ML20069F379
| ML20069F379 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/02/1994 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20069F383 | List: |
| References | |
| NUDOCS 9406080237 | |
| Download: ML20069F379 (2) | |
Text
a t
Ststlen Suppsrt Ospirtmsnt 10CFR50.90
=
I)ECO ENERGY
==9g= L,,
965 Chesterbrook Boulevard Wayne, PA 19087-5691-June 2,1994 Docket Nos. 50-277 50-278 Ucense Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification Change Request 93-24, Supplement 1
Reference:
Letter from G. A. Hunger, Jr. to USNRC Document Control Desk dated April 7,1994
Dear Sir:
PECO Energy Company (PECO Energy) hereby submits Technical Specification Change Request (TSCR) No. 93-24, Supplement 1, in accordanc 3 with 10CFR50.90, requesting a change to Appendix A of the Peach Bottom Facility Operating Licenses. The proposed changes, originally submitted by Reference 1, concern the addition of an electrical tie line from the Conowingo Hydroelectric Power Station to Peach Bottom Atomic Power Station (PBAPS).
This supplement is required because changes to page 220 for Units 2 and 3, were issued April 5,1994 by Technical Specification Amendment numbers 187 and 192, respectively. The changes approved by these Amendments were not reflected in the page 220 submitted by Reference 1. This supplement does not affect the analysis or information provided in support of finding no significant hazards submitted in Reference 1. contains the revised Technical Specification pages.
Very truly yours,
.0.h
,f.
f G. A. Hunger, Jr., Director
' Ucensing cc:
T. T. Martin, Administrator, Region I, USNRC g'g g W. L Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania T
9406080237 940602 -
TI PDR ADoCK o500o277
,bl P-PDR
._1 V
.-4 GOMMONWEALTH OF PENNSYLVANIA ss.
COUNTY OF CHESTER 1
W. H. Smith, Ill, being first duly sworn, deposes and says:
l That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the attached Supplement 1 of the Technical Specifications Change Request (Number 93 24) for Peach Bottom Facility Operating Ucenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set
^
forth therein are true and correct to the best of his knowledge, information and belief.
Vice President Subscribed and sworn to l
before me this A day of
" = "
1994.
1 l
3y No/ /
h tary Public NanalSd Enco A Sarmyt Natay %
Myc s.
Eo July 995
-. !