ML20069H027

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-73 Re Improperly Installed Spring Nuts in GE Supplied Power Generation Control Complex Termination Cabinets.Initially Reported on 820902.Vendor Rept Pending.Next Rept Will Be Provided by 830524
ML20069H027
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/21/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-73, NUDOCS 8303280229
Download: ML20069H027 (1)


Text

__

GULF STATES UTILITIES COMPANY POaT O F F 1 C E' f10 x 2951

  • HLAUMONT T F: XAS 77704 ARIA CODE 713 830 6631

'/

March 21, 1983 4%

/ RBG-14,651 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement  :;

611 Ryan Plaza Drive, Suite 1000 P. glW _{g p j g- -

Arlington, Texas 76011 j

Dear Mr. Collins:

I7' ' , MAR 2 31983 Ll j

.-~---- __._ a M l River Bend Station Unit 1 i

" - - I Docket No. 50-458 -

Interim Report /DR-73 On September 2, 1982, Gulf States Utilities Company (GSU) notified Region IV of a condition potentially reportable under 10CFR50.55(e) concerning improperly installed spring nuts in the General Electric Company supplied Power Generation Control Complex (PGCC) termination cabinets for River Bend Station (DR-73). GSU is awaiting GE's evaluation of this condition. An interim or final status report will be provided by May 24, 1983.

Sincerely,

/

s' h n' d

J. E. Boo er Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear-Regulatory Commission Washington, D. C. 20555 R. L. Brown (SRI) 8303280229 830321 PDR ADOCK 05000458 l S PDR l