ML20069F647
| ML20069F647 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/08/1982 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20069F652 | List: |
| References | |
| NUDOCS 8209280184 | |
| Download: ML20069F647 (6) | |
Text
"#
UNITED STATES y-r NUCLEAR REGULATORY COMMISSION h
WASHINGTON, D. C. 20555
. E o-
*A
- '~
NORTHERN STATES POWER COMPANY DOCKET N0. 50-282 PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 57 License No. DPR-42 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northern States Power Company (the licensee) dated August 6, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;
~
C.
There is reasonable assurance (1) that the activities authori;:ed by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements j
have been satisfied.
l Cortiflod 1
B209280184 820908 l
PDR ADOCK 05000282 l
P PDR i
2-4 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-42 is hereby amended to read as follows:
'(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised.through Amendment No. 57, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
' ')
'V.K::256,Iw </
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: September 8, 1982 4
b v
v
-st 9, -
-7 r -
c
/ p argo UNITED STATES "3
8
' t, NUCLEAR REGULATORY COMMISSION 2, (A
,E s
WASHINGTON, D. C. 20555
%,...../
NORTHERN STATES POWER COMPANY DOCKET NO. 50-306 PRAIRIE ' ISLAND NUCLEAR GENERATING PLANT UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 51 License No. OPR-60 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northern States Power Company (the licensee) dated August 6, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; I
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part l
51 of the Commission's regulations and all applicable requirements have been satisfied.,
l l
DESIG ED ORIGINAL Cortified By 7fl N'N O
=
, I 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-60 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 51, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendnent is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
.f)
( (..
,,r L ib Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 8, 1982 i
I ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT N0. 57 T0 FACILITY OPERATING LICENSE NO. OPR-42 AMENDMENT No. 51 TO FACILITY OPERATING LICENSE NO. DPR-60 DOCKET NOS. 50-282 AND 50-306 Revise Appendix A as follows:
Remove Pages Insert Pages Table TS.4.1-2A Table TS.4.1-2A t
e i
i i
~
TABLE TS.4.1-2A MINIMUM FREQUENCIES FOR EQUIPMENT TESTS FSAR Sect.
Test Frequency Reference 1.
Control Rod Assemblies Rod drop times All rods during each 7
of full lenth refueling shutdown or rods following each removal of the reactor vessel head: affected rods following maintenance on or modification to the control rod drive system which could affect performance of those specific rods la. Reactor Trip Breakers Open trip Monthly 2.
Control Rod Assemblies Partial move-Every 2 weeks 7
ment of all rods 3.
Pressurizer Safety Set point Each refueling 4
Valves shutdown 4.
Main Steam Safety Set point Each refueling 10 Valve shutdown 5
Reactor Cavity Water level Prior to moving fuel assemblies or control rods and at least once every day while the cavity is flooded.
I 6.
Pressurizer PORV Functional Quarterly Block Valves 7.
Pressurizer PORVs Functional Every 18 months 8.
Deleted 9.
Primary System Leakage Evaluate Daily 4
^
10.
Deleted 11.
Turbine stop valves, Functional Monthly (1}
10 l
governor valves, and
[
' intercept valves.
(Part of turbine overspeed protection.)
12.
Deleted i
I (1)
This test may be waived for end of cycle operations when boron concentrations are less than 150 ppm provided more than 60 days do not elapse following the last test.
Prairie Island Unit 1 Amendment No. 26, 47, 49, 57 Prairie Island Unit 2 Amendment No. 29, 41 43, 51 3