ML20069G632
| ML20069G632 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/25/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CSC-6527, NUDOCS 8303280108 | |
| Download: ML20069G632 (1) | |
Text
1 p-lEELNLsyre
~
m,-Lt
~. n I
CORSum8f5 Qd
.e.; f01~73-f Power Femrm-C W
I-
[MM L Company j~
Midland Project: Po Box 1963, Midland, M6 48640 + (517) 631,8650 h
fFlLE]
January 25, 1983 Mr. W. D. Shafer, Chief Midland Project Section US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI:
42*05*22*04 Serial: CSC-6527 12*32 This letter confirms a telephone conversation on January 25, 1983 between our Mr. G. Johnson and Mr.
R. Gardner of your staff, during which the installation of an additional conduit support for the Auxiliary Building underpinning in-strumentation was discussed. This conduit support installation will disposi-tion NCR No. FSO-033.
The support will clamp on outside the conduit and the cable will not be disturbed.
Mr. Gardner was contacted per the "NRC and CPCo Work Authorization Procedure." He considered this work to be minor and gave his permission to it.