ML20069G538

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to QA Program for Design & Const.W/O Encl
ML20069G538
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 03/23/1983
From: Seiken S
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SLNRC83-017, SLNRC83-17, NUDOCS 8303280022
Download: ML20069G538 (1)


Text

SNUPPS Standardized Nuclear Unit Power Plant System 5 Choke Cherry Road Rockwine, Maryttad 20850 (301)869 8010 March 23,1983 SLNRC 83-017 FRE: 0491.3.1 SUBJ: SNUPPS QA Progr4,i for Design and Construction Mr. Harold R. Denton, Director Office of Mclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dockets: STN 50-482, STN 50-483

Dear Mr. Denton:

By copy of this letter, we are forwarding to tne NRC, Attention Terry' Harpster, Chief, Quality Assurance Branch, a copy of Revision 6 to the subject QA program document. This revision provides a routine update of the structures of the SNUPPS project organizations.

The changes described in the enclosure do not reduce the commitments on the part of either SNUPPS utility to the QA Program description for safety-related activities previously accepted by the NRC.

Controlled copies o' this revision will be forwarded to regional I/E offices in accordance with standard distribution practices.

Very truly yours, S. J. Seiken M

RPW/dck/8bl6 Enclosure cc: Terry Harpster, USNRC w/ encl.

G. L. Koester, KGE w/o ooOl D. T. McPhee, KCPL w/o p

D. F. Schnell, UE w/o H. W. Poberds, USNRC/WC w/o J. H. Neisler, USNRC/ Cal w/o 8303280022 830323 DR ADOCK 05000482 PDR

_. _ _.. _ - _ _