ML20069G601
| ML20069G601 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/27/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CSC-6528, NUDOCS 8303280071 | |
| Download: ML20069G601 (1) | |
Text
,
CORSum8m
),
eaiticieAL_ E {F In1_I 5g]L]_I 2 tat d. _ __
Power Company m _t__
Am_i Midland Project: PO Box 1963, Midland, MI 48640 + (517) 6314650
_U[:[;
A
[_C --
J O T+ t O S L._ - - -,l nFr,TP.
January 27, 1983
'4L i
ot j
ji:lLE k(/)
Mr. W.
D.
Shafer, Chief Midland Project Section U.S.
Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT GWO 7020 FOUR POINT JACKING FOR THE FIVP File:
0485.16 UFI:
12*32 Serial:
CSC-6528 42*05*22*04 This letter is to confirm and document discussions with your Dr.
Landsman and Joe Kane with NRR regarding the loads to be applied during the FIVP four point jacking.
Based on our discussions held on January 25, 1983, Consumers Power Company agreed to in-crease the total jack load to a value-10% above the estimated weight of the structure.
Based on an estimated weight of 1715K, we would jack the structure to a maximum load of 1890K.
Based on the above noted agreement, we request your authorization to proceed with the work.
D.
B. Miller Site Manager DBM/RMW/dmw t
8303280071 830127 PDR ADOCK 05000329' A
PDR FEB 2 M3