ML20069E768
| ML20069E768 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 02/22/1983 |
| From: | Wells D DETROIT EDISON CO. |
| To: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20069E766 | List: |
| References | |
| EF2-61-961, NUDOCS 8303220184 | |
| Download: ML20069E768 (3) | |
Text
..
Donald A. Wells G
E S?il?$Y """
Edison ElisPS-February 22, 1983 EF2 - 61,961 Mr. J. A. Hind U. S. Nuclear Regulatory Commission Region III
-799 Rosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Hind:
Reference:
Enrico Fermi Atomic Power Plant, Unit 2
.dRC Docket No. 50-341
Subject:
Region III Inspection Report No. 50-341 (82-21) (DEPOS), January 21, 1983 The response to each item in the referenced Inspection Report is delineated below:
- 2. Licensee Actions a.
Open Item (50-341/78-06 Terrestrial Monitoring Program All reports associated with this program will be available in final form within three months of the date of this letter, b.
Open Item (50-341/80-07-01; 82-04-01) - QA Audits Attached is a copy of a letter, EF2-61,237, December 29, 1982 closing the June 1979 audit and a copy of the QA audit of the NUS facili-ties in December 20-22, 1982.
e.
Open Item (50-341/82-04-02) - REMP procedures, NUS Laboratory Controlled copies of the NUS work instructions used in their Pittsburgh laboratory were received in November, 1982.,
These work instruc-tions will be entered into the Edison approval schedule according to draf t Technical Specifi-cation, Section 6, Administrative Conrols.
8303220184 830318 FEB 281983 DR ADOCK 05000341 PDR
Mr. J. A. Hind February 22, 1983 EF2 - 61,961 Page 2 f.
Open Item (50-341/82-04-04) - FSAR Section 11.6 Since the information contained in FSAR Section 11.6 is covered in the appropriate Stan-dard Technical Specifications in Chapter 16 and the ODCM, both of which are in draft form and submitted to the NRC Staff, it is no longer appropriate to incorporate it in Section 11.6.
Therefore, it is Detroit Edison's intention to delete Section 11.6 in its entirety.
The exact sample locations for the program are in Tables 3 0-1 and 3 0-2 of the draft Offsite Dose Calculational Manual (ODCM) as stated in the draft Technical Specifications. The draft ODCM was submitted to the NRC Staff late December 1982.
Tables 3.0-1 and 3 0-2 of the ODCM are attached for your information.
g.
Open Item 50-341/82-04-05) - Quarterly REMP reports Under the preoperational REMP there is no requirement for quarterly reports.
These are presently generated as contract requirements between Edison and NUS.
As of 1983, the reporting requirements for the contractor will be those listed in the draft Technical Specifications under Section 6.9.1.10, and will no longer include quarterly reports.
A copy of the 1982 Annual Report will be for-warded to Region III when it is received from NUS.
h.
Open Item (50-341/82-04-06) - Management Controls Management controls and procedures are being initiated and will be in place by April 1, 1983 J.
Open Item (50-341/82-04-09) - Field Sample Collection Forms A new multipart form and procedure has been developed by NUS for field sample collection data.
This procedure and form becomes effective March 1, 1983 One part of the form is mailed to the Environmental Engineer at the Fermi 2 site subsequent to collection.
A Mr. J. A.-Hind February 22, 1983 EF2 - 61961 Page 3 Should you have any questions regarding the above,
- please contact Mr. George Trahey, (313) 586-5036.
Very.truly yours, DAW /EFM/jl cc:
Mr. Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Bruce Little, Senior Resident Inspector U. S. Nuclear Regulatory Commission 7450 North Dixie Highway Newport, Michigan 48166 a
d f