Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARTXX-9914, Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed1999-06-16016 June 1999 Responds to 990525 RAI Re Renewal of Tpdes Permit Number 01854.Explanation & Response to Each Item,Listed ML20206E7271999-04-29029 April 1999 Submits Original & Four Complete Copies of Application for Renewal of Permit to Discharge,Deposit or Dispose of Wastes Into or Adjacent to Water in State. with Three Oversize Drawings ML20045D3451992-06-16016 June 1992 Discusses Util Review of 920603 Ltr Outlining Thermal Science,Inc Field Surveillance of Application of Thermo-Lag 330 Fire Barrier Sys on Util Test Assemblies at Omega Poing Labs.Supporting Documentation Encl ML20091Q2891992-01-27027 January 1992 Forwards Rev 7 to Quarterly Plant Performance & Other Indicator Data for Fourth Quarter of 1991 & Gross Heat Rate Data Form for 1991 ML20070T7651991-04-0101 April 1991 Forwards 910327 License Amend Request 91-001 Re Addition of Spec 3/4.7.12 & Bases 3/4.7.12 for Safety Chilled Water Sys ML20073D1051991-03-29029 March 1991 Comments on Final Rept Addressing Scaling for Unit 1,dtd Feb 1991 Per Insp Repts 50-445/90-47 & 50-446/90-47.Concerns Raised That Util Selected Criterion XI Re Test Control as Sole Mgt Std to Control safety-related Activities ML20066A5711990-12-19019 December 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15,authored by Ebasco ML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 1999-06-16
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20056B3741990-08-21021 August 1990 Forwards Update to ASME Section Iii,Div 1 Code Control Program Documents for Incorporation Into State of Tx Dept of Licensing & Regulation Controlled Manual CCPM-15 ML20011E1521990-01-27027 January 1990 Forwards Addl Case Concern Repts 89-0025 Re Apparent Substandard Shop Applied Welds Internal to Secondary Side of Steam Generators & 89-0034 on Specific Wiring & Connection Method Damaging safety-related Electrical Wiring ML20248D0661989-09-21021 September 1989 Notifies Util of Case Position on Concerns & Problems in Scaling Calculation Program at Plant.Documentary Info Supporting Util Position on Aspect of Dispute Should Be Provided ML19332E0011989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review Per 10CFR50.54(t) ML19332D4781989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review to Be Conducted Every 12 Months.Review Must Include Evaluation for Adequacy of Interfaces W/State & Local Govts ML19332C8171989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML19332C7971989-09-14014 September 1989 Forwards Offsite Portion of Annual Emergency Preparedness Independent Review & Status of Corrective Actions Initiated, Per 10CFR50.54(t) ML20246A0421989-08-18018 August 1989 Advises That S&W Notified by Util That Responsibility for Facility Code Control Program Will Be Terminated Effective on 890823.EBASCO Svcs,Inc Selected to Assume Responsibility for Code Control Program Effective on 890824 ML20247R7291989-07-28028 July 1989 Advises That Status of Suspect molded-case Curcuit Breakers, Identified in Initiative Element One Will Be Provided by 890815.Util Estimates That 750 nonsafety-related Breakers in Warehouse Stock Examined as Part of Initiative Element Two ML20247D2491989-07-12012 July 1989 Forwards Communications Repts Associated W/Design Control Review ML20247A9261989-05-11011 May 1989 Forwards State of Tx & Local Govt Objectives for Graded Exercise Scheduled for 890725-26 ML20245J3341989-04-0707 April 1989 Forwards Summary of Points of Agreement Reached at 890308 Meeting.Agreements Will Be Subj to Further Discussion Among Parties.W/Certificate of Svc.Served on 890427 ML20246H4791989-03-0606 March 1989 Forwards Communications Repts Associated W/Corrective Action Programs for Plant Independent Assessment Program Phases ML20206F7201988-11-14014 November 1988 Forwards Communications Rept Transmittal 47 Re Independent Assessment Program on All Phases of Conduit Support Design Review ML20151X2621988-08-19019 August 1988 Forwards Rev 4 to Independent Assessment Program:Conduit Support Design Review Issues List for Comanche Peak Electric Station - Unit 1 ML20154H6281988-05-21021 May 1988 Requests to Be Advised at Earliest Opportunity Whether Projected Schedule for Issuance of Phase IV Rept Available. Related Correspondence ML20147F8911988-03-0303 March 1988 Forwards Communications Repts Associated W/Piping/Pipe Support Audits ML20147G2941988-03-0303 March 1988 Forwards Communication Repts Re Cable Tray Audits,Per Independent Assessment Program ML20147H4891988-03-0303 March 1988 Forwards Communications Repts Associated W/Independent Assessment Program Conduit Audits ML20147G2261988-03-0303 March 1988 Forwards Communications Repts Associated W/Civil/Structural Audits ML20196F7451988-02-23023 February 1988 Forwards Surveillance Repts Associated W/Phase 4 Independent Assessment Program Obtained During Util Review ML20196D4541988-02-0909 February 1988 Forwards Rev 4 of Mechanical Review Issues List (Ril). Rev Includes Review Issue 10 Re Component Cooling Water Sys Butterfly Valve at Outlet of Residual Heat Removal Hx.Rev of Ril Reflects Info That Cygna Gained Prior to Dec 1987 ML20236X2701987-11-25025 November 1987 Forwards Communications Repts on Independent Assessment Program,Phase 4 Re Cable Tray,Civil/Structural & Conduit Audits ML20236S3231987-11-13013 November 1987 Forwards Communications Repts Associated W/Conduit Audits. List of Communications Repts Encl ML20236S1281987-11-13013 November 1987 Forwards Communications Repts Associated W/Civil/Structural Audits.List of Communications Repts Encl ML20236R9531987-11-13013 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits.List of Communication Repts Encl ML20236R9361987-11-13013 November 1987 Forwards Communications Repts Associated W/Piping/Pipe Support Audits.Repts Also Listed in Attachment ML20236M3131987-11-0909 November 1987 Forwards Communications Repts Associated W/Cable Tray Audits,Per Communication Repts Transmittal 33 for Independent Assessment Program - All Phases.List of Encl Communication Repts Provided on Attachment 1 TXX-6932, Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range1987-11-0606 November 1987 Advises That Value of 7.43 Ph Units Reported in Performance Evaluation Rept DMR-QA Study 7 Re 1987 NPDES QA Program Incorrect Due to Clerical Error.Reported Value Should Have Been 8.43 Ph Units,Which Is within Acceptable Range ML20235V4691987-10-10010 October 1987 Forwards Communications Repts Re Cable Tray Audits,Per Facility Independent Assessment Program,Phase 4 ML20235W3331987-10-10010 October 1987 Forwards Communications Repts Re Civil/Structural Audits,Per Independent Assessment Program,Phase 4 ML20235R4941987-09-30030 September 1987 Notifies of Confirmation That Util Given Extension Until 871026 to Respond to Case Motion to Compel Applicants to Supply Complete Answers to Consolidated Intervenors Interrogatories & Request for Production of Documents ML20235R1961987-09-18018 September 1987 Forwards Rev 4 of Pipe Support Review Issues List. Any Procedural Control Issues Associated W/Author Original Pipe Support Reviews of Gibbs & Hill Being Processed as Part of Ongoing Design Control Assessments ML20235R0571987-09-18018 September 1987 Forwards Communications Repts Re Cable Tray Audits ML20234B1451987-09-16016 September 1987 Forwards Rev 4 to Pipe Stress Review Issues List (Ril).All Technical Issues Associated W/Discipline Closed.Still Waiting for S&W Calculation 15454-NZ(B)-GENX-035,Rev 2 to Verify Completion of Commitments Associated W/Ril 11 TXX-6718, Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc1987-09-0404 September 1987 Forwards Listed Outstanding Documents Requested Through Audits of Ebasco Svcs,Inc ML20238E5591987-09-0303 September 1987 Confirms That Brazos Understanding of Phrase,As Set Forth in Objections & Responses of 870814,essentially Correct. Related Correspondence ML20237K7931987-09-0101 September 1987 Forwards Communications Rept Transmittal 29,transmitting Piping/Pipe Support Audits for Independent Assessment Program Phase 4.W/o Encl ML20237J9981987-09-0101 September 1987 Forwards Communications Rept Transmittal 27,transmitting Conduit Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encls ML20237K7081987-09-0101 September 1987 Forwards Communications Rept Transmittal 28,transmitting Cable Tray Audits Re Independent Assessment Program - Phase 4 for Plant.Delay in Processing Telcons Noted Due to Word Processing Sys Conversion.W/O Encl ML20237K0091987-08-11011 August 1987 Memorializes Recent Conversations & Resulting Agreement Re Extension of Time Until 870908 for Filing Case & M Gregory Response to Applicant 870713 Motion for Reconsideration of Board 870622 Order.Related Correspondence ML20237J1281987-08-10010 August 1987 Forwards Rev 14 of Cable Tray Supports Review Issues List. Rev Based on Info Provided in Util Rev 2 to Generic Issues Rept for Cable Tray Hangers,Transcripts of Public Meetings & Results of Cynga Audits Through 870731 ML20236D3271987-07-22022 July 1987 Forwards Rev 0 to Civil-Structural Review Issues List, Based on Ref Info,Transcripts of Public Meetings,Documents Provided by Util & Results of Cygna Audits Through 870613 ML20216D1721987-06-20020 June 1987 Ack Receipt of .Clarifies Agreement Made During Telcon Re Date for Case to File Initial Supplementary Responses Deferred Until 870706.Necessary Discovery & Response Should Be Completed Also.Related Correspondence ML20215D7141987-06-0303 June 1987 Informs All Concerned W/Facility Independent Assessment Program of Address Correction ML20214S0641987-05-26026 May 1987 Ack Receipt of Applicant 870518 Fifth Progress Rept.Requests That Recipient Notify of When Substantive Matls Will Be Made Available So Case May Decide on Course of Action Re Comanche Peak Response Team Adequacy Issues.Related Correspondence ML20234C6731987-05-0101 May 1987 Forwards Communications Repts Associated W/Cygna Audits of S&W Civil/Structural Action Plan Re Plant Independent Assessment Program - Phase 4 ML20234C4401987-05-0101 May 1987 Forwards Communication Repts Re Cygna Audits of S&W Piping & Pipe Support Verification Activities,Per Phase 4 of Independent Assessment Program.Submittal Constitutes Communications Rept Transmittal 23 TXX-6361, Forwards Receipt to Ack Part 21 Rept Re Qualification Test Rept F-C5205-3, Nuclear Qualification - Terminal Blocks1987-03-23023 March 1987 Forwards Receipt to Ack Part 21 Rept Re Qualification Test Rept F-C5205-3, Nuclear Qualification - Terminal Blocks ML20205C0741987-03-18018 March 1987 Forwards Comments & Questions on Ebasco & Util Procedures & Criteria Re Responses to Conduit Support Review Issues List for Upcoming 870324 & 25 Conduit Support Meetings Per Rev 0 to Generic Issues Rept 1990-08-21
[Table view] |
Text
v ,
LAW OFFICES OF ...,7-r-DEBEVOIS E & LIBERM AN 3200 SEVENTEENTH S T R E CT. N . W.
i
'83 APR -4 MOTcLcPHONE
- W HINGTO N. D. C. 2003 6 (202) 857-9800 kt - . SRANCH N NP .
March 29, 1983
^
Mrs. Juanita Ellis
- ~ ~ ~ ~~~
President, CASE
~ ~ -
1426 South Polk Street Dallas, Texas 75224 Re: Texas Utilities Generating Company, et al.
(Comanche Peak Steam Electric Station, Units 1 and 2), Docket Nos. 50-445 and 50-446
Dear Mrs. Ellis:
This is to confirm our tel,ephone conversation with you today regarding the availability of the design criteria of.
ITT-Grinnel and NPSI. As we stated, in view of the Board's request in the March 28, 1983 conference call, we have contacted both ITT-Grinnel and NPSI, and each has agreed to make available tomorrow and Thursday (March 30 and 31) a copy of.their design criteria for your inspection at the Comanche Peak site. This will be accomplished in accord-ance with procedures discussed below to which ITT-Grinnel and NPSI have agreed. These procedures are. designed to protect the proprietary information contained in those criteria. Before you come to the site, you should contact John Finneran (817/897-4881, ext. 521 or 619) who will designate a room in which the companies will make available their criteria.
Both NPSI-and ITT-Grinnel have stated that you may have someone accompany you to review these documents.
However, the person may not be.anyone who is employed by a potential competitor of ITT-Grinnel or NPSI. Upon -
completion of your review of one set of criteria, the other will be made available. In addition, both companies will permit you to take notes during your review of their criteria. However, you must obtain approval from each
- company if you wish to have copies made of any portion of the documents.
,A 8304060173 830329 PDR ADOCK 05000445 D
G PDR ,,
,./ I'
- f .
s' With respect to the ITT-Grinnel criteria, you should contact Mr.. Tom Smith of ITT-Grinnel (401/831-7000) with any requests to ma.ke copies. Mr. Smith will determine whether a protective agreement to prevent disclosure of proprietary information need be executed between you and ITT-Grinnel before you may obtain copies. With respect to the NPSI criteria, you should prepare a list of page numbers which you wish to copy. Mr. Finneran will trans-mit your copy list to NPSI who will indicate which pages may be copied and which pages will require execution of a protective agreement between you and NPSI before copies
Any further inquiries or arrangements regarding these
____ _ _ design _ criteria _ should be_ directed to_ITT.-Grinnel-and NPSI.
We have intermediated in this matter because of the Board's request to do so, and not because we have changed our position that these documents are considered by ITT-Grinnel and NPSI to be proprietary and in any event are not in Applicants' possession.
Sincerely,
.S.
Nicholas S. Reynolds .
Counsel for Applicants OVERNIGHT DELIVERY cc: Service List e
U Law orrects or . 7 ,, g DEBEVOIS E & LIBERM AN 1200 SEVENTECNTH STRECT. N.W.
TcLcpHoNE (202) 857-9800
,,:.:..a
. 3;c " uG & 3Er. .
Eki CH March 29, 1983 Marshall E. Miller, Esq. Dr. Kenneth A. McCollom Chairman, Atomic Safety and Dean, Division of Engineering,
_ Licens ing Board Architecture and Technology _
U.S. Nuclear Regulatory Oklahoma State University Commission Stillwater, Oklahoma 74078 Washington, D.C. 20555 Dr. Walter H. Jordan Member, Atomic Safety and Licensing Board 881 West Outer Drive Oak Ridge, Tennessee 37830 Re: Texas Utilities Generating. Company, et al.
(Comanche Peak Steam Electric Station, Units 1 and 2), Docket Nos. 50-445 and 50-446 Gentlemen:
In accordance with the Board's request in its March 9, 1983 Memorandum and Order (Memorializing Conference Call) that the parties identify proposed witnesses by March 30, Applicants provide the following information.
To respond to the Board's questions regarding offsite (i.e., State and local) emergency planning, Applicants presently anticipate calling a witness panel consisting of Messrs. Alton B. Armstrong, Jr., Clarence L. Born, Larry J. Shiles, and Arthur C. Tate. Each of these gentle-men was previously sworn (Tr. 5494) and presented testimony on this topic (Applicants ' Exhibit 144). Statements of -
their professional and educational qualifications were received into evidence as Applicants' Exhibits 144A-D.
To respond to questions regarding onsite emergency planning, Applicants anticipate calling a panel consisting of Messrs.
Richard A. Jones and Bobby T. Lancaster. Both Mr. Jones and Mr. Lancaster were previously sworn (Tr. 5429) and QK D s D 1 E
() )(l~ J d L-^
v . - v- - #
presented testimony on this subject (Applicants Exhibit 143) .
Their statements of professional and educational qualifica-tions were received into evidence as Applicants' Exhibits -
10 (Attachment A) and 143A, respectively.
In the event that rebuttal testimony is necessary.
with respect to the Walsh/Doyle allegations, Applicants will present as a panel Messrs. Peter S. Y. Chang and John C. Finneran, Jr. These gentlemen we're previously sworn (Tr. 4772) and presented testimony in this proceeding regarding those allegations (Applicants ' Exhibits 142.and 142F). Statements of their professional and educational
- qualifications were received into evidence as Applicants' Exhibits 142A and 142B.
To the extent that matters addressed in the Board Notifications need be addressed by Applicants, some or all of the following individuals will be made available as a panel to respond to Board questions - Messrs. David H. Wade, Ronald G. Tolson, John C. Finneran, Jr., Antonio Vega and John T. Merritt. Mr. Wade has not testified in this pro-ceeding. A statement of his professional and educational qualifications was attached to his affidavit submitted with
" Applicants' Assessment of Relevance and Significance of .
Board Notifications," filed March 18, 1983. Messrs. Merritt, Tolson and Vega were previously sworn and submitted testimony in this proceeding (Tr. 789, 510). Mr. Finneran also has been sworn and testified in this proceeding as noted above.
Finally, this will reconfirm that each of the eleven Board witnesses has committed to appear and testify on April 4 without being subpoenaed.
~
Sincerely, -
~
'n.s.Eu A ^ c Nicholas S. Reynolds t ~
Counsel for Applicants cc: Service List
! HAND DELIVERED i
. . , , , _ , _ . , - . . . _ _ _ _ _ . ~ _ _ _ _ - _
. March 29, 1983
-Dqlr ETF
.g3 pa -4 A10 :29 UNITED STATES OF AMERICA
. NUCLEAR REGULATORY COMMISSION ;.
BEFORE THE ATOMIC SAFETY AND -LICENSING BOARD
.:r..<,
In the Matter of )
)
TEXAS UTILITIES GENERATING ) Docket Nos. 50-445 .
COMPANY, _et _al. ) 50-446 (Comanche Peak Steam Electric-) (Application for
. . _ . __ St.at_ ion,., Units _1 and_._2_) ) Operating Licenses)
APPLICANTS' RESPONSE TO BOARD QUESTIONS REGARDING EMERGENCY PLANNING By Memorandum and Order of March 9, 1983, the. Atomic Safety and Licensing Board (" Board") documented the results
~
of a March 8 conference call regarding matters related t'd the resumption of hearings scheduled for April 4, 1983.
During that conference call, the Board questioned whether there was any need to hold open the record for the intro-duction of final findings of the Federal Emergency Manage-ment Agency (" FEMA") regarding offsite emergency prepared-l l ness. As discussed more fully below, Texas Utilities Generating Company, et al. (" Applicants") maintain that the record need not be held open to receive such findings. ,
i In this proceeding, only Contention 22 raises issues related to offsite emergency preparedness. In response to this contention, witnesses from FEMA,provided testimony and were subject to cross-examination by all parties and l
N , I # .,*
." P
2-questioning by the Board. Such testim 6ny was based on FEMA's review of offsite emergency preparedness, including state and local emergency response plans. FEMA's continu-ing review of this area will eventually result in prepara-tion of its final findings. However, the final FEMA find-ings must, in part, be based on FEMA's review of the final
-- emergency-exercise-involving-both-offsite-and onsite emer-gency response personnel. Tr. 5723. Indeed, based on its policy (shortly to be codified), FEMA cannot issue its final findings until after review of the emergency exer-cise. 44 C.F.R. 350.8(f) (proposed), 47 Fed Reg. 36386, 36391 (August 19, 1982). See 47 Fed. Reg. at 36388, where FEMA states that the provisions of the proposed rule 44 C.F.R. Part 350 are intended to be FEMA policy until the final rule is issued. See also Tr. 5723-4, where a FEMA witness stated that the process of preparing final FEMA findings would follow that set forth in the proposed rule
. referenced above. In short, it is clear that FEMA's final findings are, in part, based on, and cannot be issued until l after the emergency response exercise now scheduled to be i conducted in October 1983.
I The NRC has promulgated regulations which address the extent of Licensing Board review required for decisions regarding offsite emergency planning issues. 47 Fed. Reg.
3-30232 (July 13, 1982). The Commission stated there that "the rule . changes clarify that the emergency preparedness exercises are not required for a Licensing Board, Appeal Board, or Commission licensing decision." 47 Fed. Reg. at
.30233. As noted above, the emergency exercise must be conducted before (and constitutes an integral part of) the L
final FEMAfiildTn~g~s . ~Thus, for this Board to await final FEMA findings before issuing a final decision on the operating license application would be contrary to these Commission regulations. Accordingly, the Board should not await issuance of final FEMA findings before rendering its decision regarding Contention 22.* ,,
Applicants are cognizant of the Licensing Board decision in Cincinnati Gas and Electric Co. (William H. Zimmer Nuclear Power Station, Unit 1), NRC , Memorandum and Order (slip op. at p. 5) (August 247 1982), where the Licensing Board stated that the Board's. findings re-garding issues in controversy involving offsite emer-gency preparedness would have to be delayed pending review of final FEMA findings. However, in that case the initial FEMA findings and testimony in support of those findings were totally inadequate and without a reasonable basis of support. Id. (slip op. at pp. 6-7).
Thus, the Licensing Board there stated that "the absence of any basis for the FEMA witnesses' opinions led this Board to discount FEMA's testimony in its initial deci-sion and for us to conclude that we would not issue an '
operating license until its final findings related to the contentions had been filed and reviewed." -Id. (slip op. at p. 7). In requiring final FEMA findings prior to making the Board's ruling regarding emergency planning contentions, the Board stated that "we wish to emphasize again that our holding is limited,to the facts of this case which, we believe, are significantly different from other emergency planning proceedings." Id. (slip op. at (footnote continued)
i -
4-Respectfully submitted,
.b Nicholas S. Reynolds DEBEVOISE & LIBERMAN 1200 Seventeenth Street, N.W.
Washington, D.C. 20036 (202) 857-9800 CobHsel for Applicadts
. March 29, 1983
(
l (footnote continued from previous page)
- p. 11). Applicants submit that in the Comanche Peak proceeding, FEMA's testimony with regard to offsite emergency preparedness is complete, comprehensive and clearly has a reasonable supporting basis. In short, circumstances which resulted in the Zimmer holding are not present here.
e
. U.NITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
TEXAS UTILITIES GENERATING ) Docket Nos. 50-445 and COMPANY, _et _al. ) 50-446 (Comanche Peak Steam Electric )_ (Application for Station, Units 1 and 2) ) Operating Licenses)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing " Applicants' Response To Board Questions Regarding Emergency Planning," in the above-captioned matter were served.upon the following persons by express delivery (*) or deposit in the United States mail, first class postage prepaid, this 29th day of March 1983, or by hand delivery (**) on the 30th day of March 1983:
- Marshall E. Miller, Esq. Chairman, Atomic Safety and Chairman, Atomic Safety and Licensing Board Panel Licensing Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C. 20555 Washington, D.C. 20555
- Dr. Walter H. Jordan Atomic Safety & Licensing Member, Atomic Safety and Board
-Licensing Board U.S. Nuclear Regulatory 881 W. Outer Drive Commission Oak Ridge, Tennessee 37830 Washington, D.C. 20555
- Dr. Kenneth A. McCollom *
- Marjorie Ulman Rothschild, Esq.
Dean, Division of Engineering Office of the Executive Architecture and Technology Legal Director Oklahoma State University U.S. Nuclear Regulatory .
Stillwater, Oklahoma 74074 Commission Washington, D.C. 20555 Mr. John Collins Regional Administrator, Chairman, Atomic Safety and Region IV Licensing Appeal Panel U.S. Nuclear Regulatory U.S. Nuclear. Regulatory Commission Commission-611 Ryan* Plaza Drive Washington, D.C. 20555 Suite 1000 Arlington, Texas 76011
e
- David J. Preister, Esq. Mr. Scott W. Stucky Assistant Attorney General Docketing & Service Branch Environmental Protection U.S. Nuclear Regulatory Division Commission P.O. Box 12548 . Washington, D.C. 20555 Capitol Station Austin, Texas 78711
- Mrs. Juanita Ellis President, CASE 1426 South Polk Street Dallas, Texas 75224 M
Nicholas % Reynolds cc: Homer C. Schmidt Spencer C. Relyea, Esq.
i