ML20069F152
Jump to navigation
Jump to search
| ML20069F152 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/17/1983 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20069F108 | List: |
| References | |
| NUDOCS 8303220339 | |
| Download: ML20069F152 (1) | |
Text
.
o OPER ATING DAT A REPORT DOCKET NO. 50-317 DATE 3/17/83 COMPLETED BY tlaine Latito 1ELEPHONE ~I301)787-5.363 OPE RATING STAT US Calvert Cliffs #1 hotes Revision
- 1. Ur.i: Name:
January 1983
- 2. Rerorting Period.
- 3. Li:ensed Thermal Pow er (Mhti.
- 4. Nameplate Rating (Grms MWe t
- 5. Desi a Elc trical Ret.ng (Net MWel:
- 6. hlasimum Dependab:e Capacity (Gross Mbes:
- 7. 4tasimum 13ependable Capacity (Nc MWel:
- 8. If Charges Occt.:in Capacity R tings tite.m Nunter 3 Through 7) Since Last Report.Gre Reasons.
- 9. Power Lese! To btich He.tri:ted. if An.s (Net Mbcl:
- 10. Itesson, For Restricti".. li Any:
This Month Yr..to Date Cs. mal:.tise
- 11. Ilours in Reporting PerioJ
- 12. Numt,er Oi flotirs Reactor Was Critic:1
- 13. Reactor Res.:ne $5ertown Haurs
- 14. Houn Generator On Line
- 15. Unit Resene Sheldown flours
- 16. Gross Thermal Energy Gererated (MWH1
- 17. Gross Electrical Enct,y Generated (MWill 639,387
_ 42,240,330 639,387
- 18. Net Electrical Energy Generated (MWHi
- 19. Omt Senice Factor
- 20. Unit Asailability Facit.:
- 21. Unit Capacity Facter IUsing MDC Neti
- 22. Unit Capaciry factor IUssa; DER *ierl
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled O.et. Nest 6 Montm (Type. Date.snJ Duration of Eacht:
- 25. If Shut Down At End Of Report Feriod Estimated Date of Startup:
- 26. Unit 3 In Test Status (Prior eo Commercial Operation):
Forecast Achieved INITIA L CRITICALITY INITl 4 L ELECTRICITY COMMERCIAL OPER ATION (w/~? )
8303220339 830317 PDR ADOCK 05000317 R