVER VALLEY 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION

$ T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-31-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LDADING DATE:

12-31-83 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

02-00-79 (LATEST) 12-31-84 APPLICANT'S CURRENT ESTIMATED CortMERCI AL CPERATION DATE: 05-31-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 56%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED MOBILIZE AND PREPARE SITE:

05-04-74 05-04-74 07-31-74 07-31-74_

% COMPLETE SYART

}lAPL

$0MP_L.FW 93

$_0M_P_LFE Ot!

100%

PLACE STRUCTURAL CONCRETE:

11-22-76 11-22-76

'09-03-84 90%

INSTALL REACTOR PRESSURE VESSEL:

11-30-81 11-16-81 12-28-81 100%

INSTALL LARGE BCRE PROCESS PIPE:

06-12-78 06-12-78 05-14-84 65%

INSTALL LARGE BCRE PIPE HANGERS. RESTRAINTS AND SNUBBERS:

07-17-78 07-17-78 05-14-84 40%

INSTALL SMALL BCRE PIPE:

12-01-81 01-04-82 05-03-85 13%

INSTALL CABLE TRAY:

03-28-77 03-28-77 07-11-83 79%

INSTALL EXPOSED METAL CONCUIT:

03-13-78 03-13-78 06-03-85 48%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

06-22-81 06-22-81 04-22-85 14%

INSTALL ELECTRICAL TERMINATIONS:

03-08-82 07-08-85 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

01-28-85 03-25-85 0%

CONDUCT HOT FUNCTIONAL TEST:

04-01-85 09-09-85 0%

C0". DUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-12-85 12-31-85 0%

C0NSTRUCTION STATUS REP 0RT PAGE NO 2-004 BELLEFONTE 1 NUCLEAR POWER PLANTS

'iT %TUS AS OF:

06-30-82 PLANT CHARACTER ISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000438 CORPORATE CONTACT:

E. G. PARRIS, MANAGER CP NO. 8 DATE ISSUED

  • CPPR-122/ 12-24-74 0F POWER CP EXPIRATION DATE:

03-01-82 CORPORATE ADDRESS:

500A CHESTHUT ST. TOWER II APPLICANT:

TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 37401 PLANT LOCATION:

6 MI NE OF SCOTTSBORD, ALA IE REGION:

2 CORPORATE PHONE NO:

(615) 751-2823 AE:

TENNESSEE VALLEY AUTHORITY HSSS:

BABC0CK 8 WILCOX CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC Lne:

UNASSIGNED REACTOR TYPE:

PUR IE PROJECT INSPECTOR:

P.

V. CRLENJAK DER (MWE):

1235 IE RESIDENT INSPECTOR:

J. WILCOX INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Aor. 1932 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.

RF_J N S P.

04-11-75 12-00-79 HO REASON NOTED.

8210 04-20-82 04-23-82 09-06-78 03-00-81 NO REASON HOTED.

8211 04-26-82 04-29-82 08-16-79 09-00-82 NO REASON HOTED.

8212 04-01-82 04-30-82 09-10-80 03-00-83 NO REASON HOTED.

8213 05-10-82 05-14-82 12-01-81 09-00-83 NO REASON HOTED.

8214 05-11-82 05-14-82 06-30-82 05-00-85 NO REASON NOTED.

8215 06-07-82 06-10-82 8216 05-01-82 05-31-82 8217 06-07-82 06-10-82 Inspection reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 Mr SCOTTSBORD PUBLIC LIBRARY 1002 SOUTH BROAD STREET SCOTTSBORD, ALABAMA 35768 l

C0NSTRUCTION STATU3 REPORT PAGE NO: 2-005 BELLEFONTE 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCT ION 5 T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

05-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

09-00-83 DEFINED IN CP: (EARLIEST) 06-01-79 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUt.NCE:

06-00-79 (LATEST) 12-01-79 APPLICANT'S CURRENT ESTIMATuD COMMERCIAL OPERATION DATE: 11-00-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 79%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START EIARl_

$0MPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

09-00-74 07-03-75 100%

PLACE STRUCTURAL CONCRETE:

06-00-75 10-00-75 10(%

INSTALL REACTOR PRESSURE VESSEL:

08-00-76 11-00-76 100%

INSTALL LARGE BORE PROCESS PIPE:

10-00-75 04-00-84 98%

INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:

05-00-77 04-00-84 81%

INSTALL SMALL DORE PIPE:

01-00-76 04-00-84 92%

INSTALL CABLE TRAY:

02-00-77 01-00-83 99%

INSTALL EXPOSED METAL CONDUIT:

04-00-75 12-00-83 94%

INST ALL PO!!ER. CONTROL, INSTRUMENTATION AND SECURITY CABLE:

11-00-77 05-00-84 79%

INSTALL ELECTRICAL TERMINATIONS:

03-00-78 05-00-84 71%

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

03-00-84 03-00-84 0%

CONDUCT IIOT FUNCTIONAL TEST:

06-00-84 08-00-84 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:

02-00-82 01-00-82 05-00-85 1%

C0N$TRUCTION STATUS REP 0RT PAGE NO: 2-006 BELLEFONTE 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000439 CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP HO. 8 DATE IISUED: CPPR-123/ 12-24-74 0F POWER CP EXPIRATION DATE:

12-01-83 CORPORATE ADDRESS:

500A CHESTNUT ST. TOWER II' APPLICANT:

TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 37401 PLANT LOCATION:

6 MI NE OF SCOTTSBORD, ALA IE REGION:

2 CORPORATE PHONE NO:

(615) 751-2823 AE TENNESSEE VALLEY AUTHORITY NSSS:

BABCOCK 8 WILCOX CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

R. V. CRLENJAK DER (MWE):

1235 IE RESIDENT INSPECTOR:

J. WILCOX IN$PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS R E P Q R T E.D BY U T I L I T Y:

Aor. 1982 - Jun, 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE iCHEDQLE R_EPORTED BY UTILTTY NUMBER OF INSP.

OF INSP.

04-11-75 12-00-79 NO REASON HOTED.

8210 04-20-82 04-23-82 09-06-78 03-00-81 NO REASON N01ED.

8211 04-26-82 04-29-82 08-16-79 09-00-82 NO REASON NOTED.

8212 04-01-82 04-30-82 09-10-80 12-00-83 NO REASON NOTED.

8213 05-10-82 05-14-82 01-20-82 09-00-84 NO REASON NOTED.

8214 05-11-82 05-14-82 06-30-82 '05-00-86 NO REASON NOTED.

8215 06-07-82 06-10-82 8216 05-01-82 05-31-82 8217 06-07-82 06-10-82 Inspection reports are available at local PDRs.

L0 CAL PUBLIC-DDCUMENT R 0 0 M:

SCOT TSBOR(1 PUBLIC LIBRARY 1002 SOUTH BROAD STREET SCOTTSBORD, ALABnMA 35768 I

d C0N5TRUCTIOH STATUS REPORT PAGE HO: 2-007 BELLEFONTE 2 HUCLEAR POWER PLAHTS STATUS AS Or:

06-30-80 C0HSTRUCTIOH STATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:

05-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

09-00-34 DEFINED IN CP: (EARLIEST) 03-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

03-00-80 (LATEST) 09-01-80 APPLICANT'S CURRENT ESIIMATED COMMERCIAL OPERATION DATE: 11-03-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 65%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START LOMP L E_TJ ON CptjPJ E TJ 03 % COMPJJTfF, MOBILIZE AND PREPARE SITE:

09-00-74 07-00-75 100%

PLACE STRUCTURAL CONCRETE:

06-00-75 09-00-75 100%

3 INSTALL REACTOR PRESSURE VESSEL:

02-00-77 02-00-77 100%

INSTALL LARGE BORE' PROCESS PIPE:

10-00-75 05-00-85 73%

INSTALL LARGE BORE PIPE HANGERS, RLL!RAINTe' APT SadDBERS:

07-00-78 05-00-85 44%

INSTALL SMALL BORE PIPE:

09-00-77 03-00-85 43%

i INSTALL CABl.E TRAY:

05-00-77 06-00-83 98%

INSTALL EXPOSED MElAL CONDUIT:

10-00-75 12-00-84 72%

INSTALL POWER, CO N T RO L ', INSTRUMENTATION AND SECURITY CABLE:

03-00-78 06-00-85 60%

INSTALL ELECTRICAL TERMINATIONS:

04-00-78 06-00-85 54%

CONDL'CT REACTOR COLD HYDROSTATIC TEST:

04-00-85 04-0.0-85 0%

CONDUCT HOT FUNCTIONAL TEST 07-00-85 09-00-85 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

04-00-85 05-00-86 0%

l

C0NSTRUCTION STATUS REPORT PASE NO: 2-008 BRAICuGOD 1 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLAN 7

  • 84 3 R A C T E R I S T I C S:

r, E Y PERS0NNELa DOCKET h:'

05000456 CORPORATE CONTACT:

B. LEE, VICE PRESIDENT CP NO. t DATE ISSUED: CPR-132 / 12-31-75 CP EXPIRATION DATE:

11-01-82 CORPORATE ADDRESS:

P. O. BOX 767 APPLICANT:

COM 10NWEALTH EDISON CHICAGO, ILLINDIS 60690 PLANT LOCATION:

24 MI SSW OF JOLIET. ILL 1

IE REGION:

3 CORPORATE PHONE NO:

(312) 294-3103 AE:

SARGENT 8 LUNDY HS$$:

WESTINGHOUSE CONSTRUCTOR:

COMMONWEALTH EDISDN NRC LPM:

K. KIPER REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

J. HINDS DER (MWE):

1120 IE RESIDENT INSPECTOR:

L. MC GREGOR INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES 4

TIME PERIOD A$ REPORTED BY UTILITY Aor. 1982 - Jun. 1982 i

REPORT NEW REASON FGR CHANGE REPORT BEG DATE END DATE DATE

}fdif DUL F REPORTED BY UTILITY

!!MBl3 OF INSP.

OF INSP.

01-08-80 04-00-82 NO REASON REPORTED.

1 NO INSPECTIONS FOR THIS PERIOD.

05-14-80 04-00-83 DELAY DUE TO FINANCIAL CONSIDERATIONS.

09-15-80 04-00-85 NO REASON REPORTED.

Inspection Reports are available at local PDRs.

i r

i L0 CAL PUBLIC D0CUMENT R 0 0 M:

I WILMINGTON TOWNSHIP PUBLIC LIBRARY 231 S. KANKAKEE REET WILMIMGTON, ILLINDIS 60481 1

C 0 N-S T R U C T ION STATUS R EPORT PAGE NO: 2-009 BRAIDWO3D 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82.

CDNSTRUCT ION 5TA TUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS AP."LITANT'S PREVIGUS ESTIMATED Fl!EL LOADING DATE:

04-00-83 DEFINED IN CP: ! EARLIEST) 11-01-80 APPLI.Ji;'S ESTIMATED FtfEL L O.*.DII:G D A T E A T CP ISSUANCE:

05-00-81 (LATEST) 11-02-82 APPLICAN4'S CURRENT ESTIttATED COMMERCIAL OPERATION DATE: 10-31-85 CURRENT ESTIMATED PERCENT Cot:STRUCTION COMPLETE: 634 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START MARL COMPLETION

[DPjr_LUJp3 % COMPLETE MOBILIZE AND PREPARE SITE:

08-00-75 03-00-76 100%

a PLACE STRUCTURAL CONCRETE:

03-00-76 07-00-84 98%

INSTf.LL REACTOR PRESSURE VESSEL:

04-00-79 04-00-79 100%

iHSTALL LARGE BORE PROCESS PIPE:

04-00-76 06-00-83 77%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUSDERS:

08-00-77 06-PJ-84 40%

INSTALL SMALL BORE PIPE:

08-00-76 01-00-84 29%

INSTALL CABLE TRAY:

12-00-76 12-00-82 98%

A INSTALL EXPOSED METAL CONDUIT:

08-00-78 05-00-84 40%

INSTALL POWER. CONTROL, INSTRUMENTATIDH AND SECURITY CABLE:

11-00-78 06-00-84 23%

INSTALL ELECTRICAL TERMINATIONS:

11-00-78 07-00-84 23%

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

09-00-82 09-00-82 0%

CONDUCT NOT FUNCTIONAL TEST:

08-00-84 04-00-85 0%

C0" DUCT PREOP t.ND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

10-00-82 04-00-85 0%

C L' N S T R U C T I O N STATUS REPORT PAGE NO: 2-010 BRAIDWOOD 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

05000457 CORPORATE CONTACT:

B. LEE, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPR-133 / 12-31-75 CP EXPIRATION DATE:

11-01-83 CORPORATE ADDRESS:

P. O. BOX 767 APPLICANT:

COMMONWEALTH EDISON CHICAGO. ILLINDIS 60690 PLANT LOCATION:

24 MI SSW OF JOLIET. ILL IE REGION:

3 CORPORATE PHONE NO:

(312) 294-3103 AE:

SARGENT 8 LUNDY NSSS WESTINGHOUSE CONSTRUCTOR:

C0ftMONWEALTH EDISON HRC LPM:

K. KIPER REAC10R TYPE.

PWR IE PROJECT INSPECTOR:

J. HI:1DS DER (MWE):

1120 IE RESIDENT INSPECTOR:

L. MC 09ECOR INSPECT ION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UT ILITY:

Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE pA_TJ 5CH! D.JM EJLDEF_D_Bl_U_T_Y_t_UX NUMBF31 0F INSP.

OF INSL 01-08-80 04-00-83 NO REASON REPORTED.

NO INSPECTIONS FOR THIS PERIOD.

05-14-30 04-00-84 DELAY CUE TO FINANCIAL CONSIDERATIONS.

0?-15-80 04-00-36 NO REASON REPORTED.

Inspection Reports are availabic at local PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 M:

WILMINGTON TOWNSHIP PUBLIC LIBRARY 201 S. KANKAKEE STREET WILMINGTON, ILLINDIS 60481

C0NSTRUCT ION STA TU3 REPORT PAC'E NO: 2-011 BRAIDWOOD 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION

$ T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIt1 ATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING,DATE:

04-00-84 DEFINED IN CP: (EARLIEST) 11-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-82 (LATEST) 11-01-83 j

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-31-86 e

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 49%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

i 1

ESTIMATED ACTULL ESTIMATED ACTUAL ESTIMATED START

.SIAR1_

LOUCLEllEM

[000.LETIOS K_C0CPLET6 1

MOBILIZE AND PREPARE SITE:

03-00-75 03-00-76 10c:

PLACE STRUCTURAL CONCRETE:

03-00-76 07-00-84 93%

INSTALL REACTOR PRESSURE VESSEL:

18-00-80 11-00-80 1004 INSTALL LARGE BORE PROCESS PIPE:

05-30-76 C2-00-33 25%

IMST ALL L ARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

08-00-77 09-00-85 16%

I INSTALL SMALL BORE PIPE:

08-C0-76 12-03-84 13%

INSTALL CABLE TP.AY:

12-00-76 12-00-83 56%

INSTALL EXPOSED METAL LONDUIT:

01-00-79 05-00-85 5%

INSTALL POWER, CONTROL, INSTRUMENTATICH AND SECURITY CABLE:

12-00-78 06-00-85 2%

INSTALL ELECTRICAL TERMINATIONS:

12-00-78 07-00-F.5 1%

CONDUCT REACTOR COLD HYDRCSTATIC TEST:

06-00-83 C6-00-C3 0%

l CONDUCT NOT FUNCTIONAL TEST:

04-00-85 04-00-86 0%

i CONDUCT PRE 0? AND ACCEPTANCE TESTS NECESSARY FCR FUEL LOAD:

10-00-83 04-00-86 C:

I 4

4 i

CDN$TRUCT ION

$TA TUS REPQRT PAGE NO: 2-012 SYECt? 1 NUCL EAR POMER PLANTS LTATUS AS OF:

06-30-82 PL NT CHARACT ER IST I C 5:

KEY P E R S 0 I; N E L :

I l

CCrKET l'0:

05000454 CO2PORATE CONTACT:

B. LEE. VICE PRESIDENT Cr NO.

  • DATE ISSUED:

C"R-130 / 12-31-75 CP EXPIPATICN DA:L:

CORPORATE ADDRESS:

P. O.

BOX 767 c.r P L I C t.M T :

Cot

  • MOD *4EAL TH IDISON CllIC AGO. ILLINDIS 60690 l' L
  • N T L CC A T I ?!!:

9 7 f1I SM OF ROCKFORD. ILL I E 20 C !.'f;-

3 CORPOPATE PHONE NO:

(312) 294-3103 AE:

SARCENT 2 L U!!DY NSSS:

L ESi!!1G!ICUSE CTUTRUCTCR:

C oi:110?'U f iL T H EDISON HRC LPM:

S. CtfESTHUT T:L ? C I OR TYPE:

T:*1 IE PROJECT INSPECTOR:

J.

HINDS PI 2 U ;E):

1120 IE RESIDENT INSPECTOR:

W.

FORNEY I ti SPECT I O !! S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UT I L I T Y:

Ape. 198? - Jim. 19 R_q REPORT NE!!

REASON FOR CllANGE REPORT BEG DATE END DATE DALE ict!F01Ltj R_F_P_03.I._E D BY U T I L I T Y G C.7 E 3.

P E_7ES P.s PL IJ3L 01-05-77 10-00-80 HD REASCN GIVEN.

8202 01-25-32 02-19-82 03-01-78 03-01-81 REVISED LOAD DEMAND FORECAST.

SCCS 03-29-82 CS-11-82 01-08-80 04-00-32 NO REASON REPCRTED.

8206 05-33-82 CS-00-82 09-15-20 04-00-83 NO REASON REPGRTED.

C?O7 03-22-C2 0'+-30-?N 8:09 05-13-32 05-19-82 Insanction Raports are available at Iocal PDRs.

L 0 CAL PU3L IC D0CUMENT R 0 0 f1:

B)NCN PUBLIC LI3R?.RY it:T CD f r9 P?,F Hi?:GTON S!REET L EOM. ILilMCI5 6!01J

. _ _ _. _ _ _ _.. ~

r CDHSTRUCTION STATU~

REPQRT

' PACE NO: 2-013 BYRON 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 r

C 0 H.S i RUCT ION 5 T A T U 5:

APPLICAt;T'S CHOREtti ESTIMATED ttfrL LPADING DATE:

04-00-33 APPLICANTS CONSTRUCTICH CCMPLETION ESTIMATE AS i

APPLICT!!T'S PREVIOUS ESTIMATED FUEL LO? PING D*.TE:

04-04-2 DEFINED IN CP: (CADLIEST) 05-01-30 t

1.PPLIC A:iT'S EST I!MTTD F UEL t 0 ADING D AIE A T CP ISSUt.NCE2 35-00-80 (LAIESI) 06-01-82 APPLICAti!'S CU2 RENT E5TIIMTLD Cut:::ERCI?,L OPERATICN C;IE: 2 2 -2 7 -?, ".

CUP 7ENT ESTIMATED PERCENT C0tlSTRUCTION COMPLETE: 82%

CC" TEN TS REG?.RD!tiG Ct!OREN T CO:4STRUCTION STAitt$:

[.

I ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

_S.I $ R T 5_U R L

.CPEP_t ET T 0tt p.00P t_EJ.T 03 X_SQUPLETE MC3ILIZE AND PREPARE SITE:

04-00-75 12-00-75 100*4 PL ACE STR!fCTUR tt C0!iCRETE:

12-00-75 07-00-82 99%

I:: STALL REACTOR PRESSURE VESSELt 09-00-73 11-00-78 100%

INSTALL LARGE PORE PROCESS PIPE:

01-00-76 07-00-33 99%

l' I!! STALL LACGE BORE PIPE HANGERS. ?' STRAINTS AND SNUBBERS:

05-00-77 07-00-83 8S%-

ItSTALL SMALL CORE PIPL:

03-00-75 06-00-82 97%

INSTALL CABLE TOAY:

12-00-76 11-00-31 11-00-81 100%

i INST ALL EXPOSED METtt CONDUIT:

02-00-73 11-00-82 83%

INSTALL POWER. C0!!! R O L. I!1SIRUMENT ATION t.t:D SECtfRI1Y CABLE:

00-00-78 12-00-82 81%

l INSTALL ELECTRTCAL TEPMINATIC':S:

~03-00-7C 02-00-83 59%

CONDUCT REACTOR COLD ltYPRCSTATIC TEST:

07-00-81 07-00-81 100%

C3? DUCT HOT IU;lCTIOilAL TEST:

11-00-82 04-00-83

-0%

f CONDUCT PREOP AND ACC'PTA!CE TESTS NECESSARY IOR FUEL LOAD:

06-00-80 04-00-83 37%

i l

i l

r t

i

~w

CDN5TRUCTION STATUS REP 0RT PAGE NO 2-014 BYRON 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I 5 T I C S:

KEY PERSONNELa DOCKET NO:

05000455 CORPORATE CONTACT:

B. LEE, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPR-131 / 12-31-75 CP EXPIRATION DATE:

CORPORATE ADDRESS:

P. D. BOX 767 APPLICANT:

COMMONWEALTH EDISON CHICAGO. ILLIN0IS 60690 PLANT LOCATION:

17 MI SW OF ROCKFORD. ILL IE REGION:

3

. CORPORATE PHONE NO:

(3121 294-3103 AE SARGENT 8 LUNDY NSSS:

WESTINGHOUSE CONSTRUCTOR:

COMMONWEALTH EDISON NRC LPM:

S. CHESTHUT REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

J. HINDS DER (MWE):

1120 IE RESIDENT INSPECTOR:

14. FO!!NEY

~.

INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Anr. 19R2 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE Er ') DATE DATE SCHEDULE RFPORTED BY UTILITl NUMBER OF INSP.

OF I!!SP.

01-14-76 05-00-82 NO REASON NOTED.

8204 03-29-82 05-11-82 01-08-80 03-00-83 NO REASON REPORTED.

8205 03-22-82 04-30-82 09-15-80 04-00-34 NO REASON REPORTED.

8206 05-18-82 05-19-82 Inspection Reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 M:

BYRON PUBLIC LIBRARY THIRD AND WASHINGTON STREET BYRON, ILLINOIS 61010

C0NSTRUCT ION STATUS REPQRT PAGE NO: 2-015 BYRON 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0N$TRUCTION S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

03-00-83 DEFINED IN CP (EARLIEST) 11-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-81 (LATEST) 11-01-83 APPLICANT'S CURRENT ESTIMATED con!1ERCIAL OPERATIDH DATE: 02-28-85 i

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 66%

COMMENTS REGARDING CURRENT CONSTRUCTION STA1US:

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED j

START START _

$_0HCLE TJ ON C00CLETION % C05PLf1F q

j MOBILIZE AND PREPARE SITE:

04-00-15 02-00-/6 8004 l

PLACE STRUCTURAL CONCRETE:

02-00-76 07-00-82 98%

INSTALL REACTOR PRETSURE VESSEL:

07-00-79 10-00-79 100%

INSTALL LARGE BORE PROCESS PIPE:

05-00-76 08-00-83 50%

INSTA.L LARGE BORE PIPE NANGERS, RESTRAINTS AND $NUBBERS:

05-00-77 07-00-84 29%

l INSTALL SMALL BORE PIPE:

08-00-76 01-00-84 20%

IhSTALL CABLE TRAY:

12-00-76 06-00-82 96%

INSTALL EXPOSED METAL CONDUIT:

02-00-78 09-00-83 40%

INSTALL POWER, CONTROL. INSTRUMENTATION AND SECURITY CABLE:

11-00-78 10-00-83 27%

INSTALL ELECTRICAL TERMINATIONS:

11-00-78 11-00-83 26%

l CONDUCT REACTOR COLD NYDR0 STATIC TEST:

03-00-83 03-00-83 0%

CONDUCT HOT FUNCTIONAL TEST:

09-00-83 04-00-84 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR TUEL LDAD:

04-00-83 04-00-84 0%

4 l

)

C0NSTRUCTION STATUS REPORT PAGE NO: 2-016 CALLAWAY 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CNARACTERISTICS:

KEY F ERS0NNEL DDCKET NO:

05000483 CORPORATE CONTACT:

D. F. SCNNELL, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-139/ 04-16-76 NUCLEAR CP EXPIRATION DATE:

02-23-82 CORPORATE ADDRESS:

F. D.

BOX 149 APPLICANT:

UNION ELECTRIC ST. LOUIS, MISSOURI 63166 FLANT LOCATION:

10 MI SE OF FULTCN, MO IE REGION:

3 CORPORATE PHONE NO:

(314) 621-3222 AE:

DECHTEL NSSS:

WESTINGHOUSE CONSTRUCTOR:

DANIEL INTERNATIONAL NRC LPM:

G. EDISON REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

J. KONKLIN DER (tr.lE):

1183 IE RESIDENT INSPECTOR:

J. NEISLER INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY U T I L I'T Y:

Anr. 1932 - Jun, 19.*l REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE p.* T E iCjiEDjlLE REPORTED BY UTILITY llyMR OF INSL OF INSP.

02-14-77 12-01-81 FINANCING IMPACT OF PROPOSITION 1 PASSAGE 8202 03-16-82 03-19-82 BY STATE OF MISSOURI VOTERS.

03-02-78 04-01-82 NO REASON PROVIDED BY THE UTILITY.

09-21-80 10-01-82 NO REASON PROVIDED.

Inspection Reports are availabic at local PDRs.

10-09-81 06-01-83 THE DELAY RESULTED PRIMARILY FROM PROBLEMS WITH MEETING CONSTRUCTION SCHEDULES AND A REAPPRAISAL OF THE WORK REMAINING TO BE COMPLETED.

L0 CAL PUBLIC DDCUMENT R 0 0 M:

FULTCH CITY LIBRARY OLIN LIBRARY OF WAS!f!NGTON 739 f1ARKET STREET UNIVERSITY-FULTC:; MISS007I 65251 SKIT!KER 8 LINDELL BLVD.

ST. LOUIS, IIISSOURI 63130

C0NSTRUCT ION STATUS REPQRT PACE NO: 2-017 CALLAMAY 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82' C0NS*RUCT ION 5TA T U S:

APPLICAtlT'S CURRENT ESTIMATED FUEL LOADING PATE:

06-01-83 APPLICAt!TS CONSTRUCTION CCMPLETION ESTIMATE AS APPLICANI'S PREVIOUS ESTIt1ATED FUEL LOADING DATE:

10-01-82 DEFINED IN CP: (EARLIEST) 06-30-81 APPLICANT'S ESTIt1ATED FUEL LOADING DATE AT CP ISSUANCE:

06-01-81 (LATEST) 02-28-82 APPLICANT'S CURRENT ESTI!!ATED COMMERCIAL OPERATION DATE: EARLY 1984 CURRENT ESTIMATED PERCENT CONSTRUCTION C0t1PLETE: 82%

COl:MENTS REGARDING CURRENT CONSTRUCTION STATUS: UNION ELECTRIC IS CURRENTLY IN PROCESS OF REVISING CONSTRUCTION AND STARTUP SCHEDULE. IT APPEARS THAT THERE WILL BE SOME CHANGES IN MAJOR FROJECT MILESTONES UHICH WILL BE REFLECTED IN THE NEXT UPDATE.

s ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START STARl_

C01E_FJJM LOELETION 3 _CMPJ fJJ MO3ILIZE AND PREPARE SITE:

09-03-75 05-01-76 100%

PLACE STRtlCTURAL CONCRETE:

04-01-76 10-01-82 99%

INSTALL REACTOR PRESSURE VESSEL:

03-15-79 G8-01-82 88%'

INSTALL LARGE DORE PROCESS PIPE:

01-12-78 08-01-82 96%

It!ST ALL LARGE ECRE PIPE HANGERS RESTRAINTS AND SNUBRERS:

01-10-78 04-01-83 70%

INSTALL Siti.LL CORE PIPE:

01-19-78 01-02-83 92%

INSTALL CABLE TRAY:

07-09-78 07-01-82 98%

INSTALL EXPOSED f!ETAL CONDUIT:

07-01-78 01-02-83 88%

INSTALL FOWER CONTROL, INSTRUMENTATION AND SECURITY CARLE:

08-08-79 02-01-83 82%

INST ALL ELECTRICAL TERT 11NAT IONS:

04-04-80 03-01-83 60%

CONDUCT REACTOR COLD flYDR0 STATIC TEST:

07-23-82 07-27-82 0%

CO?muCT HOT TUNCTI0t!AL TEST:

12-06-82 12-17-82 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

12-31-81 10-30-81 04-07-83 16%

i i

l 9

i

C0N!

RUCTION STATUS REP 0RT PAGE NO: 2-018 CATAWBA 1 NUCLEAR P OWER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000413 CORPORATE CONTACT:

H.B. TUCKER, VICE PRESIDENT CP HO. 8 DATE ISSUED:

CPR-116 / 08-07-75 NUCLEA PRODJCTION, DUKE POWER CO.

CP EXPIRATION DATE:

06-01-81 CORPORATE ADDRESS:

PB 33189, 422 S. CHRUCH STREET APPLICANT:

DUKE POWER CHARLOTTE, NORTH CAROLINA, 28242 PLANT LOCATIDH:

6 MI NNW OF ROCK HILL, SC IE REGION:

2 CORPORATE PHONE NO:

(704) 373-4531 AE DUKE POWER NSSS:

WESTINGHOUSE CONSTRUCTOR:

DUKE POWER NRC LPM:

K. JABBOUR REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1145 IE RESIDENT INSPECTOR:

K. VAN DOORN INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY U T I L I T Y:

Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-27-74 08-00-80 CONSTRUCTIDH DELAYS DUE TO CRITICAL 8208 04-05-82 04-08-82 CO?IDITIONS EXISTING IN THE FINANCIAL 8209 04-13-82 04-16-82 MARKETS.

8211 04-26-82 04-27-82 05-00-77 09-00-80 REVISED LOAD FORECASTS.

8212 05-25-82 05-28-82 03-00-78 02-00-81 PROJECTED LOAD FORECAST.

8213 04-26-82 05-25-82 01-00-80 06-00-83 NO REASON REPORTED.

8214 06-08-82 06-11-82 05-01-80 04-00-83 NO REASON REPORTED.

8215 06-08-82 06-11-82 08-00-80 08-00-83 MAJOR UNIT RESCHEDULE.

05-00-82 11-00-84 NO REASON REPORTED.

I Inspection reports are available at local PDRs.

08-00-82 10-00-84 REASSESSMENT OF SCOPE OF REMAINING WORK.

l 4

L0 CAL PUBLIC D0CUMENT R00M YORK COUNTY LIBRARY 325 SOUTH OAKLAND AVENUE ROCK HILL, SOUTH CAROLINA 29730 1

4 C0N5TRUCTION-STATUS REPORT PAGE ND: 2-019 CATAWBA I NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 o

C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

10-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

08-00-83 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

12 00-78 (LATEST)

APPLICANT'S CURRENT ESTIMATED C0t1MERCIAL OPERATION DATE: 06-00-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 90%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.

STATUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

._._S T A R T START _

C OMP_L E_T_I OH

[0UP_LETIDH 3 CQt1PLETF MOBILIZE AND PREPARE SITE:

05-16-74 05-16-74 10-01-76 04-01-76 100::

PLACE STRUCTURAL CONCRETE:

04-01-76 04-05-76 99%

INSTALL REACTCR PRESSURE VESSEL:

06-01-78 06-09-78 07-13-78 07-13-78 100%

INSTALL LARCE BORE PROCESS PIPE:

04-01-77 04-08-77 08-01-83 97%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

11-01-78 11-01-78 07-16-84 7S%

INSTALL SMALL BORE PIPE:

N/A N/A N/A N/A N/A INSTALL CABLE TRAY:

N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT:

N/A N/A N/A N/A N/A INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

08-01-78 08-21-78 08-27-84 88%

INSTALL ELECTRICAL TERMINATIONS:

09-01-78 10-06-78 09-10-84 76%

CONDUCT REACTOR COLD HYDROSTATIC 1EST:

02-00-84 02-00-84 0%

CONDUCT HOT FUNCTIONAL TEST:

OS-00-84 06-00-84 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

10-00-84 0%

+

1 I

s

CDHSTRUCTION STATUS REPORT PAGE NO: 2-020 CATAWBA 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 3

P L A :! T CHARACTERISTICSt KEY PERS0NNEL:

DOCKET NO:

05000414 CORPORATE CONTACT:

H.

B.

TUCKER, VICE PRESIDENT.

CP NO 8 D4TE ISSUED:

CPR-117 / 08-07-75 HUCLEAR PRODUCTION, DUKE POWER CO.

CP EXPIRATIDH DATE:

06-01-82 CORPORATE ADDRESS:

PB 33189. 422 S. CHURCN STREET APPLICANT:

DUKE POWER CHARLOTTE. NORTH CARCLINA 28242 PLANT LOCATION:

6 MI NNW DF ROCK HILL. SC IE REGION:

2 CORPORATE PHONE NO:

(704) 373-4531 AE DUKE POWER HSSS:

WESTINGHOUSE CONSTRUCTOR:

Dt!KE POWER NRC LPM:

K. JABBOUR REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER ( f1ME ) :

1145 IE RESIDENT INSPECTOR:

K. VAN DOORN INSPECT ION STATUS FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITY:

Apr. 198? - Jan. 198R REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HMMEER OF INSP.

OF INSP.

09-27-74 08-00-81 CONSTRUCTION DELAYS DUE TO CRITICAL 8208 05-25-82 05-28-82 CONDITIONS EXISTING IN THE FINANCI AL 8209 04-26-82 04-27-82 MARKETS.

8210 04-26-82 05-25-82 05-00-77 08-00-82 REVISED LOAD FORECASTS.

8211 06-08-82 06-11-82 03-05-80 10-00-84 NO REASON GIVEN.

8212 06-08-82 06-11-82 08-00-80 02-00-85 MAJOR UNIT RESCHEDULE.

05-00-82 03-00-87 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

08-00-82 10-00-86 REASSESSMENT OF SCOPE OF REMAINING WORK.

~i I

L0 CAL PUBLIC D0CUMENT R 0 0 M:

YORK COUNTY LIBRARY 1

'25 SOUTH DAKLAND AVENUE ROCK HILL, SOUTH CAROLINA 29730 2"

C0N5TRUCTION STATUS QEPOQT PAGE NO: 2-021 CATAL!BA 2 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCT ION S T A T U S:

ArPLICANT'S CURRENT ESTIMtIED TUrL LOADING DATE:

10-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIGATED TUEL LOADING DATE:

02-00-85 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LDADING 3*TE AT CP ISSUANCE:

12-00-79 (LATEST)

APPLICA?iT'S CURRENT ESTIMATED CCMMERCI AL OPERATION DATE: 06-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 4 5T.

COMMENTS REGARDING CURRENT CCNSTRUCTID3 STATUS: STATHS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.

STAlus IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETIQH

[DMPLETIqH %_SD*TLETE MOBILIZE AND PREPARE SITE:

05-16-74 05-16-74 10-01-76 04-01-76 1d0%

PLACE STRUCTURAL CCHCRETE:

08-01-76 08-01-76 96%

j INSTALL REACTOR PRESSURE VFSSEL:

01-05-80 01-18-80 04-15-MG 04-15-80 100%

INSTALL LARGE 20RE PROCESS PIPE:

01-05-77 01-05-77 05-03-85 59%

INSTALL LARG" DnPE PIPE ilANGERS, RESTRAI'4!$ AND SMUBBERS:

07-01-81 06-10-86 9%

INSTALL SMALL B3RE PIPE:

N/A N/A N/A N/A N/A IMSTALL CABLE TRAY:

N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT:

N/A N/A N/A N/A N/A IMSTALL 001:CC, CCMiPOL, INSTRUMENTATION AND SECURITY CABLE:

11-01-79 11-01-79 11-18-85 26%

IMST All ELECTRICAL T E0111NATI0iiS:

11-15-79 11-19-79 12-01-85 17%

to':rUCT RE'.CTOR CGLD HiDRCSTATIC !ESI:

01-00-86 01-00-86 0%

CPNOUCT H0r TUMCTIONAL TEST:

05-00-86 06-00-86 0%

COMD"CT PRCOP AND ACCEP1ANCE TESTS NECESSARY FOR TUEL LOAD:

10-00-86 0%

C0NSTRUCTION 5TATUS REP 0RT PAGE NO: 2-022 CHEROKEE 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET NO 05000491 CORPORATE CONTACT:

L. C. DAIL VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-167/ 12-30-77 DESIGN ENGINEERING, DUKE POWER CO.

CP EXPIRATION DATE:

CORPORATE ADDRESS:

PB 33189, 422 S. CHURCH STREET APPLICANT DUKE POWER CHARLOTTE, NORTH CAROLINA 28242 PLANT LOCATION:

21 MI E OF SPARTANBURG, SC IE REGION:

2 CORPORATE PHONE NO:

(704) 373-4062 AE:

DUKE POWER NSSS:

COMBUSTION ENGINEERING CONSTRUCTOR:

DUKE POWER HRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1280 IE RESIDENT INSPECTOR:

INSPECTION S T A T U S:

FUEL LDAD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY:

Aor, 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE EfPQRTED BY UTLUE NUMBER OF INSP.

OF INSP.

05-09-78 05-00-84 REVISED LOAD FORECAST.

NONE 03-05-80 07-00-89 NO REASON GIVEN.

09-30-81 N/S INDEFINITELY DELAYED.

Inspection reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 Mr CHEROKEE COUNTY LIBRARY 300 E. RUT!. EDGE AVENUE GAFFNEY, SOUTH CAROLINA 29340 1

~

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-023 CHEROKEE 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PAEVIOUS ESTIMATED FUEL LOADING'DATE:

07-00-89 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

GS-00-83 (LATEST) 4 APPLICANT'S CURRENT ESTIMATED C0f1MERCIAL OPERA 110H DATE: N/S j

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

18%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: INDEFINITELY DELAYED.

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START SLARI_

C0t1PLETIDH C0f1PJ ET.03 UO!JPJfE MOBILIZE AND PREPARE SITE:

01-09-16 03-01-78 100%

PLACE STRUCTURAL CONCRETE:

03-01-78 48%

INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

05-30-76 1%

INSTALL EXPOSED METAL CONCUIT:

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

I INSTALL ELECTRICAL TERMINATI0HS:

CONDUCT REACTOR COLD HYDROSTATIC TEST:

CONDUCT HOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

l

-_=

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-024 CHEROKEE 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET NO:

05000492 CORPORATE CONTACT:

L. C. DAIL, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-168/ 12-30-77 DESIGN ENGINEERING, DUKE POWER CO.

CP EXPIRATION DATE:

CORPORATE ADDRESS:

PB 33189, 422 S. CHURCH STREET APPLICANT:

DUKE POWER CHARLOTTE, NORTH CAROLINA 28242 PLANT LOCATION:

21 MI E OF SPARTANBURG, SC IE REGIDH 2

CORPORATE PHONE NO:

(704) 373-4062 AE DUKE POWER NSSS:

COMBUSTION ENGINEERING CONSTRUCTOR:

DUKE POWER NRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MUE):

1280 IE RESIDENT INSPECTOR:

i INSPECT ION S T A T U S:

FUEL LOAD DATE CHAHGES TIME PERIOD AS REP 0RTED BY UTIL I T Y:

Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1pHFDULE REPORTED BY UTILITY NUf1B E3 0F INSP.

OF INSP.

01-25-78 11-00-85 1

LOWER FORECASTS FOR GROWTH IN DEMAND.

NOME 2.

UNCERTAINTY REGARDING THE PERKINS UNITS.

04-31-78 05-00-86 PROJECTED LOAD GROWTH.

i Inspection reports are available at local PDRs.

03-05-80 07-00-91 NO REASON GIVEN.

09-30-81 N/S INDEFINITELY DELAYED.

L0 CAL PUBLIC D0CUMEHT R 0 0 N:

CHEROKEE COUNTY LIBRARY 30J E.

RUTLEDGE AVENUE GAFINEY, SOUTH CAROLINA 29340 1

k

l C0NSTRUCTION STATUS REPQRT PAGE NO: 2-025 CHEROKEE 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCT ION S T A T U 5:

1 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-00-91 DEFINED IN CP: (EARLIEST)

I APPLICANT'S ESTI'1ATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-85 (LAiEST)

APPLICANI'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S l

l CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

04 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: INDEFINITELY DELAYED.

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START _

LOMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

07-09-76 50%

PLACE STRUCTURAL CONCRETE:

INSTALL REACTOR PRESSURE VESSEL:

j INSTALL LARGE BORE PROCESS PIPE:

INSTALL L ARGE BORE PIPE !! ANGERS. RESTR AINTS AND SNUBBERS:

INSTALL SMALL BORE PIPE:

i, INSTALL CABLE TRAY:

INSTALL EXPOSED METAL CONDUIT:

INST ALL PO!!ER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS:

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

j CONDUCT NOT FUNCTIONAL TEST:

1 CONDUCT PREOP AND ACCEPT ANCE TESTS NECESSARY FOR FUEL LOAD:

J

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-026 CHEROKEE 3 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERI$TICSt KEY PERS0NNEL:

DOCKET NO:

05000493 CORPORATE CONTACT:

L. C. DAIL, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-169/ 12-30-77 DESIGN ENGINEERING, DUKE POWER CO.

CP EXPIRATION DATE:

CORPORATE ADDRESS:

PB 33189, 422 S. CHURCH STREET i

APPLICANT:

DUKE POWER CHARLOTTE, NORTH CAROLINA 28242 PLANT LCCATION:

21 MI E OF SPARTANBURG, SC IE REGION:

2 CORPORATE PHONE NO:

(704) 373-4062 AE:

DUKE POWER NSSS:

COMBUSTION ENGINEERING CONSTRUCTOR:

DUKE POWER NRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1280 IE RESIDENT INSPECTOR:

IN$PECTION S T A T U S:

F U E.L L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITY:

Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1[HREUlf REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

04-00-80 N/S INDEFINITELY DELAYED.

NONE Inspection reports are available at local PDRs.

I i

s L0 CAL PUBLIC D0CUMENT R00M CHEROKEE COUNTY LIBRARY 300 E. RUTLEDGE AVENUE GAFFNEY, SOUTH CAROLINA 29340 a

J

CDHSTQUCTION STATUS REPORT PAGE NO: 3-027 CHEROKEE 3 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION 5 T,A T U St APPLICANT'S CURRENT ESTIMATED FUEL LO4 DING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LUADING-DATE:

0S-00-88 DEFINED IN CP: (EARLIEST) i APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-88 (LATEST)

APPLIC4HT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S l

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

0%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: INDEFINITELY DELAYED.

1 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11ARl_

COMPLETION CnMPLETION 3_fD"PLETE j

MOBILIZE AND PREPARE SITE:

07-09-76 50%

i PLACE STRUCTURAL CONCRETE:

INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

l INSTALL LARGE BORE PIPE HANGERS RESTRAINTS AND SNUBBERS:

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

1 INSTALL EXPOSED METAL CONDUIT:

INSTALL POWER. CONTROL. INSTRUMENTATIDH AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS:

CONDUCT REACTOR COLD HYDROSTATIC TEST:

CONDUCT HOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD i

1 l

C0N$TRUCTION STATUS REPQRT PAGE HO: 2-028 CLINTON 1 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET NO:

05000461 CORPORATE CONTACT:

W. C. GERSTHER, EXEC VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-137/ 02-24-76 CP EXPIRATION DATE:

CORPORATE ADDRESS:

500 SOUTH 27TH STREET APPLICANT:

ILLINDIS POWER DECATUR. ILLINDIS 62525 1

1 PLANT LOCATION:

6 MI E OF CLINTON, ILL j

IE REGION:

3 CORPORATE PHONE HO:

(217) 937-1111, ri.'. 2811 l

AE2 SARGENT 8 LUNDY NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BALDWIH ASSOCIATES NRC LPM:

H. WILLIAMS I

REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

H. M. WESCOTT j

DER (MWE):

0950 IE RESIDENT INSPECTOR:

H.

LIVERMORE IHSPECTION 5TA T U S:

FUEL L0AD DATE CHAHGES TIME PERIOD A5 REP 0RTED BY UTILITY Anr. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY ILQ_J_M OF INSP.

OF INSL 05-09-77 04-00-81 REEVALUATION OF CONSTRUCTION SCHEDULE.

8115 06-02-81 02-05-82 06-23-78 04-00-82 TIME LOST DUE TO SEVERE WEATHER 8204 02-16-82 03-31-82 CONDITIONS.

8206 04-28-82 04-30-82 01-21-81 01-00-83 REEVALUATION OF CONSTRUCTION SCHEDULE.

8207 05-17-82 05-20-82 04-29-82 01-03-84 REEVALUATION OF CONSTRUCTION SCHEDULE.

8209 06-09-82 06-10-82 Inspection Reports are available at local PDRs.

I 4

I i

1 4

i L0 CAL PUBLIC D0CUMEHT R 0 0 M:

I

~

VESPASIAN WARNER PUBLIC LIBRARY 120 WEST JOHNSON STREET CLINTON, ILLINDIS 61727 4

- _ _ _ -. ~

1

\\

l C0NSTRUCTION STATUS REPORT PAGE NO: 2-029 l

CLINTOM 1 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 CDHSTRUCT I0N S T A T U S:

4 APPLICANI'S CURRENT ESTIMATED FUEL LOADING DATE:

01-03-84 APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS AFPLICANT'S PREVIOUS ESTIMATED FUEL LGADING DATE:

01-03-83 DEFINED IN CP: (EARLIEST) 10-01-80 APPLICA!!T'S ESTITATED TUEL LOADING DATE AT CP ISSUANCE:

1C-00-80 (LATEST) 10-01-83 APPLICA!!T'S CURRLNT ESTIMATED COMMERCIAL OPERATION DATE: 08-31-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 84%

CD;r1ENTS REGARDING CURRENT CONSTRUCTION ST ATUS:

4 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$1ARl_

COMPLETION COMPLETIAN % COMPLETE MOBILIZE AND PREPARE SITE:

10-06-75 03-16-76 100%

PLACE STRUCTURAL CONCRETE:

02-25-76 01-00-83 100%

INSTALL REACTOR PRESSURE VESSEL:

10-06-79 10-15-79 100%

INSTALL LARGE BORE PROCESS PIPE:

05-01-76 07-15-83 95%

3 INSTALL LARGE BORE PIPE NANGERS. RESTRAINTS AND SNUBBERS:

05-01-76 08-15-83 88%

INSTALL SMALL 3CRE PIPE:

  • 6-01-77 09-01-83 93%

1

+

j INSTALL CABLE TRAY:

06-01-78 02-18-83 93%

INSTALL EXPOSED METAL CONDUIT:

06-01-78 02-29-83 83%

]

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

12-12-79 10-03-83 54%

INSTALL ELECTRICAL TERMINATIONS:

04-01-80 11-01-83 48%

I CONDUCT REACTOR COLD NYDR0 STATIC TEST:

02-23-83 04-03-83 0%

1 C0t;EUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

03-06-81 11-28-83 4%

l 1

i e

4

C0NSTRUCTION STATUS REPORT PAGE NO: 2-030' CLINTON 2 HUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000462 CORPORATE CONTACT:

W. C. GERSTHER, EXEC VICE PRESIDENT CP MO. 8 DATE ISSUED: CPPR-138/ 02-24-76 CP EXPIRATION DATE:

CORPORATE ADDRESS:

500 SOUTH 27TH STREET APPLICANT:

ILLINDIS POWER DECATUR. ILLINDIS 62525 PLANT LOCATION:

6 MI E OF CLINTON, ILL IE REGION:

3 CORPORATE PHONE NO:

(217) 937-1111 EXT. 2811 AE:

SARGENT 8 LUNDY NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BALDWIN ASSOCIATES NRC LPM:

H. WILLIAMS I

REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

H. M. WESCOTT DER (MWE):

0950 IE RESIDENT INSPECTOR:

H. LIVERMORE IN5PECTION $TATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY U T I L I T Y:

Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDELE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

03-24-77 10-00-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY OVER FEDERAL NUCLEAR GENERATION AND FUEL POLICIES.

11-20-81 N/S REDUCED LOAD GROWTH RATE.

i L0 CAL PUBLIC D0CUMENT R 0 0 M:

VESPASIAN WARNER PUBLIC LIBRARY 120 WEST JOHNSON STREET 2

CLINTON, ILLINDIS 61727 1

4 C0NSTRUCT ION 5TATU3 0EPQRT PAGE NO: 2-031 CLINTON 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0N5TRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-87 DEFINED IN CP: (EARLIEST) 10-01-83 i

APPLICANT'S E911 MATED FUEL LOADING DATE AT CP ISSUANCE:

10-00-83 (LATEST) 10-01-85 j

APPLICANT'S CURRENT ESTIMATED COMMERCIAL DPERATION DATE: N/S i

j CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

1%

I COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: UNIT 2 CONSTRUCTION DEFERRED INDEFINITELY.

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iTART COMPLETION COMPL ETJOH 1_COUPLETE l

MOBILIZE AND PREPARE SITE:

10-06-75 05-16-76 100%

i PLACE STRUCTURAL CONCRETE:

l INSTALL REACTOR PRESSURE VESSEL:

l INSTALL LARGE BORE PROCESS PIPE:

3 INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:

INSTALL SMALL BORE PIPE:

]

INSTALL CABLE TRAY:

)

INSTALL EXPOSED METAL. CONDUIT:

INSTALL POWER. CONTROL,INSTRUMENTATIDH AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS:

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

CONDUCT NOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

I I

4 I

i 4

a

C0NSTRUCTION 5TATUS REP 0RT PAGE NO: 2-032 COMANCHE PEAK 1 HUCLEAR F0WER PLANTS STATUS AS OF 06-30-82 1

1 PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000445 CORPORATE CONTACT:

R. J. GARY. EXEC. VIC PRESIDENT 4 CP NO. 8 DATE ISSUED: CPPR-126/ 12-19-74 GENERAL MANAGER - TUC j

CP EXPIRATION DATE:

08-01-81 CORPORATE ADDRESS:

2001 BRYAN TOWER APPLICANT:

TEXAS UTILITIES GENERATING DALLAS, TEXAS 75201 PLANT LOCATION:

4 MI N OF GLEN ROLE. TEX IE REGION:

4

~

CORPORATE PHONE HO:

(214) 653-4600 AE:

GIBBS 8 HILL INC.

NSSS:

IJEST INGHOUSE CONSTRUCTOR:

B 00k'N

  • ROOT NRC LPM:

S. BURWELL REACTOR TYPE:

P L'R IE PROJECT INSFECTOR:

DER (r:11E) :

1150 IE RESIDENT INSPECTOR:

R. G. TAYLOR INSPECTION $TATUS:

FUEL L0AD DATE CHANGES TIME PERIOD A5 REPORTED BY UTILITY 1

Anr. 19R2 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE 1[HEDU11 REPORTED BY UTILITY HIM3fil 0F INSP OF INSP, a

05-00-76 05-01-79 NO REASON REPORTED.

l 8205 04-19-82 04-23-82 07-00-77 08-00-80 RESCHEDULED COMMERCIAL OPERATION DATE.

8207 04-01-82 04-30-82 11-00-79 03-15-81 NO REASON REPORTED.

1 8209 04-27-82 05-27-82 08-00-80 12-00-81 NO REASON REPORTED.

8210 04-13-82 05-10-82 11-01-81 06-00-83 NO REASON REPORTED.

Inspection reports are available at local PDRs.

i l

J l

i i

L0 CAL PUBL IC D0CUMEHT R00M SOMERVELL COUNTY PUBLIC LIBRARY 1

04 THE SQUARE P. O. BOX 417 GLE: ROSE. TEXAS 76043 i

l

. =. - -.

j CDNSTRUCT ION STATUS OEP0RT PAGE NO: 2-033 CDMANCHE PEAK 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION 5 T A T U 5:

APPLICA'4T'S CURRENT ESTIMATED PUEL LOADING DATE:

06-00-83 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIfMTED IUEL LOADING DATE:

12-00-31 DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LDADIr:G DATE AT CP ISSUANCE:

06-00-79 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 89%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE SECOND QUARTER OF 1982.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

__ilART 11ARI_

COMPLETION COMPLETION % COMPLETE MOBILIZE At:D PREPARE SITE:

08-00-74 10-00-74 100%

i PLACE STRUCTURAL CONCRETE:

05-00-75 07-00-75 01-00-82 94%

INSTALL REACTOR PRESSURE VESSEL:

07-00-77 05-00-78 05-00-78 05-00-78 100%

I INSTALL LARGE BORE PROCESS PIPE:

05-00-76 07-00-76 12-00-81 99%

INSTALL LAP.GE 20RE PIPE HANGERS, RESTRAINTS AND SNUDBERS:

03-00-76 08-00-82 79%

INSTALL SMALL B3Rt PIPE:

11-00-76 12-00-81 94%

INSTALL CABLE TRAY:

08-00-77 12-00-81 99%

INSTALL EXPOSED METAL CONDUIT:

08-00-77 08-00-82 90%

1 INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-00-79 12-00-82 78%

INSTALL ELECTRICAL TERMINATIONS:

04-00-79 12-00-82 76%

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

06-00-82 06-00-82 0%

C0t: DUCT NOT FUNCTIONAL TEST:

11-00-82 12-00-82 0%

CD:: DUCT PREOP AND ACCEPTANCE TESTS NECESSARY TOR FUEL LOAD:

06-00-83 0%

1 i

i i

i

.. ~

~.

~

=

CDNSTRUCTION STATUS REP 0RT PAGE NO: 2-034 CEMANCHE PEAK 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTERI5iICS:

KEY P E R S 0 N N E Le DOCKET NO:

05000446 CORPORATE CONTACT:

R. J. GARY, EXEC. VICE PRESIDENT 8 CP NO. & DATE ISSUF.D: CPPR-127/ 12-13-74 CENERAL MANAGER - TUGO CP EXPIRATION DATE4 C3-01-83 CORPORATE ADDRESS:

2005 BRYAN TOWER APPLICANT:

TEXAS UTILITIES GENERATING JAILAS. TEXAS 75201 PLANT LOCATION:

4 MI N OF GLEN ROSE. TEX IE REGION:

4 CORPORATE PHONE NO:

(2 14) 653-4600 AE GIBBS & HILL INC.

NS$$2 WESTINGHOUSE i

CONSTRUCTOR:

BROWN 8 ROOT NRC LPM:

S. BURWELL l

REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

l DEf(MWE):

1150 IE RESIDENT INSPECTOR:

R. G. TAYLOR

- a-..; ;

IM>ptCTION S T A T U S:

FUEL L0AD DATE CHANGES l

TIME PERIOD AS REP 0RTED BY U T I L I T Y:

~.

Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE ifEIDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

05-00-76 05-01-81 NO REASON REPORTED.

8204 04-27-82 05-27-82 07-00-77 08-00-82 RESCHEDULED COM1ERCIAL OPERATION DATE.

8205 04-13-82 05-10-82 11-01-81 N/S SCHEDULE UNDER REVIEW.

Inspection reports are available at Iocal PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 M:

SOMERVELL COUNTY PUBLIC LIBRARY ON THE SQUARE P. O. BOX 417 GLEN ROSE, TEXAS 76043 o

  • Y

I j

{

C0N5TRUCTION

$TATUS REPORT PAGE NO: 2-035 COMANCHE PEAK 2 NUCLEAR POWER PLANTS STATUS AS er.

06-30-82 C0NSTRUCTION STATUSt i

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS d

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

08-00-82 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LDADING DATE AT CP ISSUANCE:

06-00-81 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S i

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 57%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE SECOND QUARTER OF 1982.

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

$ TART iLARL C0f*PLETTM SD M EION U QUPLETE MOBILIZE AND PREPARE SITE:

10-17-74 04-18-75 100%

PLACE STRUCTURAL CONCRETE:

04-18-75 INSTALL REACTOR PRESSURE VESSEL:

06-00-79 08-15-79 100%

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE NANGERS. RESTRAINTS AND SNUBBERS:

)

1 INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

INSTALL EXPOSED METAL CONDUIT:

INSTALL 00WER CONTROL, INSTRUMENTATION AND SECURITY CABLE:

i INSTALL ELECTRICAL TERMINATIONS:

I CONDUCT REACIOR COLD HYDROSTATIC TEST:

CONDUCT HOT FUNCTIONAL TEST:

j

.i CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD?

i i

d

)

~_

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-036 DIABLO CANYOH 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

05000275 CORPORATE CONTACT:

PHILIP A. CRANE, JR., ASSISTANT CP NO. 8 DATE ISSUED:

CPPR-39 / 04-23-68 GENERAL COUNSEL CP EXPIRATION DATE:

04-30-79 CORPORATE ADDRESS:

77 BEALE STREET APPLIPANY:

PACIFIC GAS 8 ELECTRIC SAN FRANCISCO, CALIFORNIA 94106 i

PLANT LOCATION:

12 MI WSW OF SAN LUIS OBISPD IE REGION:

5 CORP?' ATE PHONE NO:

(4 15) 781-4211 i

AE:

PACIFIC GAS 8 ELECTRIC NSSS:

WESTINGHOUSE l

CONSTRUCTOR:

PACIFIC CAS 8 ELECTRIC NRC LPM:

B. BUCKLEY i

REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (T:WE) :

1084 IE RESIDENT INSPECTOR:

M. J. BAGAGLIO 1

j INSPECTION STATUSt FUEL L0AD DATE CHANGES 1

q TIME PERIOD AS REPORTED BY U T I L I T Y:

Anr. 1932 - Jun. 19RZ REPORT HEW REASON FOR CHANGE j

REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY j

EUDAE3 0F INSP.

OF INSP.

04-00-74 01-00-75 SLOW DOWN IN WORK RESULTING FROM WILDCAT 82-12 01-12-82 03-04-82 STRIKE BY ELECTRICIANS WHEN SECOND SHIFT I

82-13 04-19-82 04-23-82 WAS ADDED INSTEAD OF OVERTIME. INEXPERI-

)

82-14 04-04-82 05-01-82 ENCED NEW HIRES IN ADDITION TO REDUCED 82-15 05-24-82 05-28-82 ELECTRICIAN WORK FORCE CAUSED THE DELAY.

i 82-16 05-10-82 05-14-82 09-00-74 04-00-75 A STRIKE BY PIPEFITTERS IS STILL IN EFFECT i

82-17 05-15-82 05-15-82 AT THE SITE.

THE LICENSEE ESTIMATES AT 82-18 04-26-82 04-30-82 LEAST A 48 DAY FUEL LOAD SLIP AT THIS 82-19 05-02-82 06-04-82 TIME BUT WILL EVALUATE THE EFFECT ON THE 82-20 05-06-82 05-28-82 DVERALL SCHEDULE AT COMPLETION OF STRIKE.

82-21 06-06-82 07-03-82 10-00-74 10-00-75 LICENSEE'S EVALUATION OF STRIKE EFFECTS.

82-22 05-26-82 07-05-82 08-00-75 02-00-76 RETUBING OF MAIN CONDENSER WITH TITANIUM TUBES.

Inspection Reports are available at local PDRs.

10-00-76 03-00-77 DECISION TO PARTIALLY REBLADE PORTIONS OF THE LOW PRESSURE TURBINES.

01-07-77 05-00-77 REBLADING OF THE LOW PRESSURE TURBINES.

04-04-78 08-00-78 REVIEW OF PREOPERATIDHAL TEST PROGRAM i

i AND COMPLETION AND APPROVAL OF SEISMIC MODIFICATION PROGRAM.

02-00-79 ESTIMATED.DATE. NRC CONTROLLING.

i 08-00-80 01-00-81 ESTIMATED DATE.

NRC CONTROLLING.

09-00-81 03-00-81 NO REASON KNOWN.

i 12-00-81 03-00-82 ESTI!1AT ED DATE.

j 03-00-82 N/S L0 CAL PUBLIC D0CUMENT R 0 0 M:

SAN LUIS OBISPO COUNTY FREC LIBRARY 288 MORRO STREET SAN LUIS OBISPO, CALIFORNIA 93406 i

i h

1 4

ww-w

. m-

. ~. - ~.

. - - -. - ~. ~ -. -.... -._.

1 1

C0NSTRUCT20N 3TATUS REPORT PAGE P0: 2-037 j

DIALLO CANYON t HUCLEAR POWER PLANTS STATUS AS OF 06-30 1 C0N5TRUCT I O tt

7 ATUSt l

APPt: CANT'S CURREMT ESTIt? ATE 3 79EL LDADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APTLICANT'S PREVIOUS LSTIMATED Fb2L LOADING DATE:

03-00-82 DEFINED IN CP (EARLIEST)

'PPLICANT'S ESTIMATED FUEL LCADING DATE AT CP ISSUANCE:

04-00-72 (LATEST) l l

APPLICANT'S CURRENT ESTIMATED C03:1ERCI AL CPERAlICH DATE: N/S i

j CURRENT ESTIMATED PERCENT CV'%TRUCTION COMPLETE: 99%

9 i

COMMENTS REGARDING CURRCNT CONSTRUCTION STATUS: FULL LOADING LICENSE SUSPENDED BY THE NRC.

NO CPDATE MECEIVED 4

i

{

FOR THE SECOND QUARTER OF 1932.

a 2

ESTIMATED-ACTUAL ESTIMATED ACTUAL

' ESTIMATED l

START 11ARI_

CO!1PL ET T ON LDMPLETION % COMPLETE i

M3 BILI 2E AND PREPARE SITE:

06-14-68 12-00-69 100%

1 PLACE STRUCTURAL CONCRETE:

12-00-69 100%

i l

INSTALL REACTOR PRESSURE VESSEL' 02-00-73 03-00-73 100%

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE NANGERS. RESTRAINTS AND SNUBBERS:

IllSTALL SMALL B02E PIPE:

i I

INSTALL CABLE TRAY:

1 i

INSTALL EXPOSED METAL CONDUIT:

)I INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:

INSTALL ELECTRICAL TERMIMATIONS:

j CONDUCT REACTOR COLD NYDR0 STATIC TEST:

06-00-75 08-00-75 100%

CONDUCT l!OT TUNCTIONAL TEST:

11-00-75 02-00-76 100%

' CONDUCT PRE 0P AND ACCCPTANCE TFSTS NECESSARY FOR FUEL LOAD:

i n

4 i

1 l

I

]

C0NSTRUCTION STATUS REPORT PAGE NO: 2-038 DIABLO CANYON 2 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTERISTICSt KEY PERS0NNEL:

DOCKET NO:

05000323 CORPORATE CONTACT:

PHILIP A. CRANE, JR., ASSISTANT CP NO. 8 DATE ISSUED: CPPR-69 / 12-09-70 GENERAL COUNSEL CP EXPIRATION DATE:

10-31-79 CORPORATE ADDRESS:

77 BEALE STREET APPLICANT:

PACIFIC GAS 3 ELECTRIC SAN FRANCISCO, CALIFORNIA 94106 PLANT LOCATION:

12 MI WSW OF SAN LUIS OBISPD IE REGION:

5 CORPORATE PHONE HO:

(415) 781-4211 AE:

PACIFIC GAS 8 ELECTRIC NSSS:

WESTINGHOUSE CONSTRUCTOR:

PACIFIC GAS 8 ELECTRIC NRC LPM:

B. BUCKLEY REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1106 IE RESIDENT INSPECTOR:

M. J. BAGAGLIO INSPECTION S T A T U 5:

FUEL L0AD DATE CHANGES TIME PERIOD A5 REP 0RTED BY UTILITY Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-00-74 02-00-76 A STRIKE BY THE PIPEFITTERS IS STIll IN 82-07 01-12-82 03-04-82 EFFECT AT THE SITE.

THE LICENSEE 2

82-08 04-19-82 04-23-82 ESTIMATES AT LEAST A 48 DAY FUEL LOAD SLIP 82-09 05-10-82 05-14-82 AT THIS TIME BUT IJILL EVALUATE THE EFFECT 82-10 05-06-82 05-28-82 ON THE OVERALL SCHEDULE AT THE COMPLETION 82-11 05-26-82 07-05-82 0F THE STRIKE.

10-00-74 07-00-76 STRIKE.

Inspection Reports are avalIable at local PDRs.

08-11-75 02-00-77 1 RETUBING OF MAIN CONDENSER WITH TITANIUM TUBES (2-3 MONTHS).

2.

INSTALLATION OF ADDITIONAL MAIN STREAM RUPTURE RESTRAINTS (4 MONTHS),

10-15-76 08-00-77 ELECTRICAL INSTALLATION PROBLEMS.

01-07-71 12-00-77 A GENERAL REEVALUATION OF THE PROJECT SCHEnULE.

01-04-78 01-00-78 NO REASON GIVEN.

02-07-78 03-00-79 GENERAL REEVALUATION OF PROJECT SCHEDULE.

04-14-78 02-00-80 GENERAL REEVALUATION OF PROJECT SCHEDULE.

02-00-80 03-00-80 NO REASON REPORTED.

05-00-80 03-00-81 NO REASON PROVIDED.

09-00-81 07-00-82 NO REASON FROVIDED.

06-00-82 N/S L0 CAL PUBLIC D0CUMENT R 0 0 M:

SAN LUIS OBISPO COUNTY FREE LIBRARY 888 MORRO STREET SAN LUIS OBISP0, CALIFORNIA 93406

. - - - ~. -.. - -

. - _ -., - ~. - _.

i 4

C0NSTRUCTION 5TATUS REP 0RT PAGE NO 2-039 DIABLO CANYON 2 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 CONSTRUCTION STATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

03-00-81 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LUADING DATE AT CP ISSUANCE:

11-00-74 (LATEST)

APPLICANT'SCURRENTESTIMATEDCOMMfpCIALOPERATIONDATE:

N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 98%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE RECEIVED FOR THE SECOND QUARTER OF 1982.

1 I

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED STAR L iT_ARL

$_Of!Flfl10N

$0ELETION LCQUPLQg 4

i MOBILIZE AND PREPARE SITE:

06-14-68 05-00-71

.100%

PLACE STRUCTURAL CONCRETE:

05-00-71 100%

l INSTALL REACTOR PRES'SURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE i

INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS:

1 i

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

INSTALL EXPOSED METAL' CONDUIT:

1 INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

J INSTALL ELECTRICAL TERMINATIONS:

l CONDUCT REACTOR COLD NYDROSTATIC TEST:

CONDUCT HOT FUNCTIONAL TEST:

f CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

3 4

t i

i l

C0NSTRUCTION 5TATUS REP 0RT PAGE NO: 2-040 ENRICO FERMI 2 NUCLEAR POWER PLANT 5 STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELe DOCKET NO:

05000341 CORPORATE CONTACT:

H. TAUBER, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-87 / 09-27-72 ENGINEERING 8 CONSTRUCTIDH CP EXPIRATION DATE:

01-01-8?

CORPORATE ADDRESS:

2000 SECOND AVENUE APPLICANT:

DETROIT EDISON DETROIT, MICHIGAN 48226 PLANT LOCATION:

LAGUNA BEACH, MICH IE REGION:

3 CORPORATE PHONE NO:

(313) 273-6696 AE:

SARGENT 8 LUNDY NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

DANIEL INTERNATIONAL NRC LPM:

L. KINTNER REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

P. PELKE DER (MWE):

1093 IE RESIDENT INSPECTOR:

B. LITTLE INSPECTION 5 T A T U 5:

FUEL L0AD DA TE CHANGES TIME PERIOD AS REPQRTED BY UTILITY Apr. 1982 - Jun. 1912 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHf,DQLE REPORTED BY UTILITY

!UMF3 ff l!!SL 0F IN5Pa 12-00-70 08-00-74 1 ENGINEERING AND CONSTRUCTION EFFORTS 8201 01-01-82 02-28-82 MORE EXTENSIVE THAN ANTICIPATED.

8202 03-16-82 03-16-82

2. CP EXEMPTION TO DO SUBGRADE WORK 8204 04-12-G2 04-20-82 DELAYED FR0f1 06-)0 TO 10-70.

8205 03-30-82 04-02-82 11-00-71 04-00-75 1 REDESIGN OF REACTOR BLDG. DUE TO 8706 03-01-82 04-30-22 ADDING DEEP WELLS FOR ECCS PUMPS TO 8209 05-26-32 05-27-82 MEET CHANGE IN AEC REQUIREMENTS.

2. REDESIGN OF RADWASTE BUILDING.

Inspection Reports are availabIo at local PDRs.

06-00-72 10-00-75 1 REESTIMATE BASED ON ADDITION CODES, STANDARDS AND REGULATORY GUIDES.

2. ADDITIONAL ENVIRONt1 ENTAL HEARING DELAY.

08-00-72 02-00-76 1.

DELAY IN OSTA? LING CP DUE TO HEARING BOARD AND APFCALS BOARD.

2. ADDITIONAL DESIGN TO DETERMINE DYNAMIC EFFECTS OF DOUBLE ENDED PIPE BREAK.

07-00-73 08-00-76 1.

REMOBILIZATION OF STRUCTURE CONTRACTOR

2. REVISION OF SCHEDULE BASED ON CHANGES IN SYSTEM TO CD:! PLY WITH REQUIREMENTS OF NEW REGULATORY GUIDES.

09-27-74 08-00-78 DELAY EUE TO FINANCING PRCBLEMS.

11-19-75 01-01-80 FINANCIAL RESTRAINTS.

10-13-78 06-01-80 DELAY DUE TO CRAFT LABOR SHORTAGES.

07-11-79 05-00-81 NO PEASON STATED.

08-00-80 11-30-82 NO RtASON PROVIDED.

08-00-82 06-00-83 NO REASON PROVIDED.

L0 CAL PUBL IC D0CUHENT R 0 0 N:

MONROE COU:1TY LIBRARY SYSTEM 3703 SOUTH CUSTER ROAD M3 ;n0E. f11CNIGAN 43161

f i

l C0NSTRUCT IOH

$TATUS REPORT PAGE NO: 2-041 1

ENRICO FERMI 2 HUCLEAR POWER PLAHTS STATUS AS OF:

06-30-82 e

t 4

]

C 0 !! S T R U C T I O !!

S T A T U S:

ATPLICANT'S CUPRENT ESTIMATED Furl LOADING DATE:

06-00-83 APPLICANTS CONSTRUCTION COMPLETION'ESTIMAT AS APPLICAt4T'S PREVIOUS ES11MrTED FUEL L O ADI NC. D%1E:

11-30-82 DEFINED IN CP: (EARLIEST) 11-00-82 APPL IC A::T'S ESTIt'dT ED FUEL LO ADING DAT E AT CP ISSU4t:CE:

03-00-73 (LATEST) 11-00-82 APPLICAMT'S CURRENT ES11:tATED COMMERCIAL OPERATION DATE: 11-00-83 CURRE:4T ESTIMATFD PERCENT CO?lSTRUCTIDH CC?iPLETE: 38%

i

]

CMt: TENTS REGARDING CURRENT CONSTRUCTION STATUS: ND UPDATE RECEIVED FOR THE SECOND QUARTER OF 1932.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED 5iART iT ARL

$0MPLETTON COMPL ElIQJi U QMPLETE i

MOBILIZE AND PREPARE SITE:

05-00-69 10-00-70 100%

I i

PLACE STRUCTURt.L CONCRETE:

12-00-70 06-00-79 100%

INSTALL REACTOR PRESSURE VESSEL:

10-00-74 10-00-74 100%

j INST ALL Lt.RCE EORE PROCESS PIPE:

06-00-77 06-00-82 99%

INSTALL L ARGE CORE PIPE IIANGERS. RESTRAINTS AND SNUBBERS:

09-00-77 06-00-82 87%

a IG5 TALL SMALL LORE PIPE:

07-00-77 06-00-82 86%

INSTALL CABLE TRAY:

02-00-74 06-00-82 99%

I INSTALL EXPOSED METAL CONDUIT:

02-GO-74 06-00-82 89%

INSTALL POMER, CONTROL. INSTRUMENTATION AND SECURITY CABLE:

04-00-74 05-00-82 87%

INST ALL EL ECTRICAL TERMINATIONS:

06-00-74 06-00-82 86%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

03-00-82 03-00-82 0%

CONDL'CT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

10-00-81 06-00-83 0%

1

)

}

l 4

4 4

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-042 GRAND GULF 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICS:

KEY PERSONNEL:

DOCKET NO:

05000417 CORPORATE CONTACT:

N. L. STAMPLEY, SEN. V. PRESIDENT CP NO. 8 DATE ISSUED: CPPR-119/ 09-04-74 HUCLEAR CP EXPIRATION DATE:

10-01-84 CORPORATE ADDRESS:

P. O. BOX 1640 APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY JACKSON, MISSISSIPPI 39205 PLANT LOCATION:

25 MI S OF VICKSBURG, MISS IE REGION:

2 CORPORATE PHONE NO:

(601) 969-2335 AE2 BECHTEL NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BECHTEL NRC LPM:

D. HOUSTON REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

J. K. RAUSCH DER (MWE):

1250 IE RESIDENT INSPECTOR:

A. WAGNER l

INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Anr. 1982 - Jun. 1982 i

REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE iSEfPlkf BEPORTED BY UTTIITY HUMBER OF TNSP.

OF 1NSP.

06-25-76 03-00-83 NO RFASON REPORTED FOR THIS SLIPPAGE Bf 8209 04-13-82 04-15-82 07-00-C3 CONSTRUCTION DELAYS, THE UTILITY.

01-07-77 Inspection reports are available at local PCRs.

01-11-80 09-00-84 NO REASON REPORTED.

09-15-80 08-00-85 NO REASON REPORTED.

12-31-81 N/S SCHEDULE UNDER REVIEW.

I i

L0Cai PUBLIC D0CUMENT R 0 0 M:

MS. GAYLE KEEF HINDS JUNIOR COLLEGE MCLENDON LIBRARY RAYMOND. MISSISSIPPI 39154 1

CDHSTRUCTION STATUS QEPORT PAGE NO: 2-043 j

GRAND GULF 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82

-C0N5TRUCTION

$TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

08-00-85 DEFINED IN CP: (EARLIEST) 04-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

03-00-81 (LATEST) 10-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTINATED PERCENT CONSTRUCTION COMPLETE: 22%

COMMENTS RECARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION HALTED ON UNIT 2 AS OF DECEMBER 31, 1979.

ESTIMATED ACTUAL.

ESTIMATED ACTUAL ESTIMATEu START iT AR,L CnttPL El.LnN C0r;PLEJJ 03

  • COUPLETE MOBILIZE AND PREPARE SITE:

05-03-74 06-00-74 100%

PLACE STRUCTURAL CONCRETE:

01-00-78 60%

I INSTALL REACTOR PRE %SURE VESSEL:

08-00-79 10%

INSTALL LARGE BORE EROCESS PIPE:

04-00-78 36%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

10-00-79 15%

INSTALL SMALL BORE PIPE:

0%

4 INSTALL CABLE TRAY:

12-00-78 15%

INSTALL EXPOSED METAL CONDUIT 0%

INST ALL PC'JER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

0%

INSTALL ELECTRICAL TERMINATIONS:

0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

0%

CONDUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A I

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

0%

4 1

A i

CDHSTRUCTION 5TATUS REPORT Pt.GE NO: 2-044 HARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CNARACTERISTICSt KEY PERS0NNEL I

I f

39rgEy NO 04s-400 CORPORATE CONTACT:

M. A. MCDUFFIE, SEN. V. PRESIDENT l

I CT,'T A, 3 D'vE ISSUED: CPPR-158/ 01-27-78 ENGINEERING 8 CONSTRUCTION P 2%5IRAI.Tk'4 DATE:

06-01-84 CORPORATE ADDRESS:

411 FAYETTEVILLE STREET A P P L I C*.N ' :'~-

CAROLINA POWER 8 LIGHT RALEIGH, NORTH CAROLINA 27602 PLAMT #.0C/T}0N:

20 MI SW OF R.a.LEIGH, NC I E RCC.ii.h

2 CORPORATE PHONE NO:

(919) 836-6663 I

AE:

"i EBASCO NSSS:

WESTINCHOUSE CONSTRUCTOR:

DANIEL INTERNATI0FAL NRC LPM:

E. A.

LICITRA I

REACTUR T Y.' E :

PU1 IE PROJECT INSPECTOR:

DER (M!!E S -

0915 IE RESIDENT INSPECTOR:

G. F. MAXWELL

?

IN$PECT IOH STA T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTIL I T Yr Apr. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE EFZQRTED BY UTILITY tiLII1MH OF I N SE,,

0F INSP.

05-07-75 06-01-83 REVISED CURRENT ENERGY AND LOAD FORECAST.

8210 04-13-82 04-16-82 09-08-80 06-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN 8211 04-13-82 04-15-82 PROJECTED.

8212 04-06-82 04-09-82 02-16-81 12-00-84 LOWER RATE GROWTH IN CUSTOMER 8215 05-10-82 05-13-82 DEMAND THAN PROJECTED.

8216 05-10-82 05-13-82 8217 04-20-82 05-2C-82 8213 05-25-82 05-28-82 8221 05-20-82 C6-20-82 Inspection reports are available at local PDRs.

l L0 CAL *dBLIC D0CUMENT R 0 0 Mi var.E C0t!NTY PUDLIC LIBRARY 104 FAYETTEVILLE STPEET P AL EIG.I, tt021H CA!'0 LINA 27601 1

C0NSTRUCTIOH STATUS REPQRT PAGE NO: 2-045 HARRIS f HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION STA T U S:

APPLICANT'S CURRENT ESTIMATED FUFL LOADING DATE:

12-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-84 DEFINED IN CP. (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

09-00-80 (LATEST)

APPLIc'r

'S CURRENT ESTIMATED COMr1ERCIAL OPERATION DATE: 09-01-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 66%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WRPV SET: EXCLUDE INTERNALS AND HEAD PACKAGE.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

_Q R T SLA R_J _

.Q Qt1P_1 F,llD3 COMPLETIQfi % COMPLETE MODILIZE AND PREPARE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 100%

PLACE STRUCTURAL CONCRETE:

01-28-78 01-28-78 02-01-84 83%

INSTALL REACTCR PRESSURE VESSEL:n 12-01-79 04-15-80 04-01-80 08-29-80 100%

%. h A#

04-01-79 04-01-79 08-01-84 58%

INSTALL LAR0E BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

04-01-79 04-01-79 11-01-83 38%

04-01-79 04-01-79 08-01-84 41%

INSTALL SMALL BORE PIPE:

+<74,

INSTALL CABLE TRAY:

'(

04-01-79 04-01-79 04-01-84 85%

IH".T ALL EXPOSED MET AL CONDUIT:

04-01-79 04-01-79 04-01-84 84%

INSTALL PCWER, CCHTROL, INSTRUMENTATION AND SECURITY CADLE:

03-01-81 02-26-81 06-01-84 19%

INSTALL ELECTRICAL TERMINATIONS:

01-01-82 06-15-81 12-01-84 20%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

05-01-84 06-01-84 04 CONDUCT IiOT FUNCTIONAL TEST:

08-01-84 10-01-84 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEI. LOAD:

06-01-83 12-01-84 0%

C0NSTRUCTION STATUS REPORT PAGE NO: 2-006 HARRIS 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S G,N N E L DOCKET NO:

05000401 CORPORATE C6dTAr7 M.

A. MCDUFFIE, SEN. V.

."R :iID EN T '

CP NO. 8 DATE ISSUED: CPPR-159/ 01-27-78 ENGINEERING 8 CCNSTRUCTION CP EXPIRATION DATE:

06-01-86 CORPORATE ADDRELS:

411 FAYETTEVILLE STeEE*.

,;;jf APPLICANT:

CAROLINA POWER 8 LIGHT R A L EI Gil, K)RTPc Cjtus D:3 (;un2 PLANT LOCATION:

20 MI SW OF RALEIGH, NC IE REGION:

2 CORPORATE PHONE NO:

(919) 836-6663 AE EBASCO HSSS:

WESTINGHOUSE CONSTRUCTOR:

DANIEL INTERNATIONAL NRC LPM:

E.

A.

LTCITRA REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

0915 IE RESIDENT INSPECTOR:

G.

F. MAXWELL

< Q s

~

s,.

INSPECTION $TATUS:

FUEL L0AD DATE CHANGES w

TIME PERIOD

?

si Apr. 1982 - Jun. 1982 AS REP 0RTED BY U T I L I T Y:

1 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE RA_LE 10.H_F.D_ U LF, RJPORTFD BY UTILITY NUMBER OF INSP.

OF INSP.

05-07-75 06-01-85 REVISED CURRENT ENERGY AND LOAD FORECAST.

8210 J4-13-82 04-16-82 01-00-80 06-01-86 REVISED CURRENT ENERGY AND LOAD 8211 04-13-82 04-16-82 FORECAST.

8212 04-06-82 04-09-82 09-08-80 06-01-87 SLONER RATE GROWTH IN CUSTOMER DEMAND 8215 05-10-82 05-13-82 THAN PROJECTED.

8216 05-10-82 05-13-82 12-16-81 06-01-88 EXPANDED CONSERVATION AND LOAD MANAGEMENT 8217 C4-20-82 05-20-82 PROGRAF 1.

8218 05-25-82 05-28-82 8219 05-20-82 06-20-82 Inspection reports are available at local PDRs.

s.

J L0 CAL PUBLIC D0CUMENT R 0 0 M:

WAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601

. ~.

4 C0NSTRUCTION STATUS REPORT PAGE NO: 2-047 HARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF 06-33-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENI E5TIMATED FUEL LDADING DATE:

06-01-88 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIf1ATED FUEL LOADING DATE:

06-01-87 DEFIHED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

06-01-8S (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-01-89 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

4%

]

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

4 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START jlT ART

$0tjP.L E_T J 0M LO"P_tJTTON LQOtPL ET E MOBILIZE AND PREPARE SITE:

01-14-74 01-14-74 11-28-78 01-28-18 100%

PLACE STRUCTURAL CONCRETE:

02-01-79 02-01-79 04-01-86 30%

i INSTALL REACTOR PRESSURE VESSEL:

09-01-8S 01-01-86 0%

INSTALL LARGE BORE PROCESS PIPE:

06-01-79 0s-01-79 02-01-87 10%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

07-01-82 02-01-88 0%

INSTALL SMALL BORE PIPE:

05-01-79 06-01-79 02-01-88 3%

INSTALL CABLE TRAY:

04-01-8S 10-01-87 0%

INSTALL EXPOSED METAL CONDUIT:

04-01-85 10-01-87 0%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

06-01-8S 03-01-88 0%

l INSTALL ELECTRICAL TERMINATIONS 08-01-8S 04-01-88 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

11-01-87 12-01-87 0%

CONDUCT HOT FUNCTIONAL TEST:

02-01-88 04-01-88 0%

CONDUCT PREOP AND ACCEPTAN*E TESTS NECESSARY FOR FUEL LOAD:

12-01-86 06-01-88' 0%

i j

l

~_ -

t C0NSTRUCTION STATUS REP 0RT PAGE HO: 2-048 HARTSVILLE A-1 HUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000518 CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP NO. 8 DATE ISSUED: CPPR-150/ 05-09-77 0F POWER CP EXPIRATION DATE:

CORPORATE ADDRESS:

500A CHESTHUT STREET TOWER II APPLICANT:

TENNESSEE VALLFY AUTHORITY CHATTANDOGA, TENNESSEE 37401 PLANT LOCATION:

40 t1I E OF HASHVILLE, TH s

IE REGION:

2 CORPORATE PHONE NO:

(615) 751-2823 AE:

TENNESSEE VALLEY AUTHORITY NSSS:

GENERAL ELECTPIC CONSTRUCTOR:

TENNESSEE VALLEY AUTil0RITY NRC LPM:

REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MME):

1205 IE RESIDENT INSPECTOR:

W. SWAN IN5PECTIOH STATUSt FUEL L0AD DATE CHAHGES TIME PERIOD AS REPORTED BY U T I L I T Y:

Apr. 191. - Jun. 198R 2

REPORT HEW REASON FOR CHANCE REPORT BEG DATE END DATE PATE 1pHEDULE REPORTED BY UTILITY

]

ILt!nD ER OF IN E OF INSP 07-23-76 10-26-81 SLIPPAGE DUE TO REEVALUATIDH OF 8205 04-20-82 06-23-82 CONSTRUCTION SCHEDULE STATUS BY TVA.

8206 04-01-82 04-30-82 05-06-77 03-01-82 DELAY IN ISSUANCC OF LWA PART II.

8207 05-03-82 05-28-82 09-12-79 02-00-85 NO REAS3M NOTED.

09-10-80 01-00-87 HD REASON REPORTED.

j Inspection reports are available at Iocal PDRs.

08-14-81 01-00-90 NO REASOH REPORTED.

3 i

l t

4 i

i 1

l i

i L0 CAL PUBLIC D0CUMENT R 0 0 M:

STATE LIBRARY AND ARCHIVES 403 SEVENill AVENUE, NORTH HASHVILLE, TENNESSEE 37219 6

i

C0N5TRUCTION STATUS REPOOT PAGE NO: 2-049 NARTSVILLE A-1 NUCLEAR POWER PLANTS STATJ' AS OF:

06-30-82 C0NSTRUCTION S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

01-01-90 APPLICANTS CONSTRUCTION COMPLETION 4.TIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

01-00-87 DEFINED IN CP: (EARLIEST) 06-00-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

06-00-81 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMt1ERCIAL OPERATION DATE: 10-00-90 CURRENT ESTIMATED PERCENT CONSTRUCTION C0t1PLETE: 44%

COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS: PR3 JECT DEFERRED WITil DPTION TO Rr.5T ART AS NECESSARY.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START STARl_

CQ_MP L ET ION

.qQt1PL ET T ON

%_ CDM_P1JJJ MOBILIZE AND PREPARE SITE:

04-22-76 08-3'.-76 100%

PLACE STRUCTURAL CONCRETE:

08-15-77 12-18-85 81%

INSTALL REACTOR PRESSURE VESSEL:

12-17-79 02-28-80 100%

INST ALL LARGE BORE PROCESS PIPE:

08-27-79 10-08-87 35%

INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBBERS:

08-01-79 11-08-87 17%

INSTALL SMALL BORE PIPE:

11-02-79 11-08-87 13%

INSTALL CABLE TRAY:

06-08-79 09-15-89 36%

INSTALL EXPOSED METAL CONDUIT:

03-24-80 01-23-87 4%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

03-21-86 09-15-89 0%

INSTALL ELECTRICAL TERMINATIONS:

05-10-86 09-28-89 0%

CONDUCT REACTOR COLD NYDRaSTATIC TEST:

01-06-89 01-20-89 0%

CONDUCT tl0T FUNCTIONAL TEST:

N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-18-87 01-00-90 0%

= -

C0N5TRUCTION STATUS REPORT PAGE NO: 2-050 HARTSVILLE A-2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNEL DOCKET NO:

05000519 CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP NO. 8 DATE ISSUED: CPPR-151/ 05-0 9-77 0F POWER CP EXPIRATION DATE:

CORPORATE ADDRESS:

500A CHESTNUT STREET TOWER II APPLICANT:

TENNESSEE VALLEY AUTHORITY CHATTANOOGA, TENNESSEE 37401 PLANT LOCATION:

40 MI E OF NASHVILLE, TN IE REGION:

2 CORPORATE PHONE NO:

(615) 751-2823 AE TENNESSEE VALLEY AUTHORITY HSSS:

GENERAL ELECTRIC CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

REACTOR TYPE:

BWR IE PROJECT INSFECTOR:

DER (MWE):

1205 IE RESIDENT INSPECTOR:

W. SWAN INSPECT ION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED 3Y UTILITYi Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE ECEFDU(F REPDPTFD BY UTILIlY EUMBER OF INSP.

OF INSP.

07-23-76 10-26-82 SLIPPAGE DUE TO REEVALUATIDH OF t

8205 04-20-82 04-23-82 CONSTRUCTION SCHEDULE STATUS BY TVA.

8206 04-01-82 04-30-82 05-06-77 03-01-83 DELAY IN ISSUAL!E OF LWA PART II.

8207 05-03-82 05-28-82 09-12-79 02-00-86 NO REASON NOTED.

09-10-80 10-00-87 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

08-14-81 01-00-91 NO REASON PROVIDED.

1 i

l i

L0 CAL PUBLIC D0CUMENT R00Mt STATE LIBRARY AND ARCHIVES 403 SEVENTH AVENUE, NORTH NASHVILLE. TENNESSEE 37219 i

CDNSTRUCTION 5TATUS REP 0RT FACE NO: 2-051 HARTSVILLE A-2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

01-01-91 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-87 DEFINED IN CP: (EARLIEST) 06-00-82 APPLICANT'S ESTIf1ATED FUEL LOADING DATE AT CP ISSUANCE:

06-00-82 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 10-00-91 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 34%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITH OPTION TO RESTART AS HECESSARY.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START STARI_

[pMPLE_TTON S0tjPLElIOH % COMP (gif MOBILIZE AND PREPARE SITE:

04-22-76 03-31-77 100%

PLACE STRUCTURAL CONCRETE:

05-15-78 02-03-87 06-14-79 66%

l INSTALL REACTOR PRESSURE VESSEL:

12-18-80 03-26-81 100%

INSTALL LARGE BORE PROCESS PIPE:

12-28-79 01-02-89 24%

i INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

05-19-80 01-30-89 4%

INSTALL SMALL BORE PIPE:

07-18-80 01-30-89 4%

i INSTALL CABLE TRAY:

01-09-81 06-14-90 6%

INSTALL EXPOSED METAL CONDUIT:

01-25-83 02-25-88 0%

INSTALL POWER CONTROL, INSTRUMENTATION AND SECUTITY CABLE:

02-03-87 04-27-90 0%

INSTALL ELECTRICAL TERMINATIONS:

05-15-87 05-03-90 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

04-06-90 04-20-90 0%

l CONDUCT NOT FUNCTIONAL TEST:

N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

09-28-88 01-01-91 0%

I i

C0NSTRUCTIOH STATUS REP 0OT PAGE HO: 2-052 HARTSVILLE B-1 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTER I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000520 CORPORATE CONTACT:

G. KIMMONS, MANAGER CP NO. 8 DATE ISSUED: CPPR-152/ 05-09-77 0FFICE OF ENG. 8 CONSTRUCTION CP EXPIRATION DATE:

CORPORATE ADDRESS:

400 COMr1ERCE AVENUE APPLICANT:

TENNESSEE VALLEY AUTHORITY KNOXVILLE, TENNESSEE 37902 j

PLANT LOCATION:

40 MI E OF NASHVILLE, TH IE REGION:

2 CORPORAlE PHONE NO:

(615) 632-2911 l

AE:

TENNESSEE VALLEY AUTHORITY I

NSSS:

CENERAL ELECTRIC CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MUE):

1205 IE RESIDENT INSPECTOR:

W. SWAN INSPECTION STATUSt FUEL L0AD DATE CHAHGES TIME PERIO?

AS REPORTED BY UTILITY:

Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE RATE SCIIEDUL E REPORTED BY UTILITY Nil?1D ER OF INSP.

OF INSP.

07-23-76 04-26-82 SLIPPAGE DUE TO REEVALUATIDH OF 8205 04-20-82 04-23-82 CONSTRUCTIDH SCHEDULE STATUS BY TVA.

8206 04-01-82 04-30-82 05-06-77 09-01-82 DELAY IN ISSUANCE OF LWA PART II.

8207 05-03-82 05-28-82 09-12-79 03-00-88 NO REASON NOTED.

09-10-80 07-00-94 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

09-30-81 N/S DEFERRED.

L0CA L PUBLIC D0CUMENT R 0 0 M:

STATE LIBRARY AND ARCHIVES 403 SEVENTH AVENUF, NORTH NASHVILLE, T EtiMESSEE 37219

i C0NSTRUCTION SVATUS REPORT PAGE NO: 2-053 IIARTSVILLE B-1 NUCL EAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLIC1NT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-00-94 DEFINED IN CP: (EARLIEST) 06-00-81 APPLICANT'S ESTIMATED FUEL LOADIliG DATE AT CP ISSUANCE:

12-00-81 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMr1ERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

17%

C0fC1ENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITN OPTION TO RESTART AS MECESSAP.Y.

4 ESTIMATED ACTUAL ESTIMATED' ACTUAL ESTIMATED START iTARL COMPLETTON QMPLF.lIQJi K_Ca!1PLETE MOBILIZE AHD PREPARE SITE:

04-22-76 05-51-77 100%

PLACE STRUCTURAL CONCRETE:

09-29-77 I!4 STALL REACTOR PRESSUPE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INST ALL L APGE BORE PIPE HANGERS, RESTRAINTS AND SNL'BBERS:

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

INSTALL E? POSED METAL CONDUIT:

INSTALL POWER. C0!! TROL, INSTRUMENTATION AND SECURITY CABLE:

INS 1ALL ELECTRICAL TERf11NATICHS:

CD11 DUCT REACTCP COLD HYD2OSTATIC TEST:

C0:lDUCT HOI FUNCTI0t!AL TEST:

C0!: DUCT PREOP AND ACCEPTAtlCE TESTS NECESSARY FOR FUEL LOAD:

i t

i

C0HSTRUCT IOH STATUS REP 0RT PAGE NO: 2-054 HARTSVILLE B-2 HUCLEAR POWER PLAN TS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N H E L:

DOCKET NO:

05000521 CORPORATE CONTACT:

G. KImtDNS, Mr.HAGER CP NO.

  • DATE ISSUED: CPPR-153/ 05-09-77 0FFICE OF ENG. 8 CONSTRUCTION CP EXPIRATION DATE:

CORPORATE ADDRESS:

400 COMMERCE AVENUE APPLI'4HT:

TENNESSEE VALLEY AUTHORITY KH0XVILLE, 1EHNESSEE 37902 PLANT LOCATION:

40 MI E OF HASHVILLE, TN IE REGION:

2 CORPORATE PHONE NO:

(615) 632-2911 AE2 TENNESSEE VALLEY AUTHORITY HSSS:

GENERAL ELECTRIC CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

1205 IE RESIDENT INSPECTOR:

W. SWAN IHSPECTION S T A T U S:

FUEL L0AD DATE CHAHGES TIME PERIOD AS REP 0RTED BY UTIL I T Y:

Anr. 19f,2 - Jun. 1982 REPORT NEW CdASON FOR CilANGC REPORT BEG DATE END DATE DATE Sc4rDUE R E PpMFQ,Jy_Ull,,t_IJ,X fulMF3 0F INSP.

OF INSL 07-23-76 04-26-83 SLIPPfGE PUE TO REEVALUATION OF 8205 04-20-82 04-23-82 CCNSTRUCTICH SCHEDULE STATUS BY TVA.

8206 04-01-82 04-30-82 05-06-77 09-01-83 DELAY IN ISSUAMCE OF LUA PART II.

8207 05-03-82 05-23-82 09-12-79 03-00-89 NO REASON HOTED.

09-10-80 07-00-95 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

09-30-81 N/S DEFERRED.

L0 CAL PUBLIC DDCUMENT R 0 0 M:

STATE LIBRARY AND APCHIVES 403 SEVENTH AVENUE, NORTH NASHVILLE. TENNESSEE 37219

. - _ _ ~ -

C0NSYRUCT ION SLT A T U S R E P.0 R T PAGE NO: 2-0S5 HARTSVILLE B-2 N U C.L E A R P0WER P L A N T S.

STATUS AS CF:

06-30-02 I

C0NSTRUCTION S T A T U S:

?

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-00-95 DEFINED IN CP: (EARLIEST)

APPLICt.NT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

12-00-82 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT Cot:STRUCTION COMPLETE:

7%

i COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITH OPTION TO RESTART AS HECESSARY.

I i

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

$TMi S U R L_

MZPJ LT_.1."f]

[M7L QI Otj f;_CNjr_!ATI MOBILIZE AND PREPARE SITE:

04-22-76 03-31-/7 1005 PLACE STRUCTURAL CONCRETE:

09-29-77

)

j INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE. BORE PROCESS PIPt:

INSTALL LARGE BORE PIfE HANGERS. RESTRAINTS AND SNU23ERS:

1 l-i INSTALL SMALL BORE PIPE:

i INSTALL CABLE TRAY:

I I

INSTALL EXPOSED METAL CONDUIT:

I j

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS:

I

{

CONDUCT REACTOR COLD HYDRDSTATIC TEST:

i CONDUCT HOT FUNCTIONAL TEST:

}

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD i

i i

i 1

i i

i i

t-J C0NSTRUCTION ST ATUS REPORT PAGE NO: 2-056 Il0PE CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 il N E L :

DOCKET NO:

05000354 CORPORATE CONTACT:

T. J. MARTIN, VICE PRESIDENT CP NO. 8 DATE ISSUED:

CPPR-120/ 11-04-74 ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:

12-31-86 CORPORATE ADDRESS:

80 PARK PLAZA APPLICANT:

PUBLIC SERVICE ELECTRIC 8 GAS NEWARK, NEW JERSEY 07101 FLANT LOCATION:

18 MI SE OF WILMINGTON, DEL IE REGION:

1 CORPORATE PHONE NO (201) 430-8316 AE:

BECNTEL NSSS:

GENERAL EL ECTRIC CONSTRUCTOR:

BECHTEL HRC LPM:

D. LYNCH REACTOR TYPE:

BUR IE PROJECT INSPECTOR:

DER (f:WE):

1067 IE RESIDENT INSPECTOR:

W. H.

BATEMAN YHSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD A5 REPQRTED BY UTILITY Ape. 19 Q - Jun. 198R REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHED_QLE RFPORTED BY UTILITY M!tlfLER OF INSP pF INSL m

04-00-75 06-00-82 DELAY IN OBTAINING STATE OF NEW JERSEY 82-05 04-05-82 05-02-82 COASTAL AREAS FACILITY PERMIT.

82-06 05-03-82 05-31-82 05-00-76 12-00-82 REEVALUATION OF DEALY CAUSED BY N. J.

CDASTAL AREAS FACILITY PERf1IT.

10-00-76 11-00-83 RE-EXAf11 NATION OF THE EFFORT REQUIRED TO CONSTRUCT THE PLANT.

Inspection Reports are available at local PDRs.

02-00-80 11-00-84 NO REASON GIVEN.

08-00-80 06-00-86 LOWER THAN ANTICIPATED ELECTRICITY SALES CROHTH, CONTINUED INFLATION, AND RECESSIONARY TRENDS IN ECONOMY.

08-00-82 01-00-86 TARGET FUEL LOAD DATE.

L0 CAL PUBL IC D0CUMENT R 0 0 M:

SAlfM FREE PUBLIC LIBRARY 11? WEST LPOADW4Y S ALEf t, NEW JERSEY 08079

~_

.t 7

3 3 8 E

0 DT 0

EE 2

3 TL AP% % % % % % % % % % % A %

6 S

MM0 0

0 2 8 5 7 9

0 0

0

/

0 0

0 A

IO0 0

0 6

2 4

N N

TC1 1

1 E

S E

T E%

G F A

A O M

P I

N S

T O7 9

0 A

S LI7 7 8 E

AT S

UE0 0

0 A

U N

6 TL0 0

0

/

T O 8 CP N

A I

AM8 9

2 T

T 1

00 0

1 S

E 3 L

P 2 M

1 O

H C)

DD7 9

0 4 4 5 4

5 5 5 5 6

T EI7 7 8 8 8 8 8 3 8 8 8 8

NS)

Tl-OET AE0 0

0 0

0 0

0 0

0 0

0 A

0 IIS ML0 0

0 0

0 0

0 0

0 0

0

/

0 TLE IP -

N CR1 TM8 0

2 0

0 8 2 4 4 5 5 1

1 1

1 1

0 0

0 0

0 0

0 UAA SO0 REL EC T((

S N:

OP CC 6

7 0

9 9

1 9

1 T

L 7

7 8

7 7

8 7

8 SN E

AT -

R TI L

UB0 0

0 0

0 0

0 0

A M

U TA0 0

0 0

0 0

0 0

/

0 AD C

CT -

N CE E

AS3 3 1

4 4

7 8 5 P

IN H

0 0

1 0

0 0

0 0

S LI C

E PF S

T PE R

AD T

D 6

7 0

9 9

1 9

1 3

3 5

5 N

E E

7 7

8 7

7 8

7 8 8 8 8 8

G TT -

A R

AR0 0

0 0

0 0

0 0

0 0

0 A

0 S

A MA0 0

0 0

0 0

0 0

0 0

0

/

0 L

T IT N

U TS2 7

1 4

4 2 8 9

2 3

5 9

P T

S 0

C 1

0 0

1 0

0 0

0 0

0 T

N E

E A

w w

S R

6616 E

T 8888 R

E P

E D

5 0000 r

L A

W 0000 E

S B

O H

R A

L 1666 T

E C

O N

0000 B

L P

N B

Y E

O O

U T

U

E l

I F

i I

ET D

S R

R CA

% E U

R T

tD 0

S D

C O

t A

Ai A

N E

F C

Ut B

A S

E

S0 w

Y U

ESI t

S D

R L

ETIT E

4 N

A T

R TA A

i S A

S C

ADPR 0

U I

S T

D CE L

T A

N E

C U

G P P

A R

O E

S GNTG M

T T

I T

1 N

tIA C S S

T S

t t

N ID i

C E

A E

DAEf N

R T

T S

D AOTI N O N

T C

S OLAC O

I c :

S I

E C

L DR I

T L E S M

I T

T S

L E

T C

E P R U

t LEGM C U S

I E

T R 0 A

U EUNM U R S

P G I

T I

T E

UFIO R

T w

E N

U S T

S T

C A

O S N T

F DC T

S V S A

D ll DA S N E E S H N

I N

R E

A A 3EOD N

O T

T E

E O

I D

T T

M Y

P rTLE O C I

E R C

E E C

T iA T

C S R U O P P

L R

H E

A1LA T

C S

R I

I L

O E I

C t

T N

E N S P P P A R T

D N C

5 MIE1 4

E R

O E T

T L

O A

t ITUI f

TSFT E R A

C R E E E Y E N L

O I

SE S

C R

P P

R R

R A M O A C

T D

N E

DE R U E

L O O O R C C C N SE E C R

A R B B B T

D I

R N

A O

TUTT P

P R O E

, R O U NOAN G

U T

E E L

E S R T

T F

P I

EIME D N D

T C G G L

L O

E C C O

RVIR E

I N

C A

R R

A B P W E A

T E

T RETR T

D A U E A

A M

A X O L

E P

O R

URSU A R R R L

L S

C E P E R I

C CPEC M A E

I I

G Z S L L

L L

L L

L L

T T

T U SSSS T

E I

L L

L L

L L

L L

C C

C S R L

E A A

A A

A A A A U U U R

TT1T E

I C

T T

T T

T T

T T

D D C NNHN S

B A

S S S S S ; S S N

N N

S CCCC N H M

P I

I I

t N N O O O 1

T AAAA T

T O

L N

t:

N I

I I

I C C C N

K IIII E

C E

LLLL R

M E

N PPPP R M PPP U

O A A t. P R

A C C C

0 E

C P

C H

J, 3

2 i

]

l

.i 0

4Id 1I" 4

4 4

M

ii

C0N3TRUCTION STATU$

REPORT PAGE NO: 2-038 LASALLE 2 NUCLEAR POHER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET NO:

05000374 CORPORATE CONTACT:

B. LEE, JR., VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-100/ 09-10-73 CP EXPIRATION DATE:

12-31-80 CORPORATE ADDRESS:

P. D.

BOX 767 APPLICANT:

COMMONWEALTH EDISON CHICAGO. ILLINDIS 60690 PLANT LOCATION:

11 MI SE OF OTTAWA. ILL IE REGION:

3 CORPORATE PHONE NO:

(312) 294-3103 AE SARGENT 8 LUNDY HSSS:

GENERAL ELECTRIC l

CONSTRUCTOR:

COMMONWEALTH EDISON NRC LPM:

A.

BOURt4I A REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

H. WESCOTT DER (MWE):

1078 IE RESIDENT INSPECTOR' R. WALKER l

t IN$PECTION S T A T U S:

FUEL L0AD DATE CHANGES 1

TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE 4

REPORT BEG DATE END DATE DATE LCJ1EDi!LE MP_0 R T_E.D. B Y U_i_I_LJJJ T

NUT 1B ER OF INSP.

OF INSP, 09-01-76 LICE!1 sit!G DEL AYS.

8202 03-24-82 03-26-82 10-01-77 LICENSING DELAYS /PUBLIC HEARINGS.

8203 04-14-82 04-15-82 10-15-73 01-01-79 PUBLIC HEARINGS.

8204 04-16-82 04-16-82 10-17-74 06-01-79 ECO:;0:1IC REASONS.

8205 05-25-82 06-10-82 04-20-77 03-00-80 REASSESST1ENT OF CONSTRUCTION SCHEDULE STATUS.

Inspection Reports are available at local PDRs.

09-24-79 06-00-81 DESIGN DELAYS AND CONSTRUCTION DELAYS CAUSED BY CGl1PLEXITY OF It!CLUDING MACK II CO:IT AIt!f1ENT HYDRODYHAt1IC LOADS.

05-14-80 12-00-81 NO REASO1 PROVIDED.

01-14-81 05-00-82 NO REA50t1 PROVIPED.

09-30-31 12-00-82 FOCUS Ott U:!IT 1 AL TERATIONS U!!ICH REFLECT Pti UNIT 2 II;STALLATI0tl.

03-31-82 04-30-83 FOCUS OM UNIT 1 ALTERATIONS UllICH REFLECT ON UtlIT 2 INSTALLATION.

l L0 CAL PUBLIC D0CUMENT R 0 0 M:

ILLINDIS VALLEY C0f1MUNITY COLLEGE RURAL ROUTE NO. 1 OGLESBY, ILLINDIS 16348

.__m 1

C0NSTRUCVION 5T AVUS REP 0RT PAGE NO: 2-059 LASALLE 2 NUCLEAR POWER PLANTS

. STATUS AS OF:

06-30-82 l

CDHSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:

04-30-83 APPLICANTS CCNSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

12-00-82 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTInATED FUEL LOADING DATE AT CP ISSUANCE:

08-01-7S (LATEST) 03-31-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-31-83 CURRENT ESTIMATED PERCrNT CONSTRUCTION COM?LETE: 87%

CCMMENTS REGARDING CURRENT CONSTRUCTION STATU.3:

1 1

t i

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11 ART __

IDM FTIOji ROU[1, E TJ QN, 3_.C0tjt.L FJ_E MOBILIZE AND PREPARE SITE:

10-00-73 07-00-74 100%

PLACE STRUCTURAL CONCRETE:

07-00-74 09-00-76 100%

4 INSTALL REACTOR PRESSURE VESSEL:

11-00-76 11-00-76 100%

INSTALL LARGE BORE PROCESS PIPE:

11-00-76 02-00-82 03-00-82

-1004 INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SHUBBERS:

01-00-77 11-00-82 58%

INSTALL SMALL BORE PIPE:

11-00-76 06-00-82 06-00-82 100%

INSTALL CABLE TRAY:

09-00-77 01-00-82 04-00-82 100%

INSTALL EXPOSED METAL CONDUIT:

01-00-77 01-00-83 92%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURI1Y CABLE:

02-00-78 02-00-83 75%

9 INSTALL ELECTRICAL TERMINATIONS:

02-00-78 02-00-83 76%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

12-00-82 12-00-82 04 CONDUCT liOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A J

CONDUCT PREGP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

07-00-82 04-00-83 0%

t 1

l 1

4 i

C0NSTRUCTIOH STATUS REPQRT PAGE N08 2-060 LIMERICK 1 HUCLEAR P0WER PLAHTS STATUS AS OF:

06-30-82 PLANT CHARACTERIST I C St KEY PERS0NNELa DOCKET NO:

05000352 CORPORATE CONTACT:

V. S. BOYER. SENIOR VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-106/ 06-19-74 HUCLEAR POWER CP EXPIRATION DA'E:

10-01-85 CORPORATE ADDRESS:

PHILADELPHIA ELECTRIC COMPANY APPLICANT:

PHILADELPHIA ELECTRIC 2301 f1ARKET STREET PLANT LOCATION:

35 t11 NW OF PHIL ADELPHI A.

PA PHILADELPHIA. PENNSYLVANIA 19101 IE REGION:

1 CORPORATE PHONE NO:

(215) 841-4500 AE:

BECHTEL HSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BECHTEL NRC LPM:

H. ABELSON REACTOR TYPE:

BUR IE PROJECT INSPECTOR:

DER (MWE):

1065 IE RESIDENT INSPECTOR:

J. P. DURR IHSPECT IOH S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPCRTED BY U T I L I T Y:

Apr. 1982 - Jun. 198_R REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE E3_TE 3pi!LDJ11 RFPORTED BY UTILTTY 1!!![lR_FR 0F LN.SA 0F IHSPa 09-27-74 10-01-80 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING 82-07 04-12-82 04-26-82 P R O B L Et15.

82-03 04-26-82 05-13-82 10-15-75 08-01-80 SCHEDULE REFINEMENT AND BUDGET 82-09 05-26-82 05-28-82 ADJUSTMENTS.

05-24-?',

G-G1-82 HICHER CAPITAL COSTS AND LOWER THAH EXPECTED DEMAND FOR ELECTRICITY.

09-23-80 10-00-83 II: CREASE OF SCOPE DUE TO DESIGN CHANGES Inspection Reports are available at local PDRs.

8 NEW REGULATORY REQUIREPENTS, DESIGN PROBLEllS ASSOCI ATED W/ MARK II CONT AINMENT, REFINEllENT OF ESTIt1ATES. AND LIMI!S OH YEARLY CAPITAL AVAILABLE.

02-20-81 10-00-84 REFINEMENT OF MANHOUR ESTIMATES AND DURATIONS REQUIRED TO COMPLETE RE;1AINING ENGINEERING AND FIELD WORK.

i L0 CAL PUBLIC D0CUMEHT R 0 0 M:

POTTSTOUN PUBLIC LIBRARY 500 HIGH STREET POTTSIDWN, pet;HSYLVANIA 19464 1

C 0 N S T R t! C T I O N STATUS REP 0RT PAGE NO 2-061 I

LIMERICK 1 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION STATUS i

APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:

10-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS l

APPLICANT'S PREVIOUS ESTIMATED FUEL LDADING DATE:

10-00-83 DEFINED IN CP: (EARLIEST) 10-00-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

07.-00-79 (LATEST) 10-00-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-01-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 76%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WE CONTINUE TO REPORT THE OVERALL COMPLETION PERCENTAGES BASED ON ON TOTAL SCOPE AND MANHOUR EXPENDITURES.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START _

MMEEURH Q MPLETION 3._QMPLETE MOBILIZE AND PREPARE SITE:

05-00-70 05-00-70 09-00-74 09-00-74 100%

PLACE STRUCTURAL CONCRETE:

07-00-74 07-00-74 11-00-80 11-00-80 100%

INSTALL REACTOR PRESSURE VESSEC:

11-00-76 11-00-76 12-00-76 12-00-76 100%

INSTALL LARGE BORE PR0' CESS PIPE:

01-00-76 01-00-76 02-00-83 97%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

01-00-76 01-00-76 04-00-83 79%

INSTALL SMALL BORE PIPE:

01-00-77 01-00-77 06-00-83 80%

INSTALL CABLE TRAY:

01-00-76 01-00-76 02-00-83 04-00-82 100%

INSTALL EXPOSED METAL CONDUIT 02-00-76 02-00-76 11-00-83 75%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-00-81 01-00-81 01-00-84 50%

INSTALL ELECTRICAL TERMINATIONS:

01-00-81 01-00-81 03-00-84 44%

CONDUCT REACTOR COLD NYD20 STATIC TEST:

09-00-83 09-00-83 0%

CONDUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS i!ECESSARY FOR FUEL LOAD:

07-00-82 05-00-82 10-00-84 0%

i

C0NSTRUCTION 5TATUS REPOOT PAGE NO: 2-062 LIMERICK 2 NUCLEAR POWER PiANTS STATUS AS OF 06-30-82 PLANT CNARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000353 CORPORATE CONTACT:

V. S. BOYER. SENIOR VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-107/ 06-19-74 NUCLEAR POWER CP EXPIRATION DATE:

10-01-87 CORPORATE ADDRESS:

PHILADELPHIA ELECTRIC COMPANY APPLICANT:

PHILADELPHIA ELECTRIC 2301 MARKET STREET PLANT LOCATION:

35 MI NW OF PHILADELPHIA. PA PHILADELPHIA. PENNSYLVANIA 19101 IE REGION:

1 00RPORATE PHONE NO:

(215) 841-4500 AE BECHTEL NSSS:

GENERAL ELECTRIC i

CONSTRUCTOR:

BECHTEL HRC LPM:

N.

ABELSON REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

1065 IE RESIDENT INSPECTOR:

J. P. DURR IN5PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYr Aor. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-27-74 10-01-81 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING 82-05 04-05-82 05-02-82 PROBLEMS.

82-06 05-03-82 05-31-82 10-15-75 01-01-82 SCHEDULE REFIPf_ DENT AND BUDGET ADJUSTMENTS.

05-24-76 10-01-84 HIGHER CAPITAL COSTS AND LOWER THAN EXPECTED DEMAND FOR ELECTRICITY.

Inspection Reports are available at local PDRs.

09-23-80 10-00-86 INCREASE OF SCOPE DUE TO DESIGN CHANGES 8 NEW REGULATORY REQUIREMENTS, DESIGN PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT, REFINEMENT OF ESTIMATES AND LIMITS OH YEARLY CAPITAL AVAILABLE.

02-20-81 04-00-87 REFINEMENT OF MANHOUR ESTIMATES AND DURATIONS REQUIRED TO COMPLETE REMAINING ENGINEERING AND FIELD WORK.

07-01-52 N/S PENNSYLVANIA PUBLIC UTILITY COMMISSION RULING TO DEFER / CANCEL UNIT 2.

1 L0 CAL PUBLIC DDCUMENT R 0 0 M:

POTTSTOWN PUBLIC LIBRARY 500 HIGH STREET POTTSTOWN, PENhSYLVANIA 19464 l

~

C0NSTRUCTION STATUS REPQRT PAGE NO: 2-063 LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF 30-82 C0N5TRUCTION S T A T U S:

3, ATPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/$

APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS i

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

04-00-87 DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

09-00-80 (LATEST)

APPLY u

'S CURRENT ESTIIIATED COMMERCIAL OPERATION DATE: N/S CU" RENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 30%

CDP.MONIS REGARDING CURRENT CONSTRUCTION STATUS: WE CONTINUE TO REPORT OVERALL COMPLETION PERCENTAGES. B ASED ON TOTAL SCOPE AND MANHOUR EXPENDITURES.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

_eTART

$ T AllT_

GM_!'L E110_Hj QMPLETIDH % COMPLETE A

MOBILIZE AND PREPARE SITE:

05-00-70 05-00-70 09-00-74 09-00-74 100%

PLACE STRUCTURAL CONCRETE:

09-00-74 09-00-74 11-00-80 11-00-80 100%

INSTALL REACTOR PRESSURE VESSEL:

09-00-77 09-00-77 10-00-77 10-00-77 100%

INSTALL LARGE BORE PROCESS PIPE:

01-00-76 01-00-76 04-00-85 21%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

01-00-76 01-00-76 12-00-84 15%

INSTALL SMALL BORE PIPE:

01-00-78 01-00-78 01-00-85 4%

INSTALL CABLE TRAY:

06-00-78 06-00-78 06-00-85 11%

INSTALL EXPOSED METAL CONDUIT:

12-00-82 04-00-86 0%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-00-84 09-00-86 0%

INSTALL ELECTRICAL TERMINATIONS:

03-00-84 11-00-86 0%

C0!! DUCT REACTOR COLD NYDR0ST ATIC TEST:

05-00-86 05-00-86 0%

CONDUCT NOT FJNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

08-00-85 04-00-87 l

C0NSTRUCTION STATUS REPORT PAGE NO: 2-064 MARBLE HILL 1 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000546 CORPORATE CONTACT:

S. W. SHIELDS. SEN. VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-170/ 04-04-78 NUCLEAR DIVISION CP EXPIRATION DATE:

01-01-84 CORPORATE ADDRESS:

P. O. BOX 190 APPLICANT:

PUBLIC SERVICE OF INDIANA NEW WASHINGTON, IN 47162 PLANT LOCATION:

to MI $ OF MADISON. IN IE REGION:

3 CORPORATE PHONE NO:

(812) 289-1000 AE SARGENT 4 LUNDY HSSS:

WESTINGHOUSE CONSTRUCTOR:

PUBLIC SERVICE OF INDIANA NRC LPM:

E. L. DOOLITTLE REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

J. E. KONKLIN DER (MWE):

1130 IE RESIDENT INSPECTOR:

J. J. HARRISON, JR.

INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

08-00-80 06-00-86 NO REASON PROVIDED.

8122 11-16-81 12-04-81 8205 03-29-82 04-02-82 8206 03-09-82 03-12-82 8208 03-01-82 03-31-82 8209 04-01-82 04-30-82 8210 05-01-82 05-31-82 8211 05-17-82 05-21-82 Inspection Reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 Ms MADISON-JEFFERSON COUNTY PUBLIC LIBRARY 470 WEST MAIN STREET MADISON, INDIANA 47250 1

C0NSTRUCTIOH STATUS REP 0RT PAGE HO 2-065 MARBLE HILL 1 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 CDHSTRUCTION

$ T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

06-00-86 APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

04-00-82 DEFINED IN CPI (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

04-00-82 (LATEST) 01-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETEt 41%

COMMENTS REGARDING CURRENT CCHSTRUCTIDH STATUS: THE ABOVE NUMBER INDICATES THE PHYSICAL COMPLETION OF CONSTRUCTION BASED ON EARNED MANHOURS. STATUS AS OF 07-31-82.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED 4

START START EDHPLEIJJ3 COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

08-00-77 06-00-86 85%

PLACE STRUCTURAL CONCRETE:

01-00-78 12-00-85 82%

INSTALL REACTOR PRESSURE VESSEL.

10-00-82 08-00-82 11-00-84 0%

INSTALL LARGE BORE PROCESS PIPE:

01-00-79 01-00-86 37%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERSt 01-00-79 01-00-86 20%

INSTALL SMALL BORE PIPE 02-00-80 03-00-86 9%

INSTALL CABLE TRAY:

04-00-80 03-00-85 26%

INSTALL EXPOSED METAL CONDUIT

  • 04-00-80 10-00-85 13%

INSTALL POWER. CONTROL,.INSTRUMENTATIDH AND SECURITY CABLE:

01-00-82 12-00-85 3%

INSTALL ELECTRICAL TERMINATIONS:

01-00-82 03-00-86 4%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

08-00-85 08-00-85 0%

CONDUCT HOT FUNCTIONAL TEST 02-00-86 02-00-86 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LDAD:

01-00-85 06-00-86 0%

C0NSTRUCTION STA TUS REPQRT PAGE NO: 2-066 MARBLE HILL 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S O N N E L:

4 DOCKET NO:

05000547 CORPORATE CONTACT:

S. W.

SHIELDS. SEN. VICE PRESIDENT CP NO. 8 DATE ISSUED:

CPPR-171/ 04-04-78 NUCLEAR DIVISION CP EXPIRATION DATE:

01-01-86 CORPORATE ADDRESS:

P. O.

BOX 190 APPLICANT:

PUBLIC SERVICE OF INDIANA NEW WASHINGTON, IN 47162 PLANT LOCATION:

10 MI S OF MADISON, IN IE REGIDH 3

CORPORATE PH0HL NO:

(812) 289-1000 AE SARGENT 8 LUNDY NS$$8 WESTINGNOUSE CONSTRUCTOR:

PUBLIC SERVICE OF INDIANA NRC LPM:

E. L. D00LITTLE REACTOR TYPE PWR IE PROJECT INSPECTOR:

J.

E. KONKLIN DER (MWE):

1130 IE RESIDENT INSPECTOR:

J. J. HARRISON, JR.

INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD A5 REPQRTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP, 08-00-80 06-00-87 NO REASON PROVIDED.

8122 11-16-81 12-04-81 09-15-82 12-00-87 NO REASON PROVIDED.

8205 03-29-82 04-02-82 8206 03-09-82 03-12-82 8208 03-01-82 03-31-82 8209 04-01-82 04-30-82 8210 05-01-82 05-31-82.

8211 05-17-82 05-21-82 Inspection Reports are available at local PDRs.

L0 CAL PUBL IC D0CUMENT R 0 0 M:

MADISDN-JEFFERSON COUNTY PUBLIC LIBRARY 420 WEST MAIN STREET MADISON, INDIANA 47250

f f

C0N5TRUCTION ST^TUS REP 0RT PAGE N08 2-067 MARBLE HILL 2 HUCLEAR P0WER FLANTS STATUS AS OF 06-30-82 C0N$TRUCTION S T A T U 5:

l-APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-00-87 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS i

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-87 DEFINED IN CPt (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

07-00-83 (LATEST) 01-01-86 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE 06-00-88 CURRENT ESTIMATED PERC'ENT CONSTRUCTION COMPLETE: 21%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS THE ABOVE HUMBER INDICATES THE PHYSICAL COMPLETION OF CONSTRUCTION BASED ON EARNED MANHOURS. STATUS AS OF 07-31-82.

1

+

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START GD5PLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

12-00-77 06-00-86 85%

PLACE STRUCTURAL CONCRETE:

03-00-78 12-00-86 78%

INSTALL REACTOR PRESSURE VESSEL:

09-00-83 00-86 0%

INST ALL L ARGE BORE PROCESS PIPE:

05-00-79 12-00-86 23%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

05-00-79 12-00-86 31%

INSTALL SMALL BORE PIPE:

05-00 03-00-87 2%

l INSTALL CABLE TRAY:

06-00-81 12-00-85 26%

i INSTALL EXPOSED METAL CONDUIT:

10-00-81 03-00-86 5%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

09-00-83 12-00-86 0%

)

INSTALL ELECTRICAL TERMINATIONS:

03-00-8'.

03-00-87 0%

I CONDUCT REACTOR COLD HYDR 0 STATIC TEST 02-00-87 02-00-87 0%

l CONDUCT HOT FUNCTIONAL TEST 08-00-87 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

07-00-86 12-00-87 0%

i I

1 4

u

C0NSTRUCTION STATUS REPQRT PAGE NO: 2-068 MCGUIRE 2 HUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTERISTICSt KEY PERSONNEL DOCKET NO 05000370 CORPORATE CONTACT:

H. B. TUCKER, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-84 / 02-23-73 NUCLEAR PRODUCTION, DUKE POWER CD.

CP EXPIRATION DATE:

03-01-77 CORPORATE ADDRESS:

P8 33189, 422 S. CHURCH STREET APPLICANT:

DUKE POWER CHARLOTTE, NORTH CAROLINA 23242 PLANT LOCATION:

17 MI h DF CHARLOTTE, NC IE REGION:

2 CORPORATE PHONE NO (704) 373-4531 AE DUKE POWER NSSS:

WESTINGHOUSE CONSTRUCTOR:

DUKE POWER NRC LPM:

R. BIRKEL REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1180 IE RESIDENT INSPECTOR:

P. R. BEMIS INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY HUMBER OF INSP.

OF INSP.

i 05-01-77 INITIALLY DELAYED IN RECEIVING CONSTRUCT-8207 04-20-82 04-23-82 IDH PERMIT. CONSTRUCTION DELAYED BY 8208 05-11-82 05-14-82 INCREASED DELIVERY TIME OF MATERIAL AND 8210 05-11-82 05-14-82 COMPONENTS.

8211 05-11-82 06-11-82 07-26-74 12-15-77 CONSTRUCTION DELAYED BY INCREASED 821E 04-17-82 05-15-82 DELIVERY TIME OF MATERIAL AND COMPONENTS.

8213 06-07-82 06-11-82 09-27-74 08-00-78 C9T3TRUCTION DELAYS DUE TO CRITICAL 8214 06-15-82 06-18-82 C !sDITIONS EXISTING IH THE FINANCIAL MARKETS.

Inspection reports are available at local PDRs.

04-21-76 09-15-78 NO REASON GIVEN BY THE UTILITY.

04-18-77 08-50-79 CONSTRUCTION DELAY.

08-16-77 N/5 LATE EQUIPMENT DELIVERIES. DESIGN MODIFICATIONS 09-20-77 10-10-80 DUE TO CHANGED REGULATORY REQUIREMENTS.

08-13-79 01-00-82 NO REASON GIVEN.

08-00-80 06-00-82 NO REASON PROVIDED.

10-29-81 04-01-83 HD REASON PROVIDED.

L0 CAL PUBLIC D0CUMENT R 0 0 Ms ATKINS LIBRARY UNIV. OF NORTH CAROLINA UNCC STATION CHARLOTTE, NORTH CAROLINA 23223

C0N5TRUCTIOH STATUS REPORT PAGE NO: 2-069 MCGUIRE 2 HUCLEAR POWER

  • LAHT5 STATUS AS OF 06-30-82 C0NSTRUCTIOH S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-01-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS i

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-82 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-76 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-01-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 974 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iLMl_

COMPLETION g.QM_PLQ1pj % COMPLETE MOBILIZE AND PREPARE SITE:

04-01-71 05-08-72 100%

PLACE STRUCTURAL CONCRETE:

05-08-72 08-01-82 99%

I STALL REACTOR PRESSUSE VESSEL:

06-09-75 06-10-75 100%

INSTALL LARGE BORE PROCESS PIPE:

03-01-75 12-01-82 99%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

04-01-75 01-00-83 90%

INSTALL SMALL BORE PIPE 04-01-78 01-00-83 98%

INSTALL CABLE TRAY:

08-01-74 08-01-82 98%

. INSTALL EXPOSED METAL CONDUIT 08-01-74 09-01-82 98%

INSTALL POWER, CONTROL INSTRUMENTATIDH AND SECURITY CABLE:

04-01-77 10-01-82 98%

INSTALL ELECTRICAL TERMINATI0HS:

04-15-77 10-01-82 98%

CONDUCT REACTOR COLD HYDR 0 STATIC TEST 07-19-82 05-24-82 07-28-82 100%

CONDUCT HOT FUNCTIONAL TEST 09-01 10-26-82 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

10-27-82 04-01-83 0%

4

- ~ ~

1 C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-070 1

l MIDLAND 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82

. PLANT CHARACTERISTICS:

KEY PERSONNELa I

DOCKET ND:

05000329 CORPORATE CONTACT:

J. W. COOK, VICE PRESIDENT

+

1 CP HO. 8 DATE ISSUED: CPPR-81 / 12-15-72 PROJECTS, ENG & CONSTRUCTION l

CP EXPIRATION DATE:

12-01-84 CORPORATE ADDRESS:

1945 W. PARNALL ROAD APPLICANT:

CONSUMERS POWER JACKSON, MICHIGAN 49201 PLANT LOCATIONr SW DOUNDARY OF MIDLAND, MICH.

IE REGION:

3 CORPORATE PHONE NO:

(517) 788-0453 AE BECHTEL HSSS:

BABCOCK & WILCOX CONSTRUCTOR:

BECHTEL MRC LPM:

D. HOOD REACTOR TYPE:

PWR IE PROJECT INSPECTOP:

D. BOYD DER (MWE):

0492 IE RESIDENT INSPECTOR:

R. J. COOK 4

a INSPECTION STATUSt FUEL L0AD DATE CHANGES i

TIME PERIOD A5 R E.P 0 R T E D BY UTILITY 1

Aor. 1982 - Jun. 1982-REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTTLITY.

J' NtJMBER OF INSP.

OF INSP.

)

11-07-74 11-00-80 CONSTRUCTION SCHEDULE STRETCHOUT TO 8205 02-03-82 03-30-82 REDUCE CURRENT CASH OUTFLOW.

8206 03-17-82 03-19-82 01-14-75 11-00-81 CCNSTRUCTION SCHEDULE STRETCHED OUT TO l

8208 05-18-82 05-21-82 REDUCE CURRENT Ct.SH OUTFLOW.

8212 06-01-82 06-02-82 09-00-80 12-00-83 PROJECT SCHEDULE REEVALUATION INCORPORATING OUTSTANDING LICENSING ISSUES.

Inspection Reports are available at local PDRs.

i I

i L0 CAL PUBLIC D0CUMENT R00M 4

f GRACE DOW MEMORIAL LIBRARY 1710 W. ST. ANDREWS ROAD MIDLAND MICHIGAN 48640 i

i t

4

4 C0NSTRUCTION STATUS REPORT PAGE NO: 2-071 MIDLAND 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS e

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-81 DEFINED IN CP (EARLIEST) 12-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-00-79 (LATEST) 12-08-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 07-00-84w-CURRFNT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 83%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: W COMMERCIAL OPERATION FOR BOTH PROCESS STEAM AND ELECTRICAL.

MM PERCENT COMPLETE IS LARGE BORE HANGERS. RESTRANTS AND SHUBBERS ARE NOT INCLUDED.

ESTIMATED ACTUAL ESTIMATED

-ACTUAL ESTIMATED START iTART COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

03-00-73 08-00-73 100%

PLACE STRUCTURAL CONCRETE:

08-00-73 01-00-82 99%

i INSTALL REACTOR PRESSURE VESSEL:

06-00-78 08-00-78 100%

INSTALL LARGE BORE PROCESS PIPE:

07-00-76 08-00-82 98%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:MN 12-00-77 03-00-83 95%

INSTALL SMALL BORE PIPE:

01-00-77 12-00-82 95%

INSTALL CABLE TRAY:

04-00-77 12-00-82 99%

i INSTALL EXPOSED METAL CONDUIT:

04-00-77 03-00-83 92%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

11-00-78 06-00-83 90%

INSTALL ELECTRICAL TERMINATIONS:

06-00-78 06-00-83 73%

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

12-00-82 12-00 0%

CONDUCT HOT FUNCTIONAL TEST:

05-00-83 06-00-83 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

07-00-82 12-00-83 0%

l

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-072 MIDLAND 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY PERS0NNELt DOCKET N08 05000330 CORPORATE CONTACT:

J. W. COOK, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-82 / 12-15-72 PROJECTS, ENG 8 CONSTRUCTION CP EXPIRATION DATE:

07-01-84 CORPORATE ADDRESS:

1945 W. PARNALL ROAD APPLICANT:

CONSUMERS POWER JACKSON, MICHIGAN 49201 PLANT LOCATION

  • SW BOUNDARY OF MIDLAND, MICH.

IE REGIDH 3

CORPORATE PHONE NO:

(517) 788-0453 AE8 BECHTEL HSSSt BABCOCK & WILCOX CONSTRUCTOR

  • BECHTEL NRC LPM:

D. HOOD REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

D. BOYD DER (MWE):

0818 IE RESIDENT INSPECTOR:

R. J. COOK INSPECTION, STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

11-07-74 11-00-79 CONSTRUCTION SCHEDULE STRETCHED OUT TO 8205 02-03-82 03-30-82 REDUCE CURRENT CASH OUTFLLA ANNOUNCED BY 8206 03-17-82 03-19-82 UTILITY.

8208 05-18-82 05-21-82 01-14-75 11-00-80 CONSTRUCTION SCHEDULE STRETCHED OUT.

8212 06-01-82 06-02-82 09-11-79 06-00-81 DEVELOPMENT OF A TWO UNIT INTEGRATED TEST SCHEDULE.

Inspection Reports are available at local PDRs.

09-00-80 07-00-83 PROJECT SCHEDULE REEVALUATION INCORPORATING OUTSTANDING LICENSING ISSUES.

L0 CAL PuLLIC D0CUMENT R 0 0 Mr GRACE DOW MEMORIAL LIBRARY 1710 W. ST. ANDREWS ROAD 4

MIDLAND MICHIGAN 48640 l

i C0NSTRUCTION STATUS REPORT PAGE NO: 2-073 MIDLAND 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 c0N5TRUCTION STATUSt APPLICANT'S CbdRENT ESTIMATED FUEL LDADING DATE:

07-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-81 DEFINED IN CP: (EARLIEST) 07-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-00-78 (LATEST) 07-01-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 12-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 83%

COMMENIS REGARDING CURRENT CONSTRUCTION STATUS: M PERCENT COMPLETE IS LARGE BORE HANGERS. RESTRAINTS AND SNUBBERS ARE NOT-INCLUDED.

1 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START _

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

03-00-73 08-00-73 100%

PLACE STRUCTURAL CONCRETE:

08-00-73 04-00-83 99%

INSTALL REACTOR PRESSURE VESSEL:

04-00-78 05-00-78 100%

INSTALL LARGE BORE PROCESS PIPE 2 04-00-76 08-00-82 98%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS M 11-00-77 03-00 33 91%

INSTALL SMALL BORE PIPE:

01-00-77 12-00-82 89%

INSTALL CABLE TRAY:

04-00-77 03-00-83 99%

INSTALL EXPOSED METAL CONDUIT:

04-00-77 03-00-83 84%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-00-78 06-00-83 90%

INSTALL ELECTRICAL TERMINATIONS:

06-00-78 06-00-83 73%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

10-00-82 10-00-82 0%

CONDUCT HOT FUNCTIONAL TEST:

01-00-83 03-00-83 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

07-00-82 08-00-83 0%

9 4

C0NSTRUCTION STATUS REP 0RT PA3E NO: 2-070 MZLLSTONE 3 HUCLEAR POWER PLAWTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E Le DOCKET NO:

05000423 CORPORATE CONTACT:

W. G. COUNSIL VICE PRESIDENT CP NO. 2 DATE TSSUED: CPPR-113/ 08-09-74 NUCLEAR ENGINEERING & OPERATIchS CP EXPIRATION LATE:

10-01-79 CORPORATE ADDRESS:

P. D.

BOX 270 APPLICANT:

NORTHEAST NUCLEAR ENERGY HARTFORD, CONNECTICUT 06101 PLANT LOCATION:

5 MI SW OF NEW LONDON, CONN IE REGIGH:

1 CORPORATE PHONE NO:

(203) 666-6911 AE:

STONE 8 WEBSTER NSSS:

WESTINGHOUSE CD;;SI RUC T OR :

STONE 8 WEBSTER NRC LPM:

J. GRANT REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (nWE):

1159 IE RF5IDENT INSPECTOR:

2HSPECTIDH STATUS:

FUEL LOAD DATE CHAMGES TIME PERIOD AS RCP0RTED BY UTILITY Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE i

REPORT BEG DATE E!iD D AT E DATE SCHEDULE REPORTED BY UTILITY EUMBER OF INSP.

OF INSP.

03-03-75 06-00-79 REEVALUATION OF PROGRAM STATUS.

82-05 04-12-82 04-16-82 11-00-76 12-00-81 1 UNCERTAIN FUEL SUPPLY.

82-06 04-12-82 05-14-82

2. CHANGES IN LOAD DEMAND.

82-07 06-07-82 06-08-82

3. INCREASES IN PROJECT COST.

I 82-08 06-22-82 07-30-82

4. MODIFICATIONS IN LONG RANGE PLANNING.

10-20-77 12-00-85 FINANCIAL CONSIDERATIONS.

1 Inspection Reports are available at local PDRs.

l L0 CAL PUBL IC DDCUMENT R00Mr WATERFORD PUBLIC LIBRARY R0PE FERRY ROAD, ROUTE 156 WATERFORD, C0!f M EC T ICU T 06385

C0N5TRUCTION 5TATUS REPORT PA~E NO: 2-075 MILLSTONE 3 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION S T A T U S:

A/PLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-01-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

12-01-81 DEFINED IN CP: (EARLIEST) 12-01-78 APPLICAPT'S ESTIMATED FUEL LOADING DATE AI CP ISSUANCE:

12-01-78 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-01-86 i

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 43%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: HD UPDATE PROVIDED FOR THE SECOND QUARTER OF 1982.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START hlA IT _

$0Mf_L1112ti COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

05-00-74 09-00-74 09-00-74 100%

PLACE STRUCTURAL CONCRETE:

10-00-74 08-00-74 71%

INSTALL REACTOR PRESSURE VESSEL:

07-00-80 07-00-80 07-00-80 100%

INSTALL LARGE BORE PROCESS PIPE:

02-00-77 01-00-85 43%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBEP.S:

02-00-77 01-00-85 18%

INSTALL SMALL BORE PIPE:

02-00-77 01-00-85 20%

INSTALL CABLE TRAY:

03-00-77 01-00-85 43%

INSTALL EXPOSED METAL CONDUIT 10-00-77 01-00-84 15%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

03-00-78 12-00-84 0.8%

i INSTALL ELECTRICAL TERMINATIONS:

03-00-78 01-00-85 0.5%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

03-00-85 03-00-85 03-00-85 0%

CONDUCT HOT FUNCTIONAL TEST:

08-00-85 08-00-85 08-00-85 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-00-85 12-00-85 12-00-85 0%

4 S

T

C0NSTRUCTION

$TATUS REPORT PAGE NO: 2-376 HINE MILE POINT 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLAN 1 CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000410 CORPORATE CONTACT:

S. F. MANNO, VICE PRESIDENT HUCLEAR CONSTRUCTION CP KO. 8 DATE ISSUED: CPPR-ft2/ 06-24-74 CP EXPIRATION DATE:

07-13-78 CORPORATE ADDRESS:

300 ERIE BOULEVARD WEST SYRACUSE, NEW YORK 13202 APPLICANT:

MIAGARA MOHAWK POWER PLANT LOCATION:

8 MI NE OF OSWEGO, NY IE REGION:

1 CORPORATE PHONE NO:

(315) 474-151$

AE STONE 8 WEBSTER NS$$8 GENERAL ELECTRIC CONSTRUCTOR:

STONE 8 WEBSTER HRC LPM:

D. LYNCH REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

1080 IE RESIDENT IH!PECTOR:

R. D. SCHULE I N S*P E C T I O N STATUS FUEL L0AD DATE-HANGES e

TU10 PERIOD AS R E P O'R'1 e

60 BY ' 3/ T7LITY' Aor. 1982 - Jun. 1982 REPCRT NEW

. REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED_BY UTILIt1 NUMBER OF INSP.

OF INSP.

t

~ 03-31-83 1 DESIGN C6tANGES 10 MITIGATE CONTAIMMENT 03-14-78 82-04 05-11-82 05-13-82 DYNAMIC LOADS.

82-05 05-10-82 06-03-82

2. DESIGN CHANGES TO IMPLEMENT SEPARATION 82-06 06-01-82 06-01-82 REQUIREMENTS OF REG. GUIDE 1.75.

12-14-78 03-31-84

1. WORK STOPPAGES AND SHUTDOWN OF J05.
2. DELAYS IN PROCUREMENT OF EQUIPMENT.

l

3. REESTIMATE OF SCHEDULE POWER REQMTS.

Inspection Reports are available at Iocal PDRs.

4. HEARING DELAYS.

08-00-80 03-08-86 1.

POWER GENERATION CONTROL COMPLEX (PGCC).

2. GEOLOGICAL IMPACTS.
3. MARK II CONTAINMENT.
4. BIOLOGICAL SHIELD WALL.
5. THREE MILE ISLAND IMPACTS.
6. NEW YORK STATE PUBLIC SERVICE COMMISSION.

1 t

i L0 CAL PUBLIC D0CUMENT R00Ms STATE UNIVERSITY' COLLEGE AT OSWEGO PENFIELD LIBR4RY"

/

OSWEGO, NEW YORK 13126 i

s t

t 5

A.._

E

+

4

,I CDHSTRUCTION

$TATUS REPORT PAGE NO: 2-077 NINE MILE POINT 2 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 3

C0N$TRUCTION 5TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

03-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE 04-00-84 DEFINED IN CP8 (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-01-78 (LATEST) j APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 10-01-86 t

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 50%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START mg.L.

GMFEQH COMPLETION 3_CQMPLETE MOBILIZE AND PREPARE SITE 08-25-75 08-25-75 08-01-76 08-01-76 100%

i j

PLACE STRUCTURAL CONCRETE:

05-09-77 05-09-77 08-19-85 77%

INSTALL REACTOR PRESSURE VESSEL:

08-13-79 08-13-79 08-08-80 08-08-80 100%

INSTALL LARGE BORE PROCESS PIPE:

06-07-76 06-07-76 12-03-84 50%

INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS:

09-05-77 09-05-77 12-03-84 24%

INSTALL SMALL BORE PIPE:

04-01-82 05-01-82 83-11-85 1%

1 INSTALL CABLE TRAY 11-06-78 11-06-78 07-09-84 44%

INSTALL EXPOSED METAL CONDUIT 8 09-12-77 09-12-77 08-12-85 25%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-04-82 03-01-82 10-07-85 0%

l i

INSTALL ELECTRICAL TERMINATIONS:

04-01-82 12-30-85 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

04-29-85 05-20-85 0%

l CONDUCT HOT FUNCTIONAL TEST N/A N/A N/A N/A N/A 1

CONDUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 11-14-83 02-24-86 0%

1 1

I I

i l

C0NSTRUCTION STATUS QEPOQT PAGE NO: 3-078 NORTH ANNA 3 HUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

05000404 CORPORATE CONTACT:

S. C. BROWN. JR., SR. V. P.

CP NO. 4 DATE ISSUED: CPPR-114/ 07-26-74 PSELC CP EXPIRATION DATE:

12-21-83 CORPORATE ADDRESS:

P. O.

BOX 26666 APPLICANT:

VIRGINIA ELECTRIC 8 POWER R I Citt10H D, VIRGINIA 23261 PLANT LOCATION:

40 MI NW OF RICHMOND, VA IE REGION:

2 CURPORATE PHONE NO:

(804) 771-3274 AE STONE 8 WEBSTER NSSS:

BABCOCK 3 WILCOX CONSTRUCTOR:

CUNER HRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

C. R. TICFARLAND DER (MWE):

0907 IE RESIDENT IllSPECTOR:

INSPECTION ST A T U S:

FUEL L0AD DAT E CHANGES tit 1E PERIOD A$ R E P 0 R.T E D BY U T I L I T Y:

Apr. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE ELI.FDjJ1( RJLO RED _B_Y___lj_T_LU Tl T

NUMBE3 0F INSP.

OF T NSL 03-21-75 07-00-80 EC0!;0t1IC FACTORS.

8208 04-13-82 04-16-82 07-23-76 11-01-80 SCilEDULE SLIPPAGE IS DUE TO REEVALUATION 8209 06-03-82 06-03-82 0F C0!!STRUCTION PROGRESS.

03-01-77 11-00-81 VOLUNTARY DELAY DUE TO EFFORTS AT t

CONSERVATION AMD LOAD MANACEt1ENT.

Inspection reports are available at local PDRs.

04-00-80 N/S NO Rf'ASON PROVIDED.

11-19-81 04-00-89 LOAD t1AttAGEf1ENT.

l l

I i

L0 CAL PUBLIC D0CUMENT R 0 0 M:

ALDERMAN LIBRARY LOUISA COUNTY COURTHOUSE i

UNIVERSITY OF VIRGINIA P. O. BOX 27 CHARLOTTESVILLE, VA 22901 LOUISA. VIRGINIA 23093 4

C0NSTRUCTION SVATUS REP 0RT PACE NO: 2-079 NORTH ANNA 3 NUCLEAR POUER PLANTS STATUS AS OF:

06-3C-t2 C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-00-39 APPLICANTS CCNSTRUCTION Ce"PLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-31 DEFINED IN CP: (EARLIEST) 07-31-73 APPLICANT'S ESTIMATED FUEL LOADING DATE AT C? ISSUANCE:

07-00-78 (LATEST) 12-31-83 APPLIC ANT 'S CURRENT ESTIf1AT ED COII.'1ERCI AL CPER A TION D A TE: 10-00-39 CURRENT ESTIMATED PERCENI L4[51RUCTION COMPLETE:

3%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: ROCK ANCHORS FOR SITE FOUNDATIONS AND INSTALLATICN OP RECIRCULATING SPRAY PUMP PIT LOL'ER LINrRS ARE CURRENTLY UNDET'nY.

PLR0EMI CollS10UC T ION COMPLETE UNDER REVIEW.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

_SJ,, R T START 3

Cnf,PL E T I nN COPP! QIatJ t rc"PtFTE j

MOBILIZE AND PREPARE SITE:

07-0u-12 01-02-16 100:

PLACE STRUCTURAL CCNCRETE:

01-02-76 11-29-86 19%

INST ALL REACTOR PRESSURE VESSEL:

10-21-8S 11-13-8S 0%

INSTALL LARGE BOPE PROCESS PIPE:

09-06-34 03-30-37 0%

INSTALL LARGE BORE PIPE HANGERS, RESTKAINTS AND SNUBDERS:

09-06-34 03-30-37 0%

INSTALL SMALL BORE PIPE:

'Y' 11-0S-34 02-13-33 0%

INSTALL CABLE TR?Y:

11-0S-34 10-12-07 0%

INSTALL EXPOSED METAL CONDUII:

12-03-84 09-26-35 C *:

INSTALL POWER. CCNTROL. INSTRUMENTATION AND SECURITY CABLE:

11-19-54 11-07-03 0%

INSTALL ELECTRICAL TERF11 NATIONS:

09-00-3S 12-07 3 0%

CONDUCT REACTOR COLD NYCR0 STATIC TEST:

09-26-33 10-17-33 0%

CONDUCT HOT FUNCTIONAL TEST:

11-14-83 01-02-39 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-00-36 04-00-39 0%

C0NSTRUCTION STA TUS REPORT PAGE NO: 2-080 PALD VERDE 1 NUCLEAR POWER PLANT $

STATUS AS OF 06-30-82 PLAHT C H A R A C T E R I 5 T I C S:

KEY P E R S O N N E La DOCKET NO:

05000528 CORPORATE CONTACT:

E.

E. VAN BRUNT. JR., VICE PRES.

CP NO. 8 DATE ISSUED: CPPR-141/ 05-25-76 NUCLEAR PROJECTS MANAGEMENT CP EXPIRATIDH DATE:

11-01-82 CORPORATE ADDRESS:

P. O. BOX 21666 l

APPLICANT:

ARIZONA PUBLIC SERVICE PHOENIX, ARIZONA 85036 4

PLANT LOCATIDH:

36 t1I W OF PHOENIX. AZ IE REGION:

5 CORPORATE PHONE NO:

(602) 271-7900 AE:

BECHTEL NSSS:

CO:1DUSTION ENGINEERING CONSTRUCTOR:

BECHTEL NRC LPM:

E. LICITRA i

REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

i DER (t*WE):

1304 IE RESIDENT INSPECTOR:

L. VORDERBRUEGGEN IN$P ECT ION STA T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RT ED BY UTILITY Anr. 1982 - Jun. 19AR REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE R3TE

$$HXRHlf REPORTED BY UTILITY HMUEXE OF-INSP.

OF INSP, 09-13-79 11-00-82 NO REASON REPORTED.

82-10 03-29-82 04-02-82 07-28-82 08-01-83 It1 PACT OF SCHEDULING PROBLEMS WITH KEY 82-11 05-10-82 05-14-82 EQUIPMENT.

82-12 04-01-82 04-30-82 AUGMENTATION OF THE PLANT'S EMERGENCY 82-13 05-03-82 05-28-82 RESPONSE SYSTEM AS RESULTS OF TMI LESSONS 82-14 05-01-82 05-30-82 LEARNED. COMPLEXITY OF THE TRANSITION 82-15 04-26-82 04-23-82 FROM CONSTRUCTION TO STARTUP PHASE.

82-16 05-01-82 05-31-82 82-17 05-11-82 05-14-82 82-18 06-08-82 06-10-82 l

82-19 06-01-82 06-30-82

}

i Inspection Reports are available at local PDRs.

4 1

L0 CAL P 11 B L I C D0CUMENT R 0 0 M:

PHOENIX PU3LIC LTBRARY 12 FAST MCD0' ELL PGAD PHOENIX. ARIZONA 85004 i

CDHSTRUCTION STATUS REPORT PAGE NO: 2-081 PALC VERDE 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION STATU5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

08-01-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-82 DEFINED IN CP (EARLIEST) 06-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-00-81 (LATEST) 11-01-82 APPLI 4t.i'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 12-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 96%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION GQMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

05-00-76 10-00-76 100%

PLACE STRUCTURAL CONCRETE:

08-00-76 01-00-81 100%

INSTALL REACTOR PRESSURE VESSEL:

11-00-78 12-00-78 100%

INSTALL LARGE BORE PROCESS PIPE:

03-00-77 10-00-82 99%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

09-00-78 01-00-83 97%

INSTALL SMALL BORE PIPE:

06-00-78 01-00-83 96%

INSTALL CABLE TRAY:

10-00-77 01-00-82 11-00-81 100%

4 INSTALL EXPOSED METAL CONDUIT 03-00-78 02-00-83 93%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-00-79 02-00-83 90%

INSTALL ELECTRICAL TERMINATIONSI 08-00-79 03-00-83 82%

CONDUCT REACTOR COLD HYDROSTATIC TEST

  • 05-00-82 07-00-82 05-00-82 07-00-82 100%

CONDUCT HOT FUNCTIONAL TEST 03-00-83 05-00-83 0%

CONDUCT PREOP AND ACCEPTANCF TESTS NECESSARY FOR FUEL LOAD:

01-00-82 10-00-81 08-00-83 5%

C0NSTRUCT ION STATUS REP 0RT PAGE NO: 2-082 PALO VERDE 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTER IST I C S:

K EY PERS0NNEL:

DOCKET NO:

05000529 CORPORATE CONTACT:

E.

E. VAN ERUNT.

JR., VICE PRES.

CP NO. 8 DATE ISSUED:

CPPR-142/ 05-25-76 NUCLEAR PROJECTS MANAGEMEt:T CP EXPIRATION DATE:

11-01-84 CORP 0CATE ADDRESS:

P. O.

BOX 21666 APPLICANT:

ARIZONA PUBLIC SERVICE PHOENIX, ARIZONA 85036 PLANT LOCATION:

36 MI W OF PHOENIX. AZ IE REGION:

5 CORPORATE PHONE NO:

(602) 271-7900 AE:

BECHTEL NSSS:

CD.9DUSTION ENGINEERING CONSTRUCTOR:

BECHTEL HRC LPM:

E. LICITRA REACTOR TYPE:

PL'R IE PROJECT INSPEC10R:

DER (MUE):

1334 IE RESIDENT INSPECTOR:

L. VDRDERBURECGEN IN5PECT ION 5TA T U St FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED DY UT IL I T Y:

Anr. 19P2 - Jun. 198R REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE E$_T_E ECJ[F D,U_Q P FP p3gD _ BY (f T f_L,T_TJ NUMRF3 0F INSP.

OF INS _P.

07-28-82 08-01-84 DELAYS IN CC"PLETION OF UNIT 1.

82-05 03-29-82 04-02-82 82-06 04-01-82 04-30-82 82-07 05-01-82 05-30-82 82-08 05-11-82 05-14-32 Inspection Reports are available at local PDRs.

L0 CAL Pb dCUMENT R 0 0 Mr PHOENIX PUBLIC LIBRARY 12 EAST MCDOWELL ROAD PHOENIX. ARIZONA 85004

C0N5TRUCTION STATUS REPORT PAGE NO: 2-083 PALO VERDE 2 NUCLEAR POWER PLANTS STATUS AS CF:

06-30-82 C0NSTRUCTION 5 T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

08-01-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-83 DEFINED IN CP: (EARLIEST) 02-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-00-83 (LATEST) 11-01-84 APPLICANT'S CURRENT ESTIMATED COMMEPCIAL OPERATION DATE: 12-00-34 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 88%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

} TART

[njiPjfyM C0(tM FTIDH

?.

COMP 1EE MOBILIZE AND PREPARE SITE:

06-00-76 06-00-71 1003 PLACE STRUCTURAL CONCRETE:

08-00-77 12-00-81 12-00-81 100%

INSTALL REACTOR PRESSURE VESSEL:

06-00-80 07-00-80 100%

INSTALL LARGE BORE PR9 CESS PIPE:

09-00-78 03-00-83 98%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUEDERS:

10-00-78 07-00-83 80%

INSTALL SMALL BORE PIPE:

04-00-79 07-00-83 80%

INSTALL CABLE TRAY:

06-00-78 03-00-82 03-00-82 100%

INSTALL EXPOSED METAL CONDUIT:

01-00-78 0 7 - 0 0 - P. 3 35%

INSTALL POWER, CONTROL. INSTRUMENTATION AND SECURITY CABLE:

02-00-81 09-00-83 62%

INSTALL ELECTRICAL TERMINATIONS:

05-00-81 10-00-83 St%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

07-00-83 07-00-83 0%

CONDUCT NOT FUNCTIONAL TEST:

02-00-84 03-00-84 0%

l CONDUCT PREOF AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

06-00-83 08-00-84 0%

C0NSTRUCTION 5TATUS REPGRT PAGE NO: 2-084 1

PALO VERDE 3 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNEL DOCKET NO:

05000530 CORPORATE CONTACT:

E. E. VAN BRUNT. JR., VICE PRES.

CP NO. 8 DATE ISSUED:

CPPR-143/ 05-25-76 HUCLEAR PROJECTS MANAGEMENT CP EXPIRATIDH DATE:

11-01-86 CORPORATE ADDRESS:

P.

O. BOX 21666 APPLICANT:

ARIZONA PUBLIC SERVICE PHOENIX. ARIZONA 85036 PLANT LOCATION:

36 MI W OF PHOENIX. AZ j

i IE REGION:

5 CORPORATE PHONE NO:

(602) 271-7900 AE:

BECHTEL l

NSSS:

C0t1BUSTION ENGINEERING CONSTRUCTOR' BECHTEL MRC LPM:

E. LICITRA REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MME):

1304 IE RESIDENT INSPECTOR:

L. VORDERBUREGGEN IN5PECTION STATUSt FUEL' L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITYe Anr. 1982 - Jun, 198R REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE 1CFEDULE REPORTED BY UTILITY HUM 3Eg 0F INSP.

OF INSP.

]

82-05 03-29-82 04-02-82 82-06 04-01-82 04-30-82 82-07 05-01-82 05-30-82 82-08 05-11-82 05-14-82 Inspection Reports are available at local PDRs.

l l

N i

4 i

L0CA L PUBLIC D0CUMENT R 0 0 M:

i PHOENIX PUBLIC LIBRARY 12 EAST NCDOWELL ROAD Pil0ENIX. ARIZONA 85004 i

1

C0N$TRUCTION STATUS REPORT PAGE NO: 2-085 PALD VERDE 3 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

11-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-85 DEFINED IN CP: (EARLIEST) 11-01-84 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-00-85 (LATEST) 11-01-86 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 42%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START ilARI_

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

06-00-76 04-00-79 100%

PLACE STRUCTURAL CONCRETE:

03-00-79 01-00-84 84%

INSTALL REACTOR PRESSURE VESSEL:

04-00-82 04-00-82 05-00-82 05-00-82 100%

INSTALL LARGE BORE PROCESS PIPE:

04-00-79 09-00-84 54%

INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:

10-00-80 01-00-85 14%

INSTALL SMALL BORE PIPE:

06-00-80 01-00-85 6%

l l

INSTALL CABLE TRAY:

04-00-80 03-00-84 47%

l INSTALL EXPOSED METAL CONDUIT:

01-00-80 11-00-84 30%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

09-00-82 02-00-85 0%

INSTALL ELECTRICAL TERMINATIONS:

02-00-83 05-00-85 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST 02-00-85 02-00-85 0%

l CONDUCT HOT FUNCTIONAL TEST 06-00-85 08-00-85 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

09-00-84 11-00-85 0%

J l

m m

m C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-026 PERRY 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E La DOCKET NO:

05000440 CORPORATE C0t! TACT:

D.

R.

DAVIDSON, VICE PRESIDENT j

CP NO. 8 DATE ISSUED:

CPPR-148/ 05-0 3-7 7 ENGINEERING L

CP EXPIRATION DATE:

CORPORATE ADDRESS:

P.

D. BOX 5000/55 PUBLIC SQUARE L

i APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING CLEVEL A!;D, 01110 44101 PLANT LOCATION:

7 MI NE OF PAINESVILLE, ONIO i

IE REGION:

3 CORPORATE PNCNE NO:

(216) 622-9808 AC GILBERT ASSOCIATES

  1. 4SSS:

GENERAL ELECTRIC i

CONSTRUCTOR:

OLINER NRC LPM:

J. J. STEFANO REACTOR TYPE:

BNR IE PT:0 JECT INSPECTOR:

J. E. K0t:XLIN 1205 IE RESIDENT INSPECTOR:

M.

GILP;3ER DER (MWE)r l

I INSPECTION $ T A T U S:

FUEL L0AD DATE CHANGES h

TIME PERIOD AS REPQRTED BY UTIL I T Y:

i Apr. 1982

.lun.

1982 REPORT NEtJ REASON FOR CilANCE REPORT BFG DATE END DATE D1_E iCH E Dull RfPORT(D BY UTU T TY NUMBER OF INSL O F I N S_P_,,

03-25-77 05-30-81 LICENSING DELAYS.

8201 04-21-82 04-21-82 01-18-79 05-00-82 SCl!EDULE REEVALUATION.

8202 04-21-82 04-23-82 02-00-80 05-00-33 NO REASON PROVIDFD.

8203 02-23-82 03-10-82 02-22-82 11-00-83 NO REASON PROVIDED.

8204 03-01-82 04-30-82 8205 01-25-82 02-28-82 1,

t Inspection Reports are available at local PDRs.

1 4

i i

i i

I J

L0 CAL PUBLIC DOCUMENT ROOM PERRY PUBLIC LIBRARY 3753 MAIN STREET PERRY, ONIO 44081 I

I 7

2

'l t! }'

ii 8

F~

l1 0

Df 3

E E.

2 3

II AT.

% % % % % i 7 A 4 5

S

! 0 0

0 3

3 0

?

9 3

0

/

0 3

0 A

IC0 9

0 9

7 7

9 6

5 5 N

N TC1 1

E S

E T

Ei G P A

i A

O f

P I

N S

T P5 3

A S

L, T I1 7

E

?

S UF0 0

U N

TL0 0

T O

C'.-

A I

A" 3

9 T

T 00 0

S E

0 L

P M

O N

C) 3O 3

3 3

3 2

3 3

3 3

3 T

EI 2

0 8 *,

  • 3 0 C 3 3

NS)

TT OET 2

Ar 0

0 3

3 0

3 0

0 0

A 0

IIS 5

Mt 0

0 0

0 0

0 0

0 0

/

0 TLE 9

T M'.

I N

CPT 1

5 7

8 3

6 7

0 3

3 0

UAA Sr 0

0 0

0 0

0 1

1 D

1 RfL F

EC T((

O S

N:

R OP E

CC f

4 6

3 8 9

9 9

T 9

L

/

7 7

7 7

7 7

SN A

AT -

R TI U

UR3 0

3 0

3 7

0 N

C TA0 0

0 0

0 1

0 O

AD CT -

CE D

AS3 3

7 7

8 0

3 P

IN N

1 0

0 0

0 1

0 S

LI C

E PF C

T PL E

R AD S

D 3

N L

8 E

!T A

H AD 3

A S

T M ?.

0

/

L IT N

U R

TS 3

P O

S 0

T F

E A

D R

3114 E

T 8833 D

E I

E D

5 3003 V

L A

W 0030 O

S D

O s

R P

A L

O 1555 P

E C

N 1000 B

L P

E D

Y E

O T

U T

U

E A

N I

F I

E!

D S

R R

Cf i

P U

R T

!D t

U D

C C

A M

S N

E F

C U!

O A

S t

E

SC N

Y U

ESI S

D R

L ETIT E

T N

A R

Tt A

T S

N A

S C

ADP0 E.

U I

S T

D CE I

T A

N E

U G

P A

R O

C T'

S GNTO S

S T

S N

t T

T I

E H

FIA D

H ID L

C E

A E

DAEA N

R T

T S

0 AOTI N

O N

T OLAC O

I E

C S

C t

L DR I

T L

E S M

S I

E S

L E

T C

E P R

U N l

T LEG:

C U

S I

E T

R O A 1

U EU!M U R S

P C

I T

I T

E t

UFIC R

T E

N U S T

S T

C T

F DC T

S V S A

D N A

O S

N DA S

N E E S H N

I N

R E A A DLOD N

O T

T E E O

I D

T T

M Y

P ETLE O

C I

E R C

E E C

T TA T

C S R U

O P P L

R H

L E

AlLA T

C S R I

I L

O E

A C S

MlE:t T

N E N S

P P P T

T L

O A

A R T

D N C IiUI N

E R O E

TSFT E R A

C R E E E Y

E N L

O I

SE S C

R P

P R

R A

O A C T

D t

t H E DE R

U E

L 0 O 0

R C

C C N SE E

C R

A R 3 B

D T

D I

R N A O

TUTT P

P R O E

, R O

U NOAN G

U T

E E L

E S

T T

T F

P I

E I :tE D N D

T C G C L

L O

E C C O

RVIR E

I N

C A

P.

P A

B P N E

A T

E T

RETR T

D A

U E

A A M A

X O

L E

D R URSU A

R R R L

L S

C E P E P H P C CPEC tt A

E T

I G

Z S L

L L

L t

L L

L T

T T

U SSSS T

E I

L L

L L

t L

L L

C C C S

R L

E A A

A A A

A A A

U U U R

TTTT E

I C

T T

T T

T T

T T

D D D NNNN S

B A S

S S

S S

S S S N N

N T

AAAA T

T O

L N N N N N

N N N O O O CCCC N N N P I

I I

I I

I I

I C C C S

IIII E

E LLLL R

M.

H PPPP R

P t

PPPP U

C 0

AAAA C

C Y

R C

R E

P

!i

_ - - _ - - - - -.. - -. ~

C0NSTRUCTION STATUS QEPORT PAGE NO: 2-088 PERRY 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 i

PLAHT CHARACTERISTICS KEY P E R S O N N E L:

DOCKET NO:

05000441 CORPORATE CONTACT:

D. R. DAVIDSON, VICE PRESIDENT CP NO, 8 DATE ISSUED: CPPR-149/ 05-03-77 ENGINEERING CP EXPIRATION DATE:

CORPORATE ADDRESS:

P. O. BOX 5000/55 PUBLIC SQUARE APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING CLEVELAND, OHIO 41101 i

PLANT LOCATION:

7 MI NE OF PAINESVILLE, ONIO IE REGION:

3 CORPCRATE PHONE NO:

(216) 622-9608 AE:

GILBERT ASSOCIATES NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

OWNER NRC LPM:

J. J. STEFAND REACIOR TYPE:

BUR IE PROJECT INSPECTOR:

J.

E. KONKLIN DER (f;WE):

1205 IE RESIDENT INSPECTOR:

M. GILDNER INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY:

Apr. 1c32 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE EATE 1[HFfULE RfPORTED BY NTILITY

['1qfin F3 0F INSP OF INSP.

a 03-25-77 12-30-82 LICENSING DELAYS.

4 8201 04-21-82 04-21-82 01-18-79 09-00-83 SCHEOULE REEVALUATION.

8702 04-21-82 04-25-82 02-00-80 05-00-87 NO REASON PROVIDED.

8203 02-23-82 03-10-32 8204 03-01-82 04-30-82 8205 01-25-82 02-28-82 Inspection Reports are availabic at local PDRs.

t 1

1 1

)

}

L0CA L PUBL IC D0CUMENT R00

}

PERRY PUBLIC LIBP. arf l

3753 r1AIN STREET PERRY, O!:IO 44031 I

4 I

C0NSTRUCT ION STATUS REPORT-PAGE NO: 2-089 PERRY 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 i.

C0N5TRUCTION STATUSi l

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

05-00-87 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS l

APPLICANT'S FREVIOUS ESTIf1ATED FUEL LOADING DAIE:

09-00-83 DEFINED IN CP (EARLIEST)

ArPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

12-30-82 (LATEST) l APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-00-88 j

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 41%

i C0ftMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED TOR THE SECOND QUARTER OF 1982.

}

I ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

__} TART iTART COMPLETION COMPLETIDH % COMPLETE MOBILIZE AND PREPARE SITE:

10-00-74 04-00-76 100%

PLACE STRUCTURAL CONCRETE:

04-00-76 10-00-85 89%

INSTALL REACTOR PRESSURE VESSEL:

10-00-78 01-00-79 100%

}

INSTALL LARGE BORE IROCESS PIPE:

04-00-79 11-00-86 18%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

04-00-79 11-00-86 14%

INSTALL SMALL BORE PIPE:

12-00-86 0%

1 INSTALL CABLE TRAY:

10-00-78 09-00-85 30%

l INSTALL EXPOSED METAL CONDUIT:

10-00-78 01-00-87 24%

J j

INSiALL PONER, CONTROL,INSTRUMENTATICH AND SECURITY CABLE:

04-C0-80 02-00-87 0%

INSTALL ELECTRICAL TERMINATIONS:

06-00-80 02-00-87 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST 04-00-86 04-00-86 0%

CONDUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

01-00-85 04-00-87 0%

i j

4 l

... ~.. - _ ~.. --

..- -..-_~

-. ~ _... -

I n

C0NSTRUCTION STATUS REPORV PAGE NO: 2-090 I

PNIPPS BEND t NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICS:

KEY PERS0NNEL:

DOCKET NO:

05000553 CORPORATE CONTACT:

G. KIMMONS, MANAGER i

CP HO. 8 DATE ISSUED: CPPR-162/ 01-16-78 0FFICE OF ENG. DESIGN 8 CONST.

CP EXPIRATION DATE:

04-00-84 CORPORATE ADDRESS:

400 COMMERCE AVENUE APPLILANf3 TENNESSEE VALLEY AUTHORITY KNOXVILLE, TENNESSEE 37902 PLANT LOCATION:

15 MI SW OF KINGSPORT, TENN IE REGION:

2 CORPORATE PHONE NO:

(615) 632-2911 AE TENNESSEE VALLEY AUTHORITY NSSS:

GENERAL ELECTRIC CONSTRbCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

1 DER (MWE):

1220 IE RESIDENT INSPECTOR:

4 INSPECTION 5 T A T U 5:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITYr Anr. 1982 - Jun. 1982 a

REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE PATJ__ 1E!!EDJLtd R E P O R T E D_JY U T.JLI_TY 4

NUMBER OF INSP.

OF INSP.

I 09-12-79 02-00-86 NO REASON STATED.

8201 04-20-82 04-23-32 09-10-80 12-00-87 HO REASON PROVIDED.

03-14-81 01-00-93 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

}

1 i

i i

L0 CAL PUBLIC DDCUMENT R 0 0 M:

1 KINGSPORT PUBLIC LIBRARY BROAD 8 NEW STREETS KINGSPORT, TENNESSEE 37660 i

}

4

C0NSTQUCTION 5TATUS REPORT PAGE NO: 2-091 PHIPPS BEND 1 NUCLEAR POWER PLANTS STATUS AS OF

'06-30-82 C0NSTRUCi ION b IATUSr APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

01-00-93 APPLICANTS CONSTRUCTION COMPLETION E*'IMA7" AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

12-00-87 CEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

01-00-83 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMi1ERCIAL OPERATION DATE: 10-00-93 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 29%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: CONSTRUCTION IN DEFERRED STATUS EFFECTIVE 01-01-82.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START ST ARL Ent1Pt,EM ON COMPLFTTON MCry1E_T_[

MOBILIZE AND PREPARE SITE:

10-19-77 12-04-89 70%

PLACE STRUCTURAL CONCRETE:

08-18-78 02-17-93 67 INSTALL REACTOR PRESSURE VESSEL:

11-11-80 12-01-80 100%

INSTALL LARGF BORE PEOCESS PIPE:

04-30-79 06-29-92 19%

INSTALL LARGE EORE PIPE HANGERS, RESTRAINTS AND SNUB 3ERS:

0%

INSTALL SMALL BORE PIPE:

0%

INSTALL CABLE TRAY:

04-14-80 04-26-91 14%

l INSTALL EXPOSED METAL CONDUIT:

04-14-80 04-26-91 6%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-27-81 02-17-93 6%

INSTALL ELECTRICAL TERMINATIONS:

01-12-90 02-17-93 4%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

06-22-92 06-29-92 04 CONDUCT HOT FUNCTIONAL TEST N/A N/A 0%

j CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

06-23-91 12-29-92 0%

. _. ~ _

?

?

C0N5TRUCT IOH

$TATUS REP 0RT PAGE HO: 2-092 PHIPPS BEND 2 NUCLEAR POWER PLAHTS STATUS AS OF:

06-30-82 PLANT CHARACTERISTICSt KEY PERS0HHELa DOCKET NO:

05000554 CORPORATE CONTACT:

G. KIMMONS, MANAGER CP NO. 8 DATE ISSUED: CPP R - 16 3/ 01-16-78 0FFICE OF ENG. DESIGN 8 CONST.

CP EXPIRATION DATE:

CORPORATE ADDRESS:

400 COMMERCE AVENUE APPLICANT:

TENNESSEE VALLEY AUTHORITY KNOXVILLE, TENNESSEE 37902 PLANT LOCATIDH 15 MI SW OF KINGSPORT, TENN IE REGION:

2 CORPORATE PHONE NO:

(61S) 632-2911 AE:

TENNESSEE VALLEY AUTHORITY 4

l NS$$8 GENERAL ELECTRIC CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY HRC LPM:

3 REACTOR TYPE:

BWR IE PROJECT INSPECTU.t DER (MWE):

1220 IE RESIDENT INSPECTOR:

INSPECTION 5 T A T U S:

FUEL L0AD DATE CHAHGE5 TIME PERIOD AS REP 0RTED BY UTILITY Apr, 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1EHEDMLE REPORTED BY UTILTTY HUMBER OF INSP.

OF INSP.

09-12-79 05-00-88 HD REASON STATED.

8201 04-20-82 04-23-82 09-10-80 07-00-93 NO REASON PROVIDED.

08-14-81 N/S DEFERRED.

Inspection reports are available at local PDRs.

1 L0 CAL PUBLIC D0CUMENT R 0 0 M:

KINGSPORT PUBLIC LIBRARY BROAD & NEW STREETS KINGSPORT, TENNESSEE 37660

1 C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-093 PHIPPS BEND 2 NUCL EAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCT ION 5TATUSt APPLICtNT'S CURRENT ESTTMATED FUEL LOADING DATE:

N/$

APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LGADING DATE:

07-00-93 DEFINED IN CPI (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

01-00-83 (LATEST)

APPLICANT'S CURRENT ESTIMATED CCf1MERCIAL OPERATION DATE: N/S g

CURCENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

5%

COMMENTS REGt.RDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START STARl_

$_0MPLETIJN COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

N/S PLACE STRUCTURAL CONCRETE:

INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LAEGE BORE PIPE NANGERS, RESTRAINTS AND SNU3BERS:

INSTALL SMALL BORE PIPE:

INSTALL CADLE TRAY:

INSTALL EXPOSED METAL CONDUIT:

INSTALL PO!!ER, CONTROL, INSTRUMENTATION AMD SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS:

CONDUCT REACTOR COLD HYDROSTATIC TEST:

COHLUCT NOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

C0N5TRUCTION STATUS REP 0RT PAGE HO 2-094 RIVER BEND 1 HUCLEAR POWER PLAHTS STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05000458 CORPORATE CONTACT:

J. E. BOOKER NHGR. - ENGR. 8 LIC.

CP NO. 8 DATE ISSUED: CPPR145 / 03-25-77 RIVER BEND HUCLEAR GROUP CP EXPIRATION DATE:

03-31-83 CORPORATE ADDRESS:

P. O. 30X 2951 APPLICANT:

GULF STATES UTILITIES BEAUMONT, TEXAS 77704 PLANT LOCATION:

24 MI NNW OF BATON ROUGE, LA IE REGION:

4 CORPORATE PHONE NO:

(713) 839-2181 AE:

STONE 8 WEBSTER NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

STONE 8 W?.BSTER NRC LPM:

UNASSIGNED REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

0934 IE RESIDENT INSPECTOR:

R. L. BROWN IHSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY:

Aor. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE

}_QJtLEDU( R Rff_0 R T ED__pl__U T I L IJ.1 NUMBER OF INSP.

OF INSP.

05-13-77 03-00-83 DENIAL OF RATE INCREASE COMBINED WITH 8202 04-19-82 04-23-82 REGULATORY AND CONSTRUCTION DELAYS.

8203 02-21-82 05-15-82 05-19-78 03-00-84 INABILITY 10 OBTAIH ADEQUATE RATE RELIEF.

8205 05-24-62 05-28-82 12-03-80 10-00-83 NO REASON PROVIDED.

11-10-81 04-00-85 FUNDING LIMITATIONS OF THE PROJECT.

Inspection reports are available at local PDRs.

2 L0 CAL PUBLIC DDCUMEHT R 0 0 M:

AUDUBON LIBRARY GOVERNMENT DOCUMENTS DEPT.

WEST FELICIANA BRANCH LOUISIANA STATE UNIVERSITY FERDINAND STREET BATON ROUGE, LOUISIANA 70803 ST. FRANCISVILLE, LA 70775 4

C0NSTRUCTION STATUS REPORT PAGE NO: 2-095 RIVER BEND 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCT ION

$TATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-00-35 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-83 DEFINED IN CP: (EARLIEST) 03-31-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-00-81 (LATEST) 03-31-83 APPLICANT'S CURRENT ESTIMATED Cot 1MERCIAL OPERATICN DATE: 12-00-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 52%

COMMENTS RECARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

__,11 ART START COMP ( U TJ ON C0!1PlFTTON *: C0!!P11J_g MOBILIZE AND PREPARE SITE:

04-08-79 04-08-79 10-31-84 91 PLACE STRUCTURAL CONCRETE:

03-20-79 08-20-79 10-23-83 75%

INSTALL REACTOR PRESSDRE VESSEL:

06-21-81 06-21-81 06-26-81 06-26-81 100%

INSTALL LARGE BORE PROCESS PIPE:

07-01-79 07-01-79 05-31-84 484

]

INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:

07-01-79 07-01-79 05-31-84 18%

INSTALL SMALL BORE PIPE:

08-01-30 08-01-80 10-16-84 3%

INSTALL CABLE TRAY:

04-23-81 04-23-81 11-01-83 28%

4 4

INSTALL EXPOSED METAL CONDUIT:

10-01-81 10-01-81 01-16-84 15%

i j

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

10-16-31 10-16-81 03-03-84 1%

INSTALL ELECTRICAL TERMINATIONS:

10-16-31 10-16-31 03-03-84 1%

CONDUCT REACTOR COLD HYDROSTATIC TEST 05-01-84 05-31-84 0%

CONDUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:

10-01-83 04-00-85 0%

i a

.._m C0HSTRUCT IOH

$TATUS REP 0RT PAGE HO: 2-096 RIVER BEND 2 HUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLANT CHARACTERI$ TICS:

KEY P E R S 0 N N E L:

COCKET NO:

0$0004S9 CORPORATE CONTACT:

J. E. BOOKER, MNGR.-ENGR 8 LIC.

CP NO. 8 DATE ISSUED: CPPR146 / 03-25-77 RIVER BEND HUCLEAR GROUP CP EXPIRATION DATE:

03-31-83 CORPORATE ADDRESS:

P. O.

BOX 2951 APPLICANT:

GULF STATES UTILITIES BEAUMONT, TEXAS 77704 PLANT LOCATION:

24 MI NNW OF BATCH ROUGE, LA IE PEGIDH:

4 CORPORATE PHONE NO:

(713) 839-2181 AE:

$10NE 8 WEBSTER NSSS:

GENERAL ELECTRIC CONSTRUCT 0k.

STONE 8 UEBSTER NRC LPM:

R. L. PERCH REACIOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (ttuE) :

0934 IE RESIDENT INSPECTOR:

A.

B. BEACH-INSPECT ION STATUS:

FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY U T I L I T Y:

Apr. 1982 - Jun. 198_2 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCUIDUlf REPORTED BY UTILITY NUMRfP OF INSP.

p1 TN3P.

05-19-78 INDEF.

INDEFINITE DELAY CONTINUES DUE TO FINANCIAL CONSIDERATIONS.

l In=pnction reports are available at local PDRs.

1 t

L0 CAL PUDL IC D0CUMENT R 0 0 M:

AUDU;JH LIDRARY GOVERNMENT DOCUMEt!!S DEPT.

WEST FELICIANA ERANCH LOUISIANA STATE 1:NIVERSITY FERDINAND STRFFT EATCH ROUGE, LOUISIANA 70803 St. FEAT:CISVILLE, LA 70775 I

4 C0NSTRUCTION 5TATUS OEPORT PAGE N08 2-097 RIVER DEND 2 NUCLEAR POWER PLA HTS STATUS AS OF 06-30-82 C0HSTRUCTION 5TA TUS j

APPLICANT'S CURREllT ESTIMATED FUEL LDADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS

)

APPLICANT'S PREVIOUS ESTIttATED FUEL LOADIffG D.'IC:

N/S DEFIHED IN CP: (EARLIEST) 03-31-83 APPLICANT'S ESTIt1ATED FUEL LOADING DATE AT CP ISSUANCE:

11 / S (LATEST) 03-31-85 APPLICAH1'S CUR:tEtli ESTIi1ATED C0". :ERCI AL OPERATI0li DATE: N/S CURREtti ESTIMATED PEPCENT CONSTRUCTION CCitPLETE:

17 COM: TENTS REGAPDING CURRENT CONSTRUCTIOf4 STATUS: INDEFINITE DELAY DUE TO FINANCIAL CONSIDERATIONS.

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11 ART _

COMPLETIQM COMPLETION % COMPLETE I

MODILIZE AND PREPARE SITE:

N/S PL ACE STRUCTURAL C0ttCRETE:

ItiST ALL REACTOR FRESSURE VESSEL:

1 ItiSTALL LARGE EORF PROCESS PIPE:

INSTALL LARCE DORE PIPE HAHOERS, RESTRAINTS APID SHUBBERS:

INSTALL SMALL DORE PIPE:

INSTALL CADLE TRAY:

r INSTALL EXPOSED ItETAL CONDUIT:

TitSTALL P0t!ER, CONTROL, ItiSTRUMENTATION AND SECURITY CABLE:

ItiST AL L ELECTRICAL T ERMit!ATIDHS:

CD:lDUCT REACTOR COLD HYDROSTATIC TEST C0tIDUCT H0i FUNCTIONAL TEST CONDUCT P.7EOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

1 1

C0NSTRUCTION 5TATUS REPQRT PAGE NO: 2-098 SAN ONOFRE 3 HUCLEAR POWER PLAHTS STATUS AS Ort 06-30-82 PLANT CHARACTERI$TICSt KEY P E R S 0 N N E Le DOCKET NO:

05000362 CORPORATE CONTACT:

DR. L.T. PAPAY, VICE PRESIDENT CP NO. & DATE ISSUED: CPPR-98 / 10-18-73 ADVANCED ENGINEERING CP EXPIRATION DATE:

06-01-81 CORPORATE ADDRESS:

2244 WALNUT GROVE AVENUE APPLICANT:

SOUTHERN CALIFORNIA EDISON ROSEMEAD, CALIFORNIA 91770 PLANT LOCATIDH:

5 MI S OF SAN CLEMENTE, CA IE REGION:

5 CORPORATE PHONE NO:

(213) 592-1472 AE BECHTEL NSSS:

COMBUSTION ENGINEERING CONSTRUCTOR:

BECHTEL NRC LPM:

H. ROOD REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1100 IE RESIDENT INSPECTOR:

R. J. PATE INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED EY UTTLTTY NUMB (g QF INSP.

OF INSP.

11-14-74 11-00-80 ISSUANCE OF A PERMIT BY THE CALIFORNIA 82-05 02-15-82 04-09-82 COAST AL C0f!11SSION.

82-06 03-31-82 04-05-82 12-12-74 03-09-81 NO REASON NOTED.

82-07 06-01-80 06-30-81 10-22-75 05-00-81 LABOR DIFFICULTIES.

82-08 04-19-82 04-23-82 02-00-80 11-00-81 NO REASON PROVIDED.

82-09 05-17-82 06-04-82 02-18-81 09-00-82 NO REASON PROVIDED.

82-10 04-10-82 05-24-82 09-30-81 11-01-82 NO REASON PROVIDED.

82-11 05-24-82 05-28-82 82-12 06-28-82 07-02-82 82-13 05-24-82 06-25-82 Inspection Reports are available at local PDRs.

I L0 CAL PUBLIC D0CUMENT R 0 0 M:

MISSION VIEJO BRANCH LIBRARY 24851 CHRISANTA DRIVE MISSION VIEJ0 CALIFORNIA 92676

C0HSTRUCTIOH STATUS REPQRT PAGE HO: 2-099 1

SAM CHOFRE 3 HUCLEAR POWER PLAHTS STATUS AS OF 06-30-82 C0N$TRUCTION S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

11-01-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING D%TE:

09-00-82 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-80 (LATEST) 03-02-83 APPLICAhi'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 08-16-83 i

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 87%

COMMENTS REGARDING CURRENT CONSTRUCTICH STATUS: HD UPDATE PROVIDED FOR THE SECOND QUARTER OF 1932.

5 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$T ARL SfMPLETLOH

,CO*jP,L E1J Q3 % COMPM lE MOBILIZE AND PREPARE SITE:

02-07-74 10-07-74 100%

PLACE STRUCTURAL COHCRETE:

11-24-74 06-16-75 100%

INSTALL REACTOR PRESSURE VESSEL:

12-19-77 12-23-77 100%

INSTALL LARGE BORE PROCESS PIPE:

04-01-77 12-00-81 99%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

09-01-77 03-00-82 96%

INSTALL SMALL BORE PIPE:

01-01-77 03-00-82 99%

INSTALL CABLE TRAY:

02-01-77 09-30-81 100%

INSTALL EXPOSED METAL CONDUIT:

06-01-77 04-00-82 99%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-15-78 05-00-82 92%

INSTALL ELECTRICAL TERMINATI0HS:

02-01-79 C6-00-82 84%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

03-10-82 03-23-82 0%

CONDUCT HOT FUNCTIONAL TEST:

06-04-82 07-28-82 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

03-01-81 10-15-82 0%

i w

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-100 SEABROOK 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLAHT CHARACTER ISTICSt KEY PERS0NNEL:

DOCKET NO:

05000443 CORPORATE CONTACT:

W. C. TALLMAN, CHIEF EXEC. OFFICER CP NO. 8 DATE ISSUED: CPPR-135/ 07-07-76 CP EXPIRATION DATE:

06-30-83 CORPORATE ADDRESS:

1000 ELM STREET APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE MANCHESTER, NEW HAMPSHIRE 03105 PLANT LOCATION:

10 MI 5 0F PORTSMOUTH. NH IE REGION:

1 CORPORATE PHONE NO:

(603) 669-4000 AE UNITED ENG. 8 CONSTRUCTORS NSSS:

WESTINGHOUSE CONSTRUCTOR:

UNITED ENG. 8 CONSTRUCTORS NRC :PM:

L. WHEELER REACTOR TYPE:

PUR IE PROJECT INSPECTOR:

DER (MWE):

1998 IE RESIDENT INSPECTOR:

A. C. CERNE INSPECT ION STATU5:

FUEL L0AD DA TE CHANGES 2

TIME PERIOD AS REPQRTED BY UTILITY Apr. 1982 - Jun. 1982 d

REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY

!!jlf*B13 0F INSP.

OF INSP.

09-06-77 09-01-82 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 82-04 05-04-82 06-18-82 APPROVAL OF ONCE THROUGH CIRCULATING 82-05 05-06-82 05-06-82 WATER SYSTEM $ SUBSEQ. NRC WITHDRAWAL OF 82-06 06-21-82 07-02-82 CONST PERMIT, 8 TIME REQ TO REMDBILIZE 11-08-78 01-01-83 SCHEDULE REEVALUATION.

04-04-81 11-30-83 SCHEDULE REEVALUATION.

Inspection Reports are availablo at local PDRs.

4 i

l 4

6 t

L0 CAL PUBLIC DDCUMENT R00M EXETER PUBLIC LIBRARY FRONT STREET EXETER, NEW HAMPSHIRE 03885 I

C0NST RUCT ION 5TATUS REPORT PAGE NO: 2-101 SEA 3 ROOK 1 NUCLEAR POWER PLANTS

, STATUS AS OF:

06-30-82 C0NS TRUCT ION S T A T U S:

APPLICANT'S CURRENT ESTIr1ATED FUEL LOADING DATE:

11-30-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

01-01-83 DEFINED IN CP (EARLIESTI 02-00-79 APPLICANT'S ESTIt1ATED FUEL LOADING DATE AT CP ISSUANCE:

08-01-81 (LATEST) 06-00-83 APPLIC ANT'S CURRENT ESTIf1ATED COMitERCI AL OPER ATION DATE: 02-28-34 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 69%

COMMENTS REGARDING CUREENT CCNSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iLAR1

,C Cf_1P_L EJJ 0J G ME E_U OJ M QM_PLETE MOBILIZE AND PREPARE SITE:

07-00-76 08-00-77 08-00-77 100%

PLACE STRUCTURAL CONCRETE:

09-00-77 08-00-83 90%

INSTALL REACTOR PRESSURE VESSEL:

05-00-81 05-00-81 100%

INSTALL LARGE DORE PROCESS PIPE:

10-00-79 09-00-83 53%

INSTALL LARGE BOP.E PIPE NANGERS RESTRAINTS AND SNUBBERS:

10-00-79 09-00-83 37%

INSTALL SMALL BORE PIPE:

09-00-80 09-00-83 15%

INSTALL CABLE TRAY:

09-00-79 12-00-82 65%

IN3 TALL EXPOSED METAL CONDUIT:

04-00-79 07-00-83 59%

INS T ALL P014ER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

05-00-81 07-00-83 32%

INSTALL ELEC1RICAL TERMINATIONS:

06-00-81 08-00-83 18%

CONDUCT REACTOR COLD N)DR0 STATIC TEST:

07-00-83 07-00-83 0%

CONDUCT NOT FUNCTIONAL TEST:

08-00-83 09-00-83 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUFL LOAD:

02-00-82 11-00-83 0%

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-102 SEABROOK 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

05000444 CORPORATE CONTACT:

W. C. TALLMAN, PRESIDENT CP NO. 8 DATE ISSUED: CPPR-136/ 07-07-76 CP FXPIRATION DATE:

10-31-84 CORPORATE ADDRESS:

1000 ELM STREET APPLICANT:

PUBLIC SERVICE OF MEW HAMPSHIRE MANCHESTER, NEW HAMPSHIRE 03105 PLANT LOCATION:

10 MI S OF PORTSMOUTH, NH IE REGION:

1 CORPORATE PHONE NO:

(603) 669-4000 AE UNITED EHG. 8 CONSTRUCTORS NSSS:

-cs:1NbHuuSE CONSTRUCTOR:

UNITED ENG. & CONSTRUCTORS HRC LPM:

L. WHEELER REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1198 IE RESIDENT INSPECTOR:

A. C. CERNE IN$PECTI0N S T A T U 5:

FUEL L0AD DATE CHANGE 5 TIME PERIOD AS REPQRTED 8Y UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATF 1CHEDUlf REPORTED BY UTILITY HUMBER OF INSP.

OF INSP.

i 82-04 05-04-82 06-18-82 09-01-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 09-06-77 i

APPROVAL OF ONCE THROUGH CIRCULATING l

82-05 05-06-82 05-06-82 WATER SYSTEF & SUBSEC. NRC WITHDRAWAL OF CCHST PERMI'., A TIf1E REQ TO REMOBILIZE 11-08-78 11-01-84 SCHEDULE REEVALUATION.

04-04-81 02-28-86 SCHEDULE RF. EVALUATION.

Inspectiot. Reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R 0 0 M:

EXETER PUBLIC LIBRARY FRONT STREET EXETER, NEW HAMPSHIRE 03883

C0NSTRUCTION 3TATUS REP 0RT PAGE NO: 2-103 d

SEABROOK 2 NUCLEAR P.0 W E R PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

02-28-86 APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-01-84 DEFINED IN CP: (EARLIEST) 01-00-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-83 (LATEST) 10-00-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-31-86 CURRENT ESTIMATED PERCENT ClISTRUCTION COMPLETE:

15%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

4 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

_ START COMPLETION S05tL ETJ 03 7._.C 0t1P L E T E MOBILIZE AND PREPARE SITE:

07-00-76 08-00-77 100%

PLACE STRUCTURAL CONCRETE:

08-00-81

'., - 0 0 -8 5 33%

INSTALL REACTOR PRESSURE VESSkt 08-00-83 09-00-83 0%

INSTALL LARGE BORE PROCESS PIPE:

01-00-83 02-00-86 0%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

01-00-83 02-00-86 0%

INSTALL SMALL BORE PIPE:

12-00-83 02-00-86 0%

INSTALL CABLE TRAY:

06-00-83 04-00-85 0%

INSTALL EXPOSED METAL CONDUIT:

01-00-83 07-00-85 0%

INSTALL POWER, COHTROL, INSTRUMENTATION AND SECURITY CABLE:

~

10-00-83 G7-00-85 0%

INSTALL ELECTRICAL TERMINATIONS:

11-00-83 08-00-85 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

10-00-85 10-00-85 0%-

CONDUCT HOT FUNCTIONAL TEST 12-00-85 01-00-86 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

05-00-84 02-00-86 0%

4 4

C0NSTRUCTION STATUS REPORT PAGE NO: 2-104 SHOREHAM NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 g

~

f 1

, PLANT C-H A P A C T E R I S T ICS KEY P E R S 0 N N E L:

$0f;KET NO:

CPPR-95 / 04-14-73 Os000322 CORPORATE CONTACT:

M. S. POLLOCK, VICE PRESIDENT CP NO. 8 DATE ISSUED:

s CP FWTf.. TION DATE:

03-31-83 CORPORATE ADDRESS:

175 EAST OLD COUNiRY ROAD '

A PP L'I C AMT :

LONG ISLAND LIGHTING CO.

HICKSVILLE, NEW YORK 11801 PLANT LOCATION:

BROOKHAVEH, NY (LI) s IE REGION:

I i

CORPORATE PHONE NO:

(516) 733-4013 AE:

STONE C. WEBSTER NSSS:

GCHERAL ELECTRIC,

,t

}

CONSTRUCTOR:

STONE'S WEBSTER NRC LPM:

R. GILBERT 7

[

REACTOR TYPE:

'BWR IE PROJECT INSPECTOR:

L. HARROW s

DER (t1WE):

0854 IE RESIDENT INSPECTOR:

J. C. HIGGINS s

INSPECT I0H STATUSt FUEL L0AD~DA TE CHANGES

\\

f

. TIME PERIOD AS R E P O R T E D (B r U.7 I L I T Y:

Apr. 4932 - Jun. 1982 p,.

etEPORT NL14 REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTID BY UTILITY ILUEB_E_R OF INSP.

OF INSP.

/

t' 82-09 04-25-82 04-29-82 f s 02-20-74 12-00-77

1. CHANGE IN AEC SEISMIC 8 PIPE BREAlt, v.'

T CRITERIA RESULTED IN 2 MONTNS 82-10 04-26-82 04-29-82 ADDITIONAL EFFORT IN THE INSTALLATION ss 82-11 05-11-82 05-20-82 0F PRIMARY CONTAINMENT 8 PRV PEDESTAL.

i 82-12 05-18-82 05-21-82

2. DIFFICULTIES ENCOUNTERED DURING CON-82-13 05-11-82 05-18-82 STRUCTION OF PRIMARY CONTAINMENT WALL i

82-15 06-19-82 07-31-82 8 FPV PEDESTAL AND IMBEDMENT FOR PIPE 1

82-16 05-24-82 05-28-32 BklAK INSIi4E CONTAINMENT.

82-17 06-01-82 06-04-82 11-10-75 12-69-78 1 LABOR STRlf,ES, UNAVAILABILITY OF MATERIAi, WEATHER 8 CONSTRUCTION 4

DIFFICULTIES HAVE RESULTED IN A 12

/

MONTH DELAY.

Inspection Reports are available at local PDRs.

09-21-77 03-00-80 1.

LA!E GELIVERY OF PURCHASED MATERIAL (PIPING AND VALVES).

2. LOME? THAN EXPECTED LABOK) PRODUCTIVITY 3.

DESIGN CHANGES DUE TO REGJ REQUIREMENTS 01-10-79 06-00-80 MANPOWER CarlSTRAINTS AN!) DESIGN-

^

PROCUREf1ENT PROBLEMS.

l 3

02-00-80 11-00-80 NO REASON PROVIDED.

/

4 1

06-19-80 05-00-82 DELAY DUE TO C0f1PLETION OF SYSTEMS.

s 4

't f'

06-09-81 09-00-82 DELAY DUE TO COMPLET10N OF SYSTEMS.

s s

L' 0 'c A L '

P'- U B L,I Ci-D 0, C U M E'N T R 0 0 M:

/

s SHOREHAM-W,GING RIVER PUBLIC : tIDR ARY,'

3 ROUTE 25A

'a SHOR Ell A f t, t'EW YORK 11786 3 s i

i\\

\\

y'

< 1

. /

r %

/.

e e

A ts.

yg g

1

+

h

_. A.

._...-._..w_.-__L____-___.__-.-

A

C0NSTRUCT ION STATUS REPORT PAGE NO 2-105 SHOREHAM NUCLEAR POWER PLANTS

. STATUS AS OF 06-30-82 C0NSTRUCT ION STATUS:

APPLICANT'S CURRENT ESTIt1ATED FUEL LOADING DATE:

09-20-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMAT5 AS APPLICANT'S PREVIOUS ESTIMATED T UEL LOADING DATE:

05-00-82 DEFINED IN CP: (EARLIEST)

~

APPLICANT'S FSTIttATED FUEL LOADING DATE AT CP ISSUANCE:

03-00-77 (LATEST) 09-00-82 APPLICANT'S CURRENT ESTIrlATED COMMERCIAL OPERATION DATE: 03-31-83 CURRENT ESTIMATED PERCENT C0tl3TRUCTION COMPLETE: 93%

CGMMEtiTS REGARDING CURRENT CONSIRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

__ START 11 ART _

COMPLETION SQMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

11-00-72 03-00-73 100%

PLACE STRUCTURAL CONCRETE:

03-00-73 12-00-77 100%

INSTALL REACTOR PRESSURE VESSEL:

03-00-75 12-00-75 100%

INSTALL LARGE BORE PROCESS PIPE:

05-00-75 10-00-79 100%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

07-00-75 09-00-82 94%

INSTALL SMALL BORE PIPE:

05-00-75 09-00-82 96%

INSTALL CABLE TRAY:

02-00-76 09-00-82 99%

INSTALL EXPOSED METAL CONDUIT:

02-90-76 09-00-82 97%

INSTALL POWER, C0 fit R O L, INSTRUMENTATION AND SECURITY CABLE:

06-00-76 09-00-82 96%

INS 1ALL ELECTRICAL TERMINATIONS:

06-00-76 09-00-82 94%

CONDUCT REACTOR COLD HYDROSTATIC TEST 10-00-79 10-00-79 10-00-79 100%

CONDUCT NOT FUNCTIONAL TEST:

N/A K/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

01-00-80 09-00-82 63%

C0NSTRUCTION STATUS REPORT PAGE NO: 2-106 i

SOUTH TEXAS 1 NUCLEAR POWER PLANT $

STATUS AS OF 06-30-82 PLAMT CHARACTERISTICS:

K E Y.

P E R S O M M E L:

4 DOCKET NO:

05000498 CORPORATE CONTACT:

J. H. GOLDBERG, VICE PRESIDENT CP MO. 8 DATE ISSUED: CPPR-128/ 12-22-75 HUCLEAR ENGINEERING 8 CONSTRUCTION i

CP EXPIRATIDM DATE:

05-31-82 CORPORATE ADDRESS:

P. O. BOX 1700 APPLICANT:

HOUSTON LIGHTING 8 POWER COMPANY HOUSTON, TEXAS 77001 i

PLANT LOCATION:

12 MI SSW OF BAY CITY, TEX.

IE REGIDH 4

CORPORATE PHONE NO:

(713) 486-3828 i

AE BECHTEL NSSS:

WESTINGHOUSE 4

CONSTRUCTOR:

EBASCO NRC LPM:

D. SELLS REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

i DER (MWE):

1250 IE RESIDENT INSPECTOR:

W. HILL i

INSPECTION S T A T U S:

FUEL L0AD DATE CHANGES i

TIME PERIOD A5 REPORTED BY UTILITY Aor. 1982 - Jun. 198R REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

10-30-78 11-00-81 SCHEDULE REEVALUATION.

8205 03-30-82 04-02-82 01-18-80 09-00-83 SCHEDULE REEVALUATION.

J 8206 04-12-82 04-23-82 08-05-82 12-00-86 CHANGE IN A/E AND CONSTRUCTOR.

8207 04-08-82 04-08-82 8208 04-08-82 04-30-82 8209 05-01-82 05-31-82 Inspection reports are available at local PDRs.

I i

l i

i L0 CAL PUBLIC D0CUMENT R 0 0 Mt 1

MATAGORDA COUNTY LAW LIBRARY i

P. O. BOX 487 BAY CITY, TEXAS 77414 i

C0NSTRUCTION STATUS REPORT PAGE NO: 8-107 SOUTH TEXAS 1 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION S T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS A*PLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

09-01-83 DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-01-80 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 45%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NA NOT AVAILABLE.

ESTIMATED ACTUAL ZSTIMATED ACTUAL ESTIMATED START

$1A R_ T_.

COMPLETION LOPE E LOJ LCOMPL E T E MOBILIZE AND PREPARE SITE:

09-00-75 12-00-75 100%

PLACE STRUCTURAL CONCRETE:

04-00-76 04-00-85 NA INSTALL REACTOR PRESSURE VESSEL:

09-00-79 09-00-79 100%

INSTALL LARGE BORE PROCESS PIPE:

10-00-78 06-00-86 NA INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:

10-00-78 06-00-86 NA j

INSTALL SMALL BORE PIPE:

10-00-78 06-00-86 NA 5

INSTALL CABLE TRAY:

10-00-78 07-00-85 NA INSTALL EXPOSED METAL CONDUIT:

07-00-78 07-00-85 NA INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

09-00-83 10-00-86 NA INSTALL ELECTRICAL TERMINATIONS:

09-00-83 10-00-86 NA CONDUCT REACTOR COLD HYDROSTATIC TEST:

06-03-86 08-00-86 NA CONDUCT HOT FUNCTIONAL TEST 09-00-86 12-00-86 NA CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

12-00-84 12-00-86 NA i

1 1

i l

CDNSTRUCTION STATUS REPORT PAGE NO: 2-108 SOUTH TEXAS 2 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLAHT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO 05000499 CORPORATE CONTACT:

J. H. GOLDBERG, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-129/ 12-22-75 NUCLEAR ENGINEERING 4 CONSTRUCTION CP EX"IPrTION DATE:

10-31-83 CORPORATE ADDRESS:

P. O.

BOX 1700 APPLitAhir HOUSTON LIGHTING 8 POWER COMPANY HOUSTON, TEXAS 77001 PLANT LOCATION:

12 MI SSW Or BAY CITY, TEX i

IE REGION:

4 CORPORATE PHONE NO:

(713) 486-3828 AE BECHTEL NSSS:

WESTINGHOUSE CONSTRUCTOR:

EBASCO NRC LPM:

D. SELLS

}

REACTOR TrPE:

PWR IE PROJECT INSPECTOR:

DER U:WE):

1250 IE RESIDENT IHSPECTOR:

W. HILL I N S P E C T I O ti STATU5:

FUCL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Aor. 19R2 - Jun. 1982

?

REPORT NEW REASON FOR CHANGE i

REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED BY UTILITY HMMQCS OF INSP.

OF INSP.

10-30-78 11-00-82 SCHEDULE REEVALUATION.

8205 03-30-82 04-02-82 01-18-80 09-00-85 SCHEDULE REEVALUATION.

8206 04-12-82 04-23-82 08-05-82 12-00-88 CHANGE IN A/E AND CONSTRUCTOR.

3207 04-03-82 04-08-82 8208 04-01-82 04-30-82 8209 05-01-82 05-31-82 d

Inspection reports are available at local PDRs.

i-j 4

1 1

i l

i l

L0 CAL PUSLIC D0CUMENT R 0 0 Ms MATACCRDA COUNTY LAW LIBRARY P. O. BOX 481 DAY CITY, TEXAS 77414 1

1 C0NSTRUCTION STATUS REPQRT PAGE HO: 2-109 SOUTH TEXAS 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0N$TRUCTION 5 T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-00-88 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

09-01-8S DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-81 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-00-89 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

18%

4 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: N/A : NOT AVAILABLE.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iTARI_

COMPLETTaH COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

09-00-75 12-00-75 100%

PLACE STRUCTURAL CONCRETE:

03-00-77 03-00-87 NA INSTALL REACTOR PRESSURE VESSEL:

05-00-84 09-00-84 NA INSTALL LARGE BORE PROCESS PIPE:

07-00-83 06-00-88 HA INSTALL LARGE DORE PIPE HANGERS, REETRAINTS AND SHUBBERS:

07-00-83 06-00-88 HA INSTALL SMALL BORE PIPE:

10-00-83 06-00-88 MA INSTALL CABLE TRAY:

07-00-83 01-00-87 NA INSTALL EXPOSED METAL CONDUIT:

07-00-83 01-00-87 NA INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:

12-00-85 08-00-88 HA INSTALL ELECTRICAL TERMINATIONS:

12-00-85 10-00-88 HA CONDUCT REACTOR COLD HYDROSTATIC TEST 06-00-88 08-00-88 NA CONDUCT HOT FUNCTIONAL TEST 09-00-88 12-00-88 HA CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-00-86 12-00-88 HA

.~-

~

I C0NSTRUCe ION STATUS REPQRT PAGE NO: 2-110 l

ST LUCIE 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82

}

.P L A N T CNARACTERI$TICSt KEY PERS0NNELa DOCKET NO:

05000389 CORPORATE CONTACT:

R. E. UHRIG, VICE PRESIDENT l

CP NO. 8 DATE ISSUED: CPPR-144/ 05-02-77 NUCLEAR AFFAIRS CP EXPIRATION DATE:

CORPORATE ADDRESS:

P. O. BOX 529100 APPLICANT:

FLORIDA POWER 8 LIGHT MI At1I, FLORIDA 33152 i

PLANT LOCATION:

12 MI SE OF FT. PIERCE FLA IE REGION:

2 CORPORATE PHONE NO:

(305) 552-3842 AE EBASCO NS$$2 COMBUSTION ENGINEERING CONSTRUCTOR:

EBASCO NRC LPM:

V. HERSES

~'

REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

0842 IE RESIDENT INSPECTOR:

S. A. ELROD 4

INSPECTION 5TATUS:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED 5Y U T I L.I T Yr Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE ENr DATE DATE SCHEDSLE RFPORTED BY UTILlly NUMBER OF INSP.

OF INSP.

03-24-77 06-00-83 1 LWA HALTED BY COURT ORDER.

8215 04-12-82 04-16-82

2. CP WAS ANTICIPATED 03-01-75 DUT 8216 04-19-82 04-23-82 EARLIEST ANTICIPATED DATE 06-01-77.

i 8217 04-19-82 04-23-82 03-01-78 10-28-82 1 PROJECT AUTHORIZED TO USE TWO SHIFTS.

8218 04-26-82 04-30-82 1

8219 04-26-82 04-30-82 I

8220 05-11-82 05-14-82 8221 04-11-82 05-14-82 8222 05-10-82 05-13-82 i

8223 05-25-82 05-28-82 8224 05-25-82 05-28-82 Inspection reports are available at local PDRs.

4

[

1

]

L0 CAL PUBLIC D0CUMENT R00M INDIAN RIVER JUNIOR COLLEGE LIBRARY 3209 VIRGINIA AVENUE FT. PIERCE, FLORIDA 33450 4

4 j

1 1

i

i C0NSTRUCTION 5TATUS REP 0RT PAGE NO: 2-111 ST LUCIE 2 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 CDHSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATCD FUEL LOADING DATE:

10-28-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-83 DEFINED IN CP: (EARLIEST) 05-13-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-13-83 (LATEST) 05-13-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-13-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 87%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIf1ATED ACTUAL ESTIttATED ACTUAL ESTIMATED

__11 ART SJART COMPLFTION COME ED ON 3_qpLti QE m

MOBILIZE AND PREPARE SITE:

05-02-77 05-C2-77 07-00-77 01-00-77 100%

PL ACE STRUCTURAL CONGRETE:

07-06-77 07-07-77 10-05-81 09-18-88 100%

INSTALL REACTOR PRESSURE VESSEL:

06-18-30 06-22-80 12-21-81 12-06-81 100%

INSTALL LARGE BORE PROCESS PIPE:

09-00-78 10-00-78 12-30-82 97%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

09-00-78 11-00-78 12-30-82 81%

INSTALL SMALL BORE PIPE:

10-00-78 11-00-78 12-30-82 91%

INSTALL CABLE Yp4v.

10-30-78 02-00-79 05-30-82 06-28-82 100%

INSTALL EXPOSED METAL CONDUIT:

01-05-79 02 00-79 11-30-82 95%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-30-79 05-00-79 11-30-82 81%

INSTALL ELECTRICAL TERMI;UTIONS:

05-00-79 08-00-79 12-30-82 58%

CONDUCT REACTOR COLD NYDR0 STATIC TESin 03-17-82 05-19-82 C4-28-82 05-26-82 100%

CONDUCT NOT FUNCTIONAL TEST:

09-25-82

  • 1-03-82 0%

CONbUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

04-20-80 03-19-80 91-19-83 54%

1 t

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-112 SUMMER 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTER ISTIC5:

KEY PERSONNELa DOCKET NO:

05000395 CORPORATE CONTACT:

E. N. CREWS, JR., SR. VICE PRES.

CP NO. 8 DATE ISSUED:

CPPR-94 / 03-21-73 CONST. 8 PROD. ENGINEERING CP EXPIRATION DATE:

01-01-78 CORPORATE ADDRESS:

P. O. BOX 764 APPLICANT:

SOUTH CAROLINA ELECTRIC 4 GAS CO.

COLUMBIA, SOUTH CAROLINA 29218 PLANT LOCATION:

26 MI NW OF COLUMBIA, SC IE REGION:

2 CORPORATE PHONE NO:

(803) 748-3268 AE:

GILBERf ASSOCIATES NSSS:

WESTINGHOUSE CONSTRUCTOR:

DANIEL INTERNATIONAL NRC LPM:

W. KANE REACTOR TYPE-PWR IE PROJECT INSPECTOR:

DER (MWE):

0900 IE RESIDENT INSPECTOR:

J. SK0LDS INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITY:

1 l

Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE SCHEDULE REPORTED BY UTILITY UUMBER OF INSP.

OF INSP.

11-12-74 11-01-78 POWER NEEDS DEFERRED; FINANCIAL 8229 04-01-82 04-30-82 DETERMENTS.

8231 05-01-82 05-31-82 01-07-77 11-30-79 NO REASON GIVEN.

8232 05-06-82 05-07-82 11-07-78 07-01-80 NO REASON GIVEN.

n233 05-04-82 05-06-82 01-31-80 12-01-80 HD REASON GIVEN.

8234 05-17-82 05-21-82 01-31-80 12-01-80 NO REASON GIVEN.

8235 05-10-82 05-14-82 05-05-80 01-03-80 NO REASON GIVEN.

C236 06-01-82 06-17-82 08-00-80 06-00-81 NO REASON GIVEN.

8237 06-07-82 06-09-82 01-16-81 08-00-81 NO REASON PROVIDED.

8240 06-08-82 06-11-82 11-25-81 02-00-82 NO REASON PROVIDED.

04-30-82 05-00-82 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

07-31-82 08-00-82 NO REASON PROVIDED.

I l

L0CA L PUBL IC D0CUMENT R 0 0 M:

RICHLAND COUNTY PUBLIC LIBRARY 1400 SUMTER STREET COLUT1BIA, SOUTH CAROLINA 29201

C0NSTRUCTION STATUS REP 0RT PAGE HG: 2-113 SUMMER 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0N$TRUCT ION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

08-00-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

05-00-82 DEFINED IN CP (EARLIEST)

APPLICANT'S ESTIMATED FUEL LDADING DATE AT CP ISSUANCE:

10-01-77 (LATEST)

APPLICANT'S CURRENT ESTIf1ATED COM;1ERCI AL OPERATION DATE: 1983 1

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 994 COM? TENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS AS OF 07-31-82.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START SIARI_

COMPLETION COMPLETION 3_SOMPLETE MOSILIZE AND PREPARE SITE:

04-00-73 02-00-74 100%

PLACE STRUCTURAL CONCRETE:

03-00-74 02-00-82 03-15-82 100%

INSTALL REACTOR PRESSURE VESSEL:

09-00-77 11-00-77 100%

INSTALL LARGE BORE PROCESS PIPE:

01-00-77 02-00-82 02-01-82 100%

INSTALL LARGE DORE PIPE HANGERS RESTRAINTS AND SHUBBERS 03-00-77 08-15-82 99%

INSTALL SMALL BORE PIPE:

01-00-77 02-00-82 03-31-82 100%

1 INSTALL CABLE TRAY:

02-00-77 02-00-82 02-15-82 100%

INSTALL EXPOSED METAL CONDUIT:

01-00-76 08-15-82 99%

INSTALL POWER, CONTROL. THSTRUMENTATION AND SECURITY CABLE::

09-00-77 08-15-82 99%

INSTALL ELECTRICAL TERMINATIONS:

11-00-77 08-15-82 99%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

11-01-79 11-09-79 100%

CONDUCT HOT FUNCTIONAL TEST:

08-00-80 09-00-80 100%

CONDUCT PRFOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

06-00-78 08-01-82 99%

l i

D

C0NSTRUCTION STATUS REP 0RT PAGE ND: 2-114

$USQUEHANNA 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:

05000387 CORPORATE CONTACT:

H. W. CURTIS, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-101/ 11-02-73 ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:

03-01-81 CORPORATE ADDRESS:

901 HAMILTON STREET APPLICANT:

PENNSYLVANIA POWER 8 LIGHT ALLENTCWN, PENNSYLVANIA 18101 PLANT LOCATION:

7 MI NE OF BERWICK, PA IE REGIDH 1

CORPORATE PHONE NO:

(215) 770-5381 AE BECHTEL NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BECHTEL NRC LPM:

R. PERCH REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

1052 IE RESIDENT INSPECTOR:

G. G. RHOADS INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILI1 Ye Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE R.EPORTED J0LVJ't ITY NUMBER Or INSP.

OF INSP.

09-10-74 05-01-80 REVISED L0f.3 FORECESTS FOR THE 1980'S.

82-11 04-08-82 05-17-82 12-31-79 04-09-81 NO REASON;PROVIDED.

82-13 04-06-82 04-07-82 10-30-80 06-01-81 NO REASuh rROVIDED.'

82-14 04-12-82 04-14-82 09-30-81 04-15-82 NO REASON PROVIDED.

82-15 05-04-82 05-06-82 12-31-81 07-01-82 NO REASON PROVIDED.

82-16 05-12-82 05-24-82 06-30-82 07-15-82 NO REASON PROVIDED.

82-17 05-18-82 06-15-82 82-18 05-25-82 06-11-82 82-19 06-16-82 07-27-82 82-20 06-14-82 06-18-82 Inspection Reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R00M OSTERHOUT FREE LIBRARY 71 SOUTH FRANKLIN STREET WILKES-BARRE, PENNSYLVANIA 18701

C0NSTRUCTION STATUS REPQRT PAGE NO: 2-115

$USQUEHANNA 1 NUCLEAR POWFR PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

07-15-82 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-01-82 DEFINED IN CP (EARLIEST) 05-01-79 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-01-79 (LATEST) 12-31-82 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 05-15-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 97%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iT ARL COMPLFTION Gr*2LFJJON U pMPLETE MOBILIZE AND PREPARE SITE:

11-00-73 03-00-74 100%

PLACE STRUCTURAL CONCRETE:

09-00-74 08-00-78 100%

INSTALL REACTOR PRESSURE VESSEL:

02-00-76 10-00-76 100%

INSTALL LARGE BORE PROCESS PIPE:

08-00-74 03-00-82 04-00-82 100%

INSTALL LARGE BORE PIPE HANGERS RESTRAINTS AND SNUBBERS:

08-00-75 05-00-82 06-00-82 100%

INSTALL SMALL BORE PIPE:

08-00-75 03-00-82 04-00-82 100%

INSTALL CABLE TRAY:

09-00-75 03-00-82 04-00-82 100%

INSTALL EXPOSED METAL CONDUIT 04-00-76 03-00-82 04-00-82 100%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-00-78 03-00-82 04-00-82 100%

INSTALL ELECTRICAL TERMINATIONS:

01-00-78 07-00-82 98%

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

12-00-78 10-00-80 100%

CONDUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-00-79 07-00-82 98%

1

C0NSTRUCTION STATUS REPQRT PATE NO: 2-116 SUSQUEHANNA 2 NUCLEAR P0WER PLANT 5 STATUS AS OF 06-30-82 PLAHT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000388 CORPORATE CONTACT:

N. W. CURTIS, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-102/ 11-02-73 ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:

09-01-82 CORPORATE ADDRESS:

2 NORTH NINETH STREET APPLICANT:

PENNSYLVANIA POWER 8 LIGHT ALLENTOWN, PENNSYLVANIA 18101 PLANT LOCATION:

7 MI HE OF BERWICK, PA IE REGION:

1 CORPORATE PHONE NO:

(215) 770-5381 AE:

BECHTEL NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BECHTEL NRC LPM R. PERCH REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

1052 IE RESIDENT INSPECTOR:

G. G. RHOADS INSPECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITYa Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-10-74 11-01-81 REVISED LOAD FORECASTS FOR THE 1980'S.

82-04 04-08-82 05-17-82 02-00-80 04-00-82 NO REASON PROVIDED.

82-06 05-04-82 05-06-82 10-30-80 11-00-82 HD REASON PROVIDED.

82-07 05-18-82 06-15-82 09-30-81 07-00-83 NO REASON PROVIDED.

82-08 06-16-82 07-27-82 12-31-81 01-01-84 NO REASON PROVIDED, Inspection Reports are available at local PDRs.

L0 CAL PUBLIC D0CUMENT R00M OSTERHOUT FREE LIBRARY 71 SOUTH FRANKLIN STREET WILKES-BARRE, PENNSYLVANIA 18701

C0HSTRUCTION STATUS REPORT PAGE NO: 2-117 SUSQUENANNA 2 HUCLEAR POWER PLAHTS STATUS AS OF:

06-30-82 C0NSTRUCTIOH STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:

01-00-84 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-1S-83 DEFINED IN CP: (EARLIEST) 11-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-01-80 (LATEST) 03-31-84

~

APPLIwANe'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE: 11-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 68%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

11-00-73 07-00-74 100%

PLACE STRUCTURAL CONCRETE:

10-00-74 09-00-78 100%

INSTALL REACTOR PRESSURE VESSEL:

12-00-76 07-00-77 100%

INSTALL LARGE BORE PROCESS PIPE:

04-00-82 04-00-82 06-00-82 100%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

08-00-77 07-00-83 70%

f INSTALL SMALL BORE PIPE:

09-00-75 12-00-82 91%

INSTALL CABLE TRAY:

04-00-77 03-00-82 04-00-82 100%

INSTALL EXPOSED METAL CONDUIT:

07-00-75 03-00-83 84%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

04-00-79 06-00-83 97%

INSTALL ELECTRICAL TERMINATIONS:

10-00-79 07-00-83 77%

CONDUCT REACTOR COLD HYER0 STATIC TEST:

06-00-80 03-00-83 0%

CONDUCT NOT FUNCTIONAL T2ST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

10-00-83 0%

C0NSTRUCTION STATUS REP 0RT PAGE HO: 2-118 UCCt6E 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 PLAHT CHARACTERISTICSt KEY PERS0NNELa DOCKET NO:

05000424 CORPORATE CONTACT:

D.

E. DUTTON. VICE PRESIDENT CP HO. 8 DATE ISSUED: CPPR-108/ 06-28-74 GENERATING PLANT PROJECTS CP EXPIRATION DATE:

04-30-81 CORPORATE ADDRESS:

GEORGIA POWER COMPANY APPLICANT:

GEORGIA POWER 333 PIEDMONT PLANT LOCATIDH 25 MI SSE OF AUGUSTA, GA ATLANTA. GEORGIA 30302 IE REGION:

2 CORPORATE PHONE NO:

(404) 522-6060 AE SOUTHERN SERVICES 8 BECHTEL NSSS:

WESTINGHOUSE CONSTRUCTOR:

GEORGIA POWER CD.

NRC LPM:

J. GRANT REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1100 IE RESIDENT INSPECTOR:

W. F. SANDERS INSPECTIDH STATUS:

FUEL LOAD DATE CHAHGES 1

TIME PERIOD AS REPORTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-27-74 HOT KNOWN CONSTRUCTION SUSPENDED FOR FINANCIAL 8208 04-27-82 04-30-82 REASONS.

8209 04-27-82 04-30-82 05-11-77 05-00-83 NO REASON GIVEN.

8210 05-11-82 05-14-82 01-09-78 05-01-84 nVERESTIMATED PROJECTED NEED FOR POWER.

8211 04-10-82 05-10-82 07-17-80 11-00-84 NO REASON PROVIDED.

8212 05-25-82 05-27-82 11-18-81 09-01-86 SCHEDULE REASSESSMENT.

8213 05-24-82 05-28-82 8215 05-11-82 06-10-82 Inspection reports are available at local PDRs.

1 L0 CAL PUBLIC DDCUMEHT R00M I

BURKE COUNTY LIBRARY 4TH STREET WAYNESBORD, GEORGIA 30830 a

i C0NSTRUCTIDH STATUS REPORT PAGE NO: 2-119 V0GTLE 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

09-01-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-84 DEFINED IN CP: (EARLIEST) 04-01-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUAHCE:

10-01-79 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-01-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 35%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

_SlARJ_

COMPLF1IO3 EQttRETLQH 3_C0_MPLETE MOBILIZE AND PREPARE SITE:

08-01-76 09-15-77 100%

PLACE STRUCTURAL CONCRETE:

08-01-78 02-15-84 64%

INSTALL REACTOR PRESSURE VESSEL:

02-01-83 03-15-83 0%

INSTALL LARGE BORE PRQCESS PIPE:

09-01-80 05-01-86 16%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

09-01-80 05-01-86 4%

INSTALL SMALL BORE PIPE:

07-01-81 05-01-86 2%

INSTALL CABLE TRAY:

08-01-80 04-01-85 23%

INSTALL EXPOSED METAL CONDUIT:

11-01-81 01-01-86 3%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

03-0.-83 11-01-85 0%

INSTALL ELECTRICAL TERMINATIONS:

05-01-83 01-01-86 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

33-01-86 04-01-86 0%

l CONDUCT HOT FUNCTIONAL TEST:

05-15-86 07-15-86 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LDAD:

07-24-84 08-01-86 0%

1

C0NSTRUCTION STATUS REP 0RT PAGE NG2 2-120 V0GTLE 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000425 CORPORATE CONTACT:

D. E. DUTTON, VICE PRESENT CP HO. 8 DATE ISSUED: CPPR-109/ 06-28-74 GENERATING PLANT PROJECTS CP EXPIRATION DATE:

04-30-82 CORPORATE ADDRESS:

GEORGIA POWER COMPANY APPLICANT:

GEORGIA POWER 333 PIEDMONT PLANT LOCATION:

25 MI SSE OF AUGUSTA, GA ATLANTA, GEORGIA 30302 IE REGION:

2 CORPORATE PHONE HO:

(404) 520-6060 AE SOUTHERN SERVICES 8 BECHTEL NSSS:

WESTINGHOUSE CONSTRUCTOR:

GEORGIA POWER CO.

NRC LPM:

J. GRANT REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1100 IE RESIDENT INSPECTOR:

W. F. SANDERS INSPECTION S T A T U 5:

FUEL L0AD DATE CHANGE 5 TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-27-74 NOT KNOWN CONSTRUCTIDH SUSPENDED FOR FINANCIAL 8208 04-27-82 04-30-82 REASONS.

8209 04-27-82 04-30-82 05-11-77 05-00-84 HD REASON GIVEN.

8210 05-11-82 05-14-82 11-02-77 05-03-85 OVERESTIMATED PROJECTED NEED FOR POWER.

8211 04-10-82 05-10-82 07-17-80 05-00-87 HO REASON PROVIDED.

8212 05-25-82 05-27-82 11-18-81 03-01-88 SCHEDULE REASSESSMENT.

8213 05-24-82 05-28-82 1

8215 05-11-82 06-10-82 Inspection reports are available at local PDRs.

L0 CAL " 'u BLIC D0CUMENT R 0 0 Mt BURKE COUNTY LIBRARY 4TH STREET WAYNESBORO, GEORGIA 30830

i C0HSTRUCTION 5TATUS REPORT PAGE HO: 2-121 V0GTLE 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCT ION

$ T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:

03-01-88 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

05-00-87 DEFINED IN CP (EARLIEST) 04-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-80 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 09-01-88 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

11%

COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START LTARI_

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

08-01-76 09-15-77 100%

PLACE STRUCTURAL CONCRETE:

08-01-78 08-15-84 41%

INSTALL REACTOR PRESSURE VESSEL:

08-01-84 09-15-84 0%

INSTALL LARGE BORE PROCESS PIPE:

09-01-80 11-01-87 11%

INSTALL LARGE BORE PIPE HANGERS RESTRAINTS AND SNUBBERS:

09-01-80 11-01-87 1%

INSTALL SMALL BORE PIPE:

02-01-83 04-01-88 1%

INSTALL CABLE TRAY:

08-01-80 10-01-86 6%

INSTALL EXPOSED METAL CONDUII:

03-01-83 07-08-87 0%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

09-01-84 05-08-87 0%

INSTALL ELECTRICAL TERMINATIONS 11-01-84 07-01-87 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST 09-01-87 10-01-87 0%

CONDUCT HOT FUNCTIONAL TEST:

12-15-87 02-15-88 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

01-24-86 02-01-88 0%

4 a

C0N5TRUCTION STA fUS REPORT PAGE NO: 2-122 WASHINGTON NUCLEAR t MUCLEAR POWER PLANT $

STATUS AS OF 06 30-82 PLANT CHARACTERI$TICSt KEY P E R S O N N E L:

DOCKET NO 05000460 CORPORATE CONTACT:

R. L. FERGUSON, MANAGING DIRECTOR CP NO. 8 DATE ISSUED: CPPR-134/ 12-24-75 CP EXPIRATION DATE:

01-01-82 CORPORATE ADDRESS:

P. O. BOX 968 APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM RICHLAND. WASHINGTON 99352 PLANT LOCATION:

10 MI N OF RICHLAND, WA IE REGION:

5 CORPORATE PHONE NO:

(509) 372-5000 AE2 UNITED ENG. 8 CONSTRUCTORS NSSS:

BABCOCK 8 WILCOX CONSTRbCTOR:

BECHTEL NRC LPM:

R. HEPHAN REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

P. P. NARBUT DER (MWE):

1266 IE RESIDENT INSPECTOR:

A. TOTH INSPECTION $TATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1CHED_ULE REPORTED.BY UTILITY NUMBER OF INSP.

OF INSP.

04-15-76 08-00-80 REASON FOR CHANGE NOT REPORTED BY THE 82-06 04-01-82 04-30-82 UTILITY.

82-07 04-05-82 04-09-82 09-00-76 03-00-81 DELAY IN COMPLETION OF ENGINEERING AND 82-08 04-26-82 04-30-82 LABOR DIFFICULTIES.

82-09 05-01-82 05-28-82 01-00-78 06-00-82 1 L ABOR PRODUCTI7ITY BELOW PLANNED LEVELS 82-10 06-07-82 06-18-82

2. INCREASE IN PLANNED DURATIONS FOR PIPING AND ELECTRICAL ACTIVITIES.

]

Inspection Reports are available at local PDRs.

3. EXTENDED DURATION FOR PREOPERATIONAL TESTING TO COMMERCIAL OPERATION.

j' 03-07-79 06-00-83 SCHEDULE REEVALUATION / LABOR PRODUCTIVITY BELOW PLANNED LEVELS.

06-00-80 01-00-84 NO REASON PROVIDED.

12-17-81 08-08-85 NO REASON PROVIDED.

12-00-81 12-00-85 REEVALUATION OF "0RK REMAINING TD COMPLETE PROJECT. TARGET COMPLETION DATE IS 8/85.

07-15-82 N/S EXTENDED CONSTRUCTION DELAY BEGINNING MAY 1982.

L0 CAL PUBLIC D0CUMENT R 0 0 M:

RICHLAND PUBLIC LIBRARY SWIFT AND NORTHGATE STREETS RICHLAND, UASHINGTON 99352

.t

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-123 WASHINGTON NUCLEAR 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N/S APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

08-01-85 DEFINED IN CP (EARLIEST) 01-08-80 APPLICANT'S ESTIMATED FUEL LDADING DATE AT CP ISSUANCE:

03-00-80 (LATEST) 01-01-82M APPLICANT'S CURRENT ESTIMATED COMitERCIAL OPERATIDH DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 63%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NCP EXTENSION PENDING 2

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START ELARl_

COMPLETION SDMRE1193

%,._SQMP L E T E MOBILIZE AND PREPARE SITE:

08-01-75 08-05-75

_ 100%

PLACE STRUCTURAL CONCRETE:

04-00-76 05-00-82 97%

INSTALL REACTOR PRESSURE VESSEL:

08-31-79 08-31-79 100%

INSTALL LARGE BORE PROCESS PIPE:

08-01-79 03-00-84 82%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

08-15-79 06-00-84 59%

INSTALL SMALL BORE PIPE:

04-01-81 09-00-84 27%

INGTALL CABLE TRAY:

01-01-79 08-00-83 82%

INSTALL EXPOSED NETAL CONDUIT:

04-01-81 09-00-84 32%

1 INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

08-07-81 12-00-84 13%

INSTALL ELECTRICAL TERMINATIONS:

10-06-81 02-00-85 2%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

06-00-85 06-00-85 0%

CONDUCT HOT FUNCTIONAL TEST:

08-00-85 08-00-85 0%

CONDUCT PREOP AND ACCEPTANCE TESTS hECESSARY FOR FUEL LOAD:

05-00-84 08-00-85 0%

C0N5TRUCTIOH STATUS REPORT PAGE HO: 2-124 WASHINGTON NUCLEAR 2 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET HO:

05000397 CORPORATE CONTACT:

R. L. FERGUSON, MANAGING DIRECTOR CP NO. 8 DATE ISSUED: CPPR-93 / 03-19-73 CP EXPIRATION DATE:

12-01-81 CORPORATE ADDRESS:

P. O. BOX 968 APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM RICHLAND, WASHINGTON 99352 PLANT LOCATION:

30 MI HW OF RICHLAND, WASH IE REGION:

5 CORPORATE PHONE NO:

(509) 372-5000 AE BURNS 8 ROE HS$$2 GENERAL ELECTRIC IE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

BECHTEL NRC LPM:

R. ALUCK REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

DER (MWE):

1103 IE RESIDENT INSPECTOR:

R. FEIL INSPECTIOH STATUSt FUEL L0AD DATE CHANGE $

TIME PERIOD A5 REPORTED BY UTILITY Anr. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY llTILITY NUMBER OF INSP.

OF INSP.

08-15-74 07-00-77 NO REASON HOTED.

82-08 05-03-82 05-07-82 01-10-75 12-00-77 INSUFFICIENT MANPOWER BY MAJOR 82-09 04-01-82 04-30-82 CONSTRUCTOR.

82-10 05-03-82 05-07-82 08-00-75 04-00-78 PERSISTING CIRTICAL PROBLEMS.

82-11 05-17-82 06-11-82 02-00-76 01-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND 4

82-12 05-01-82 05-31-82 MECHANICAL CONTRACTORS.

82-13 05-17-82 06-11-82 07-31-76 06-15-79 CIVIL CONIRACT DEFAULT AND EXTENDED LABOR DISPUTE.

Inspection Reports are available at local PDRs.

10-12-76 12-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND MECHANICAL CCHTRACTOR AND CONTINUING PIPE FITTER STRIKE.

01-17-77 03-00-80 PIPE FITTER STRIKE.

04-27-79 03-00-81 SCHEDULE REEVALUATION 06-00-80 08-00-82 HD REASON PROVIDED.

11-20-81 03-30-83 QUALITY PROBLEMS, LABOR DISPUTE, SCHEDULE RE-EVALUATION.

03-31-82 09-00-83 SCHEDULE RE-EVALUATION.

L0 CAL PUBLIC D0CUMENT R G 0 M:

RICHLAND PUBLIC LIDRARY SWIFT AND HORTHGATE STREETS RICHLAND, WASHINGTON 99352

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-125 WASHINGTON NUCLEAR 2 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION STATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

09-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

03-00-83 DEFINED IN CP: (EARLIEST) 12-00-82 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

04-00-77 (LATEST) 02-00-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 02-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 91%

C0fMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION gpMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

08-00-72 05-00-73 100%

PLACE STRUCTURAL CONCRETE:

05-00-73 03-00-78 100%

INSTALL REACTOR PRESSURE VESSEL:

03-00-77 100%

INSTALL LARGE BORE PROCESS PIPE:

07-00-75 09-00-82 97%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

07-00-75 12-00-82 90%

INSTALL SMALL BORE PIPE:

07-00-75 11-00-82 87%

INSTALL CABLE TRAY:

02-00-75 100%

INSTALL rXPOSED METAL CONDUIT:

02-00-75 12-00-82 88%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-00-75 01-00-83 92%

INSTALL ELECTRICAL TERMINATIONS:

02-30-75 01-00-83 75%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

08-00-82 0%

CONDUCT HOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND AC".EPTANCE TESTS HECESSARY FOR FUEL LOAD:

09-00-82 09-60-83 0%

i

)

C0NSTRUCTION 5TATUS REPORT PAGE NO: 2-126 WASHINGTON NUCLEAR 3 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERI$TICSt KEY PERS0NNELe DOCKET NO:

05000508 c0RPORATE CONTACT:

R. L. FERGUSON, MANAGING DIRECTOR CP NO. & DATE ISSUED: CPPR-154/ 04-11-78 CP EXPIRATION DATE2 01-01-83 J.

CORPORATE ADDRESS:

P. O. BOX 968 APPLICANT:

WASHINGTON PUELIC POWER SUPPLY SYSTEM RICHLAND, WASHINGTON 99352 PLANT LOCATION:

26 MI W OF OLYMPIA, WA AE EBASCO

- \\ CORPORATE PHONE NO:

(509) 372-5000 5

' '. r.

IE REGION:

NSSS:

COMBUSTION ENGINEERING CONSTRUCT 0A+

EBASCO HRC LPM:

L. WHEELER REACTOR TYP5:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1242 IE RESIDENT INSPECTOR:

W. G. ALBERT INSPECT 4 DN %TATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY UTILITY Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE

'KTPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

05-22-79 06-00-84 SCHEDULE REEVALUATION.

82-08 04-05-82 04-09-82 06-00-80 12-00-85 REASON FOR 18 (10 NTH SLIP WAS:

82-09 04-01-82 04-30-82 6 MONTHS - DUE TO LATE PIPING START 82-30 05-03-82 05-21-82 12110NT 'S - DUE 10 REVISED QUANTITY 82-11 05-01-82 05-31-82 AND PRODUCTIVITY ESTIMATES.

82-12 06-07-82 06-11-82 82-13 06-01-82 06-30-82 11-00-81 08-00-85 FOUR MONTHS SCHEDULE RECOVERY BASED ON REASSESSMENT OF PROJECT Inspection Reports are available at local PDRs.

CAPABILITY AND CONTRACT INCENTIVES FOR PRIME CONTRACTORS.

07-15-82 06-00-86 REPORTING BASED ON OFFICIAL FUEL LOAD DATE.

THE PROJECT IS STRIVING FOR A 6/85 FUEL LOAD.

PRESENT CONSTRUCTION.

a PROGRESS. SCHEDULES AND LICENSING ACTIVITIES SUPPORT 6/85.

6 L0 CAL PUBLIC D0CUMENT R 0 0 Mr W. H. ABEL NEMORIAL LIBRARY 125 MAIN STREET, SOUTH MONTESANO, WASHINGTON 98563 I

C 0 N S T R. U C T I O N STATUS REPORT PAGE NO: 2-127 WASHINGTON NUCLEAR 3 HUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION 5TATU5 APPLICANT'S CURRENT ESTIMt.TED FUEL LOADING DATE:

06-00-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

08-00-85 DEFINED IN CP: (EARLIEST) 01-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

07-00-83 (LATEST) 01-01-85 APPLICANT'S CURRENT E0TIMATED COMMERCIAL OPERATIDH DATE: 12-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 56%

COMMENTS RESARDIHG CURRENT CONSTRUCTION STATUS: NOFFICIAL PUBLISHED SCHEDULE IS JUNE 1986.

DECEMBER 1985 REPRESENTS PROJECT TARGET FUEL LOAD DATE.

ALL ESTIMATED START AND COMPL ETION DATES WILL NOT PRECLUDE UP TO A 6 MONTH EARLIER TARGET FUEL LOAD.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$1AR1 COMPLETI03 SOM_ P1EIDE 3._CQMPLETE MOBILIZE AND PREPARE SITE:

04-00-y7 04-00-y7 04-00-78 soo%

PLACE STRUCTURAL CONCRETE:

09-00-78 09-00-78 04-00-84 18%

INSTALL REACTOR PRESSURE VESSEL:

08-00-81 08-00-81 08-00-81 100%

1 INSTALL LARGE BORE PROCESS PIPE:

03-00-80 03-C0-80 08-00-84 70%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:

03-00-80 03-00-80 02-00-85 47%

INSTALL SMALL BORE PIPE:

03-00-81 03-00-81 11-00-84 33%

INSTALL CABLE TRAY:

09-00-80 09-00-80 08-00-83 71%

INSTALL EXPOSED METAL CONDUIT:

04-00-81 04-00-81 10-00-84 20%

INSTALL POWER COHTROL,.INSTRUMENTATIDH AND SECURITY CABLE:

02-00-82 01-00-82 10-00-84 3%

INSTALL ELECTRICAL TERMINATI0HS:

03-00-82 03-09-82 02-00-85 1%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

10-00-84 10-00-84 0%

CONDUCT HOT FUNCTIONAL TEST:

11-00-84 12-00-84 0%

g CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

03-00-83 06-00-86 0%

j

C0NSTRUCTION

$TATUS REP 0RT PAGE NO: 2-128 UATERFORD 3 HUCLEAR POWER PLANTS STATUS AS OF 06-30-82 P L A N'T CHARACTERISTIC 5:

KEY PERS0NNELa DGCKET NO:

05000382 CORPORATE CONTACT:

L. V. MAURIN, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-103/ 11-14-74 NUCLEAR OPERATIONS CP EXPIRATION DAIC:

10-31-83 CORPORATE ADDRESS:

142 DELARONDE STREFT APPLICANT:

LOUISIANA POWER a LIGHT NEW ORLEANS, LOUISIANA 70174 PLANT LOCATION:

20 MI W OF NEW ORLEANS, LA IE REGION:

4 CORPORATE PHONE NO:

(504) 366-2345 AE EBASCO MSSS:

COMBUSTION ENGINEERING CONSTRUCT 9R:

EBASCO NRC LPM:

S. BLACK REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (t11K ) 2 1151 IE RESIDENT INSPECTOR:

L. CONSTABLE INSPEC' ION S T A T U 5:

FUEL L0AD DATE CHANGE 5

~

TIME PERIOD AS REPORTED 8Y UTILITY Aor. *982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBE3 0F INSP.

OF INSP.

09-27-74 06-00-79 INORDINATELY LENGTHY LICENSING PROCEEDING, 8206 05-10-82 05-13-82 WHICH IS CURRENTLY BEING PROLONGED BY THE 8208 u4-05-82 04-08-82 ANTI-TRUST ISSUE.

8210 03-16-82 04-15-82 11-20-74 08-00-79 INORDINATELY LENGHTY LittNSING PROCEEDING, 8213 04-16-82 05-15-82 WHICH WAS PROLONGED BY TnE ANTI-TRUST ISSUE.

N57RUCTION SCHEDULE.

REEVALUATION GT tR'd'*E REAIISTIC AND 02-06-76 11-00-80 CHANGE REFLECTS A Inspection reports are available at local PDRs.

PRECISE CONSTRUCT!t't*ICHEDULE.

09-19-78 05-00-81 REEVALUATION OF COR$ t kUCTION SCHEDULE.

CHANGE REFLECTS A MORE REALISTIC AND PRECISE CONSTRUCTION SCHEDULE.

01-12-81 10-00-82 NO REASON PROVIDED.

04-12-82 01-00-83 NO REASON PROVIDED.

'y c

L0 CAL PUBLIC D0CUMENT R 0 0 N:

UNIVERSITY OF NEW ORLEANS LIBRARY LOUISIANA COLLECTION, LAKEFRONT NEW ORLEANS, LOUISIANA 70122 9

d%*

C0N$TRUCTION STATUS REP 0RT PAGE NO: 2-129 WATERFORD 3 NUCLEAR P0WER PLANTS STATUS AS OF:

06-30-82 l

C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

01-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-82 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

06-00-78 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 07-00-83 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 94%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START.

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

11-14-74 100%

PLACE STRUCTURAL CONCRETE:

12-08-75 12-31-82 99%

INSTALL REACTOR PRESSURE VESSEL:

10-01-78 01-21-79 100%

INSTALL LARGE BORE PROCESS PIPE:

09-01-77 06-30-82 99%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

09-01-77 08-30-82 97%

INSTALL SMALL BORE PIPE:

09-01-77 08-30-82 96%

INSTALL CABLE TRAY:

C2-02-78 06-30-80 100%

INSTALL EXPOSED METAL CONDUIT:

02-02-78 12-31-82 95%

l INSTALL POWER CONTROL. INSTRUMENTATION AND SECURITY CABLE:

09-01-78 01-31-83 93%

INSTALL ELECTRICAL TERMINATIONS:

05-01-79 02-28-83 86%

CONDUCT REACTOR COLD HYDROSTATIC TEST 06-15-82 06-29-82 0%

CONDUCT HOT FUNCTIONAL TEST:

08-27-82 10-02-82 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

02-19-79 12-01-82 47%

C0NSTRUCTION 5TATUS REPOQT PAGE NO: 2-130 WATTS BAR 1 NUCLEAR P0WER PLANTS STATUS AS OF 06-30-82 PLANT C N A R A C T E R I 5 T I C S:

KEY PERS0NNELa i

DOCKET NO:

05000390 CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP NO. 8 DATE ISSUED: CPPR-91 / 01-23-73 0F POWER CP EXPIRATION DATE:

06-01-79 CORPORATE ADDRESS:

500A CHESTNUT STREET TOWER II APPLICANT:

TENNESSEE VALLEY AUTHORITY CHATTANDOGA, TENNESSEE 37401 PLANT LOCATIDH to MI S OF SPRING CITY, TENN IE REGION:

2 CORPORATE PHONE NO:

(615) 751-2823 AE TENNESSEE VALLEY AUTHORITY NSSS:

WESTINGHOUSE CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

T. KENYON REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

R. V. CRLENJAK DER (MWE):

1165 IE RESIDENT INSPECTOR:

J. MCDONALD l

IN5PECTION STATU5:

FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYi Aor. 1982 - Jun. 1912 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1[HfDUlf Rfr0RTED BY UTILITY 1

EMMEER OF INSP.

OF INSP.

11-16-73 01-16-78 INABILITY TO OBTAIN STEEL ANCHOR BOLTS 8213 04-06-82 04-09-82 AND REINFORCING RODS.

8214 04-05-82 04-06-82 05-14-74 06-00-78 REDESIGH OF CONTAINMENT TO ACCOMMODATE 8215 04-12-82 04-16-82 HIGHER TRANSIENT PRESSURES, INABILITY TO 8216 04-20-82 04-23-82 OBTAIN REDESIGNED STEEL ANCHOR BOLTS AND 8217 04-27-82 04-30-82 REINFORCING RODS, PLUS AN INCREASE IN TIME 8218 04-21-82 05-20-82 TO ERECT STEEL PLATE THICKER THAN THE 8219 05-05-82 05-07-82 ORIGINAL DESIGH.

8222 05-21-82 06-20-82 07-23-76 12-05-78 LATE DELIVERY OF PRINCIPAL PIPING, VALVES, AND HANGERS WHICH FORCED IMPOSSIBLE PEAKS Inspection reports are available at local PDRs.

IN STEAMFITTER MANPO!!ER.

01-09-78 06-00-79 LATE DELIVERY OF ICE CONDENSER EMBEDMENTS 11-07-78 12-00-79 NO REASON GIVEH.

3 09-12-79 09-01-80 NO REASON GIVEN.

09-10-80 11-00-81 HD REASON PROVIDED.

09-10-81 08-00-82 STEAM GENERATOR PROBLEMS AND PIPING.

i 04-09-82 08-00-83 NO REASON PROVIDED.

.k i

L0 CAL PUBLIC D0CUMENT R 0 0 M:

CHATTANDOGA-HAMILTON COUNTY BICENTENNIAL LIBRARY 1001 BROAD STREET CHATTANDDGA, TENNESSEE 37402

. _ ~. -.

4 C0N5TRUCTION STATUS REPORT PAGE NO: 2-131 WATTS BAR 1 MUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 1

[

C0N5TRUCTION 5TATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE 08-00-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

08-00-82 DEFINED IN CPt (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

11-00-76 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 82%

CONMENTS REGARDING CURRENT CONSTRUCTION STATUS:

i i

I ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START-iLAR1 LOMPL ET ION

[0MPJFWOJ 3_ COMPLETE MOBILIZE AND PREPARE SITE:

12-26-72 04-15-74 100%

i PLACE STRUCTURAL CONCRETE:

04-09-74 03-01-83 97%

INSTALL REACTOR PRESSURE VESSE'L 12-07-76 05-05-77 100%

1 INSTALL LARGE BORE PROCESS PIPE:

10-17-77 03-01-83 91%

l INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND $NUbBERS:

10-17-77 03-01-83 69%

INSTALL SMALL BORE PIPE:

07-01-77 03-01-83 93%

INSTALL CABLE TRAY:

11-02-73 03-01-83 97%

INSTALL EXPOSED METAL CONDUIT:

09-08-75 03-01-83 76%

INSTALL POWER. CONTROL'. INSTRUMENTATION AND SECURITY CABLE:

06-03-76 03-08-83 84%

INSTALL ELECTRICAL TERMINATIONS:

06-03-76 03-01-83 77%

CONDUCT REACTOR COLD NYDR0 STATIC TEST:

10-15-81 10-15-81 10-24-81 10-24-81 100%

]

CONDUCT HOT FUNCTIONAL TEST 03-29-83 06-00-83 0%

CONDUCT PREOP AND ACCEPTANCE TESTS MECESSARY FOR FUEL LOAD 01-02-79 08-01-83 30%

i A

1 i

i u

j C 0 N $ T R,U C T I C H 15 T A T'u 5 REPORT PA!E NO: 2-132 WATTS BAR 2 N U C L E A'R P O W E,R PLAN 7S STATUS AS OF 06-30-82 PLANT C H A R A C T E R I $ T I C,SJ KEY PERSUNNEL DOCKET ND:

05000391 1

CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP NO. 8 DATE ISSUEDF,CPPR-92 / 01-23-73 0F POWER CP EXPIRATION DATE: /

63-01-6C' CORPORATE ADDRESS:

500A CHESTNUT STREET TOWER II APPLICANT:

iENNESSEE VALLEY AUTHORITY N

CHATTANDOGA, TENNESSEE 37431 f

PLANT LOCATION:

74 MI S OF SPRING CITY. TENN N.

IE REGION:

2 CORPORATE PHONE HO:

(615),751-2823

[

AE: ;,

TENNESSEE VALLEY AUTIORITY 4

NSSS! T -

1.

WESTINGHOUSE i

I

.D V,

7 *.

CONSTRUCTOR:

\\

TENNESSEE VALLEY A4THORITY NRC LPM:

T. KENYON if.

,/

REACTOR TYPE:

PWR IE PROJECT / INSPECCOR:

R.

V. CRLENJAK DER (nWE):

1165 IE R*SIDENT INSPECTOR:

J. MCDONALD J.

INSPECTION STATUS:

f / -

FUEL L0AD DATE CHANGES

/'f 7

l i

TIME PERIOD AS REP 0RTED BY UTILITYa

,e i

Apr. 1982 - Jun. 1982

/

/

i REPORT NEW REASON FOR CHANGE

' REPORT BEG DATE END DATE

/

DATE SCHEDULE REPORTED BY UTILITY s

EMUBER OF INSP.

OF INSP.

11-16-73 10-16-78 INABILITY TO OBTAIN STEEL ANCHOR BOLTS 8210 04-06-82 04-09-82 s

AND REINFORCING RODS.

8211 04-05-82%

34-06-82 05-14-74 03-05-79 REDESIGN OF CONTAINMENT TO, ACCOMMODATE

/

8212

. 04-12-82 04-16-82 HIGHER TRANSIENT PRESSURES.i IMABILITY TO 8213 04:20-826.

04-23-82 OBTAIN REDESZGNED STEEL ANCHOR BOLTS AND 8214 04-27-82 C4-30-82

/

REINFORCING RODS./PLUS AN INCREASE IN TIME 8215 04-21-82 01-20-82

-j TO ERECT S7 EEL PLATE THICKER THAN THE 8216 05-05-82 05-07-82 j

ORIGINAL CESIGN.

8218 05-21-82 06-20-82 07-23-76 09-05-79 LATE DELIVERY OF PRINCIPAL PIPING, VALVES, AND HANGERS M1ICH FORCED IMPOSSIBLE PEAKS Inspection reports are available at Iocal PDRs.

IN STEAMFITTER MANPOWER.

01-09-78 03-00-80 LATE DELIVERY OF ICE CONDENSER EMBEDMENTS 11-07-78 09-00-80 NO REASON GIVEN.

/.

09-12-79 06-01-81 NO REASON GIVEN.

09-10-80 08-00-82 NO REASON GIVEN.

09-10-81 06-00-83 NO REASON GIVEN.

04-09-82 08-00-84 STEAM GENERATOR PROBLEMS na0 PIPING.

t 4

t

.j.

L0 CAL PUBL IC D D C U M F *: i R00M

\\

/

5 CHATTAN00GA-HAMILTON COUNTY i

BICENTENNIAL LIBRARY b 'sjQ 1001 BRCAD STREET

( -

CHATTANDDGA, TENNESSEE 37402

- Ie 1_

s 1

f l

(

f

  • \\

C0N3TRUCTION STATUS REP 0RT PAGE NO: 2-133 WATTS BAR 2 NUCLEAR POWER PLANTS

. STATUS AS OF 06-33-62 C'O N S T R U C T I O N S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

08-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL'LOADItlG DATE:

06-01-83 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-77 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OP'iRATION DATE: 06-01-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 52%

. COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11ARI_

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

12-26-72 04-15-74 100%

PLACE STRUCTURAL CONCRETE:

05-10-74 07-19-84 85%

INSTALL REACTOR PRESSURE VESSEL:

06-30-77 10-10-77 100%

INSTALL LARGE BORE PROCESS PIPE:

12-09-77 07-19-84 74%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

03-10-78 07-19-84 45%

INSTALL SMALL BORE PIPE:

11-01-77 07-19-84 54%

i INSTALL CABLE TRAY:

11-02-73 07-19-84 81%

INSTALL EXPOSED METAL C0hDUIT 09-04-75 07-19-84 63%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

08-20-76 07-19-84 77%

INSTALL ELECTRICAL TERMINATIONS:

08-20-76 07-19-84 63%

CONDUCT REACTOR COLD HYDR 0 STATIC TEST:

10-00-83 10-00-83 0%

CONDUCT HOT FUNCTIONAL TEST 03-01 06-00-84 OX CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

12-00-82 08-00-84 0%

l

C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-134 WOLF CREEK l NUCLEAR POWER PLANT $

STATUS AS OF:

06-30-82 PLANT C N A R A C T E R I $ T I C S:

KEY P E R S O N N E L:

DOCKET NO:

05000482 CORPORATE CONTACT:

G. L. K0 ESTER, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-147/ 05-17-77 NUCLEAR CP EXPIRATION DATE:

03-01-84 CORPORATE ADDRESS:

P.

O.

BOX 203 APPLICANT:

KANSAS GAS 8 ELECTRIC WICHITA, KANSAS 67201 PLANT LOCATION:

3.5 MI NE OF BURLINGTON, KAN IE REGION:

4 CORPORATE PHONE NO:

(316) 261-6451 AE BECHTEL NSSS:

WESTINGHOUSE CONSTRUCTOR:

DANIEL INTERNATIONAL HRC LPM:

J. HOPKINS REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1150 IE RESIDENT INSPECTOR:

T. VANDEL INSPECTION S T A T U 5:

FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY U T I L I T Y:

Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1CHEQQLE RFf_0RTED BY UTILITY NUMBER OF INSP.

OF INSP.

01-14-81 04-01-83 NO REASON PROVIDED.

8206 03-29-82 04-02-82 11-27-81 12-16-83 NO REASON PROVIDED.

8207 04-01-82 04-30-82 8210 05-10-82 05-14-82 Inspection reports are available at local PDRs.

L0 CAL PUBLIC DDCUMENT R 0 0 M:

WILLIAM ALLEN WHITE MEMORIAL LIBRARY EMPORIA STATE UNIVERSITY 1200 COMMERCIAL EMPORIA, KANSAS 66801

C0NSTRUCTION STATUS QEPQRT PAGE NO: 2-135 WOLF CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-16-83 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADIN3 D**E:

04-01-83 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LDADING DATE AT Cr ASSUANCE:

10-01-82 (LATEST)

APPLILANT'S CUR"~:li ESTIMATED COMMERCI AL OPERATION DATE: 05-31-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 80%

. COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NO UPDATE PROVIDED FOR THE SLCOND QUARTER OF 1982.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

_UART 1HR1 p_0MlLE I03 Q(1PLQIOji jLGQMPlETE MOBILIZE AND PREPARE SITE:

01-24-77 08-24-77 08-01-77 12-01-77 1004 PLACE STRUCTURAL CONCRETE:

08-01-77 06-01-77 06-01-83 97%

INSTALL REACTOR PRESSURE VESSEL:

10-01-79 02-29-80 11-01-79 04-11-80 100%

INSTALL LARGE BORE PROCESS PIPE:

03-01-78 04-01-83 89%

INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:

04-01-78 12-01-82 65%

INSTALL SMALL BORE PIPE:

08-01-78 04-01-83 51%

INSTALL CABLE TRAY:

08-01-78 04-01-82 90%

I INSTALL EXPOSED METAL CONDUIT:

02-01-78 12-01-82 53%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-01-80 04-01-83 65%

INSTALL ELECTRICAL TERMINATIONS:

06-01-80 08-01-83 29%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

05-20-83 05-27-83 0%

CONDUCT HOT FUNCTIONAL TEST:

09-02-83 09-23-83 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

05-25-81 07-29-81 10-01-83 0%

C0NSTRUCTION 5TATUS R0 PORT PAGE NO: 2-136 YELLOW CREEK 1 NUCLEAR POWER PLANT 1 STATUS AS OF 06-30-82 PLANT CHARACTERI5 TICS:

KEY PERS0NNELa DOCKET NO:

05000566 CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP HO. 8 DATE ISSUED: CPPR-172/ 11-29-78 0F POWER CP EXPIRATION DATE:

05-01-85 CORPORATE ADDRESS:

500A CHESTNUT STREET TOWER II APPLICAHit TENNESSEE VALLEY AUTHORITY CHATTANDOGA, TEENESSEE 37401 PLANT LOCATION:

15 MI E OF CORINTH, MISS IE REGION:

2 CORPORATE PHONE NO:

f615) 751-2823 AE:

TENNESSEE VALLEY AUTHORITY NSSS:

COMBUSTION ENGINEERING CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY HRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

R. V. tRLENJAK DER (MWE):

1285 IE RESIDENT INSPECTOR:

INSPECTIDH $ T A T U S:

FUEL LOAD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY ILUn!!f3 0F INSP.

OF INSP.

09-12-79 01-02-85 NO REASON GIVEN.

8202 04-20-82 04-23-82 09-10-80 10-00-86 NO REASON PROVIDED.

08-14-81 07-00-89 HO REASON PROVIDED.

Inspection reports are available at local PDRs.

i L0 CAL PUBLIC D0CUMENT R 0 0 N:

CORINTH PUBLIC LIBRARY 1023 FILLMORE STREET COR I '.T H, MISSISSIPPI 38834

C0N5TRUCTION 5TATUS REPQRT PAGE NO: 2-137 YELLOW CREEK 1 NUCLEAR POWER PLANTS STATUS AS OF:

06-30-82 C0NSTRUCTION S T A T U S:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

07-01-89 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-86 DEFINED IN CP: (EARLIEST) 02-01-84 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

02-01-84 05-01-85 APPLICANI'S CURRENT ESTIMATED C0f1MERCIAL OPERATION DATE: 01-01-90 CURREtIT ESTIMATED PERCENT CON 3TRUCTION COMPLETE: 35%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITN OPTION TO RESTART AS HECESSARY.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START ilARl_

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

02-09-78 12-14-78 100%

PLACE STRUCTURAL CONCRETE:

12-14-78 05-30-88 87%

INSTALL REACTOR PRESSURE VESSEL:

05-30-88 06-28-88 0%

INSTALL LARGE BORE PROCESS PIPE:

02-25-81 11-27-87 1%

INSTALL L ARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

02-25-81 01-14-88 1%

1 07-07-83 01-14-88 0%

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

05-13-81 12-31-87 1%

INSTALL EXPOSED METAL CONDUIT:

02-11-83 12-25-86 0%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

03-24-83 01-14-88 0%

INSTALL ELECTRICAL TERMINATI0HS:

03-24-83 01-14-88 0%

i CONDUCT REACTOR COLD HYDROSTATIC TEST 11-30-87 12-14-87 0%

i CONDUCT HOT FUNCTIONAL TEST:

03-10-88 04-21-88 0%

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

05-01-84 07-01-89 0%

1

~

C0N$TRUCTION

$TATUS OEPORT PAGE NO: 2-138 YELLOW CREEK 2 NUCLEAR POWER PLANTS STATUS AS OF 06-30-82 PLAMT CHARACTERISTICS KEY PERSONNEL DOCKET NO:

05000567 CORPORATE CONTACT:

H. G. PARRIS, MANAGER CP NO. 8 DATE ISSUED: CPPR-173/ 11-29-78 0F POWER CP EXPIRATION DATE:

05-01-86 CORPORATE ADDRESS:

500A CHESTNUT STREET TOWER II APPLICANT:

TENNESSEE VALLEY AUTHORITY CHATTANDOGA, TENNESSEE 37401 PLANT LOCATION:

15 MI E OF CORINTN, MISS IE REGION:

2 CORPORATE PHONE NO:

(615) 751-2823 AE2 TENNESSEE VALLEY AUTHORITY NSSS:

COMBUSTION ENGINEERING CONSTRUCTOR:

TENNESSEE VALLEY AUTHORITY NRC LPM:

UNASSIGNED REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

R. V. CRLENJAK DER (MWE):

1285 IE RESIDENT INSPECTOR:

IN5PECTION 5TATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-12-79 10-05-87 NO REASON GIVEN.

8202 04-20-82 04-23-82 01-15-80 04-01-87 NO REASON GIVEN.

09-10-80 10-00-92 NO REASON GIVEN.

08-14-81 N/S DEFERRED.

Inspection reports are available at local PDRs.

l i

1 L0 CAL PUBL IC D0CUMENT R 0 0 M:

CORINTH PUBLIC LIBRARY 1023 FILLMORE STREET CORINTH, MISSISSIPPI 38834 i

i 1

i

C0NSTRUCTION STATUS REPORT PAGE HO* 2-139 YELLOW CREEK 2 HUCLEAR P0WER PLAHTS STATUS AS OF:

06-30-82 C0HSTRUCTION STATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING D' ATE:

N/S APPLICANTS CONSTRUCTION COMPL ETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-92 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

N/S (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

3%

COMMENTS RECARDING CURRENT CONSTRUCTION STATUS: PROJECT DEFERRED WITH OPTION TO RESTART AS HECESSARY.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$1ARI_

COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

N/S PLACE STPUCTURAL CONCRETE:

INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

INSTALL EXPOSED METAL CONDUIT INSTALL POWER,CCNTROL INSTRUMENTATION AND SECURITY CABLE:

i INSTALL ELECTRICAL TERMINATIONS:

CONDUCT REACTOR COLD HYDROSTATIC TEST:

CONDUCT HOT FUNCTIONAL TEST:

CONDUCT PREOP AHD ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

C0NSTRUCTION STATUS REPORT PAGE NO: 2-140 ZIMMER 1 NUCL EAR P0WER PLANTS STATUS AS OF 06-30-82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:

DOCKET NO:

050003S8 CORPORATE CONTACT:

E.

A. BORGMAN, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-88 / 10-27-72 ENGINEERING CP EXPIRATION DATE:

01-01-77 CORPORATE ADDRESS:

139 EAST 4TH STREET APPLICANT:

CINCINNATI GAS 8 ELECTRIC CINCINNATI, OHIO PLANT LOCATION:

24 MI SE OF CINCINNATI, OH IE REGION:

3 CORPORATE PHONE N01 (513) 632-2663 AE:

SARGENT & LUNDY NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

KAISER ENGINEERS NRC LPM:

G. DICK REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

E. SCHWEIBINEZ DER (MWE):

0810 IE RESIDENT INSPECTOR:

W. CHRISTIANSON i

2NSPECT ION S T A T U S:

FUEL L0AD DATE CHANGES TIME PERIOD AS REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE SCHEDULE REPORTED BY UTILITY NtiMBER OF INSP.

OF INSP.

09-26-74 02-00-78

1. PRODUCTIVITY.

8201 11-02-81 02-18-82

2. SOME MATERIAL $NORTAGES.

8202 02-01-82 03-05-82

3. CRAFT STRIKES WHICH CONSUMED MOST OF 8203 02-09-82 02-19-82 THE SUMMER BUILDING SEASON.

8204 03-10-82 03-25-82 10-15-74 04-00-78 REEVALUATION OF N05.

1, 2 AND 3 ABOVE.

10-18-77 10-00-78 REEVALUATION OF CONSTRUCTION NETWORK.

Inspection Reports are available at local PDRs.

04-00-78 06-00-79 CONSTRUCTION EXTENDED SCHEDULE.

05-14-79 10-00-79 NO REASON GIVEN.

09-21-79 08-00-80 NO REASON GIVEN.

06-03-80 11-00-81 NO REASON GIVEN.

10-22-81 07-00-82 NO REASON GIVEN.

04-19-82 12-00-82 NO REASON GIVEN.

l L0 CAL PUBLIC D0CUMENT R 0 0 M:

CLERMONT COUNTY LIBRARY THIRD AND BROADWAY STREETS BATAVI#, OHIO 45103 1

C0HSTRUCTION STATUS REPORT PAGE HO: 2-141 ZIMMER 1 HUCLEAR P0WER PLAHTS STATUS AS OF:

06-30-82 C0HSTRUCTIOH STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-00-12 APPLICANTS CONSTRUCTION COMPLETIDH ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-00-12 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

01-00-17 (LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-00-85 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: 98%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: UPDATE NOT PROVIDED IN HEW FORMAT.

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START ilAR1_

COMPLETI0H

$2MPLETION % COMPLETE NOBILIZE AND PREPARE SITE:

03-00-71 06-00-71 100%

PLACE STRUCTURAL CONCRETE:

06-00-73 INSTALL REACTOR PRESSURE VESSEL:

11-00-75 01-00-76 100%

INSTALL LARGE BORC PRCt.ESS PIPE:

INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:

03-00-75 06-00-82 93%

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

08-03-73 05-00-81 100%

INSTALL EXPOSED METAL CONDUIT:

08-00-73 05-00-81 100%

INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:

02-00-70 02-00-82 98%

INSTALL ELECTRICAL TERMINATIONS:

CONDUCT REACTOR COLD HYDROSTATIC TEST:

05-00-78 07-00-78 100%

CONDUCT HDT FUNCTIONAL TEST N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD s

-w i

l 1

I E

C C.)

La.J C4 P

_ - - _ -. - - - - -. - - -,.., +

i l

l 5CHEDULE F0R UPDATES PAGE NO: 3-001 CALENDAR YEAR 1 982 4

This report is a quarterly publication. Updates from the respondents for Calendar Year 1982 are due as follows:

FIRST QllARTER 1982 DUE APRIL 30, 1982 SECOND QUARTER 1982 DUE JULY 30, 1982 THIRD QUARTER 1982 DUE OCTOBER 29, 1982 FOURTH QUARTER 1982 DUE JANUARY 28, 1983 The update information should be forwarded to:

Chief, Management Information Branch Office of Resource Manaqcment U. S. Huclear Regulatory Commission Washington, D. C.

20555 i

l i

i i

1 l

j

?

j i

.I 4

1 PAGE NO: 3-002 C 0 N S.T R U C T I 0 N 5TATUS REP 0RT PAGE NO: 2-XXX FACILITY MAME APPEARS NERE NUCLEAR POWER PLANTS STATUS AS OF I

I PLAMT CHARACTERISTICS KEY P E R 5 0 H M E L:

DOCKET NO:

05000XXX CORPORATE CONTACT:

CP HO. 8 DATE ISSUED:

CP EXPIRATION DATE:

CORPORATE ADDRESS:

APPLICANT:

PLANT LOCATION:

IE REGION:

CORPORATE PHONE NO:

AE:

NSSS:

CONSTRUCTOR:

NRC LPM:

i REACTOR TYPE:

IE PROJECT INSPECTOR:

l DER (T1WE):

IE RESIDENT INSPECTOR:

INSPECTION 5 T A T U S:

FUEL LOAD DATE CHANGES TIME PERIOD AS REPQRTED BY U T I L I T Y:

J REPORT HEW REASON FOR CHANDE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY j

HEDBER OF IN1E.

OF INSP.

1 1,

4 I

i i

L0 CAL PUBLIC D0CUMENT R 0,0 M:

e i

t

PAGE NO: 3-003 C0NSTRUCTION STATUS REP 0RT PAGE NO: 2-XXX FACILITY HAME APPEARS HERE NUCLEAR POWER PLANTS STATUS AS OF CDN5TRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

(LATEST)

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATIDH DATE:

CURRENT ESTIMATED PERCENT CONSlRUCTION COMPLETE:

COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION % COMPLETE MOBILIZE AND PREPARE SITE:

PLACE STRUCTURAL CONCRETE:

INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BORE PIPE HANGERS RESTRAINTS AND SNUBBERS:

INSTALL SMALL BORE PIPE:

INSTALL CABLE TRAY:

INSTALL EXPOSED METAL CONDUIT:

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS CONDUCT REACTOR COLD HYDROSTATIC TEST CONDUCT HOT FUNCTIONAL TEST CONDUCT PRE 0P AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD I

U.S. NUCLE AR CEGUL ATORY COMMISSION NUREG-0030, Vol. 6 No. 2 BIBLIOGRAPHIC DATA SHEET

4. TITLE AND SUBTITLE (Ade Volume Na. af appropressel 2.(Lear etanal Nuclear Power Plants - Construction Status Report Data as of 06/30/82
3. RECIPIENT 3 ACCESSION NO.
7. AUTHORtS)
5. DATE REPORT COMPLETED M ON T H l YEAR October 1982
9. PE RFORMING ORGANIZATION NAME AND LI AtLING ADDRESS (include Esa Codel DATE REPORT ISSUED MONTH lVEAR U.S. Nuclear Regulatory Conmission October 1982 Office of Resource Management

,71,,,,,,,,

Management Information Branch Washington, D.C.

20555

..ft,,,,,,,)

12. SPONSORING ORGANIZ ATION NAME AND M AtLING ADDRESS (include /sp Codel p

U.S. Nuclear Regulatory Commission Office of Resource Management

11. CONTRACT NO.

Management Information Brt.nch Washington, D.C.

20555

13. TYPE OF REPORT PE mioo covtRED (tactus re da#rst Construction Status Report April 1, 1982 Thru June 30, 1982
14. (Leave c/m&J
15. SUPPLEMENTARY NOTES St. ABSTR ACT 000 words or less)

The " Construction Status Report," also referred to as the " Yellow Book," is a quarterly publication containing nuclear power plant construction data and actual progress. The information contained in this report is supplied to the NRC by applicants with Construction Pennits.

17. KE Y WORDS AND DOCUMENT AN ALYSIS 17a DESCRIPTORS 17b IDENTIFIERS OPEN ENDE D TERMS 19 SE CURITY CL ASS (Tn.s report /

21 NO OF P Af,ES IS AV AIL ABILITY ST ATEMENT Unlimited Unclassified 20 SE R TY CL f

spast 22 PRICE J

UNITE 3 STATE 3 Efd,a*'sSs*sNo NUCLEAR RE"ULATORY CORARetSSION WASHINGTON, D.C. 20065 g",C -

g re non me ksL ~

OFFICIAL BUSINESS PENALTY FOR PRIVATE USF,9300 f

120555078877 1 ANNB US ARC ADM DIV CF TIDC POLICY 6 PUBLICAT IONS MGT BR POR NUREG COPY LA 212 WASHINGTON DC 20555 a