Interim Deficiency Rept Re Incomplete Hydraulic Analysis of Control Rod Drive Sys Piping.Initially Reported on 821228.Field Verification of Installed Hardware Initiated. Followup Rept Will Be Submitted by 830630
ML20069E326
Person / Time
Site: Zimmer
Issue date: 03/08/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2294, NUDOCS 8303220008
Download: ML20069E326 (2)


Text

t THE CINCINNATI GAS & ELECTRIC COMPANY sg CINCINN ATI. OHIO 45201 March 8, 1983 QA-2294 E. A. BORGMANN SENIOR VICE PRESIDENT U.S. Nuclear Regulatory Commission Region III Roosevelt Rd.

Glen Ellyn, Illinois 60137 Attention:

Mr. J. G.

Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) - ITEM M INCOMPLETE HYDRAULIC ANALYSIS AT CRD PIPING DOCKET NO. 50.358, CONSTRUCTION PERMIT NO. CPPR-88, W.O.

57300, JOB E-5590, FILE NRC-8, M-32 Gentlemen:

This letter constitutes a follow-up to our report, QA-2154',

dated December 28,1982, concerning the subject deficiency.

CG&E is continuing its ef forts to resolve Stop Work Order 80-14, and the December 24, 1980 NRC Immediate Action letter for work on the Control Rod Drive System (CRD).

A preliminary analysis by Sargent & Lundy (S&L) has determined that the installed piping geometry will be within analysis tolerances of the present CRD system geometry.

Based on this, CG&E has determined that the installation meets ASME Code stress limitations.

Review of Reactor Controls Incorporated (RCI) documentation and procedures has been completed with all deficiencies identified on Nonconformance Reports (NR) and Document Deficiency Notices (DDN).

Catalytic, Inc. is initiating a field verification of installed hardware, after which the system will be ready for the support modifications prescribed by the hydraulic re-analysis.

A follow-up report will be submitted by June 30, 1983.

h 0

p S

fEO]

,Ptga 2 10CFR50.55(o) - Itsu M-32

- Mnrch 8, 1983 QA-2294 We trust the above will be found acceptable as a follow-up report concerning the subject deficiency.

Very Truly Yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. BORGMANN Senior Vice President EAB/FKP/apc cc: