ML20069G680
| ML20069G680 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/21/1983 |
| From: | Maurin L LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 54, W3183-00902, W3183-902, NUDOCS 8303280121 | |
| Download: ML20069G680 (1) | |
Text
I OUISI ANA 142 OR ARONDE STRHT POWER & L1GHT P O BOX 6008
- NEW ORLEANS. LOUISlANA 70174 * (504) 366 2345
ION 5vsYEr uT March 21, 1983 Voce Preskient Nucle r Upe a W3I83-0092 Q-3-A35.07.54 Mr. John T. Collins, Regional Administrator, Region IV p-. _.
U. S. Nuclear Regulatory Commission 3
611 Ryan Plaza Drive, Suite 1000
[
- ll l
Arlington, Texas 76012 i
c, MAR 2 31983 e
]sij
SUBJECT:
Waterford SES Unit No. 3 l
3 Docket No. 50-382 Significant Construction Deficiency Report No. 54
" Tube Steel (HT 16600) Laminations" Fifth Interim Report
REFERENCE:
LP&L letter W3I83-0058 dated February 17, 1983
Dear Mr. Collins:
At the present time, corrective action modifications and review are expected to be completed by May 6, 1983. A final report will therefore be submitted by May 16, 1983.
/
Very truly yours,
'(h i
.e g
,UUt@
L. V. Maurin LVM/ MAL:keh cc:
- 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8303280121 830321 PDR ADOCK 05000382 S