ML20069D847

From kanterella
Jump to navigation Jump to search
Amend 71 to License DPR-51,revising Tech Specs to Support Operation at Full Rated Power During Cycle 6
ML20069D847
Person / Time
Site: Arkansas Nuclear 
(DPR-051)
Issue date: 03/10/1983
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Arkansas Power & Light Co
Shared Package
ML20069D851 List:
References
DPR-51-A-071 NUDOCS 8303210008
Download: ML20069D847 (29)


Text

- _ - _ - - - - - - - - -

h NUCLEAR REGULATORY COMMISSIGN g

s.

t WASHINGTON. D. C. 20$55 ov...../

ARKANSAS POWER & LIGHT COMPANY

~

DOCKET NO. 50-313 ARKANSAS NUCLEAR ONE - UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amenda nt No.T 1

(

~

License No. DPR-51 1.

The Nuclear. Regulatory Comission (the Comission) has found that:

A.

The application for,emendment by Arkansas Power and Light Company (the licensee) dafe'd-November 19, 1982, as supplemehted November 23, 1982, January 27, 1933 and February 11, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in confomity with the application, the provisions of-the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health

~

and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

ThL issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amndment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requiremnts have been satisfied.

8303210000 830310 DR ADOCK 05000 l

s 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment te this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-51 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.71, are hereby incorporated in the license. The licensee shall operate the facility in accordance with +he' Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

~

FOR THE NUCLEAR RE LATORY COMMISSION

~$

(

Jo FaStolz, Chief erating Reactors Branch #4 Division of Licensing ' "~ ~ ~

Attachmcr.t:

Changes to the Technical Specifications Date of Issuance: p.AR 10 1933

~

h O

i s

d e

l

e r

ATTACEMENT TO LICENSE AMENDMENT NO. 71 FACILITY OPERATING LICENSE NO. DPR-51 DOCKET NO. 50-313 Replace the following pages of t,he Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment -

number and contain vertical lines indicating the ares af change.

Remove Insert iii iii*

iv iv y

y 9b 9b 14b 14b 35a 35a 48b 48b 48b1 48b1 48b2 48b2 48b3 48b3 48c 48c 48cl 48c1 48c2 48c2 48c3 48c3 48c4 48c4 48c5 48c5 48c6 40c6

~

48c7 48c7 48d 48d i

48dl 48dl 48d2 48d2 4Sd3 48d3 48f 48f 489 48g 48h 48h 48i 48i

  • 0verleaf page provided to maintain document completeness.

e

4 a

I 1

INTR 3DUcrT01 These Technical Speci'ficatices apply to Arkansas Nuclear One, thit 1 and are in accordance with the requirements of 10 CFR 50, Section 50.36.

Se bases, which provide technical supnort or reference the pertinent FSAR sectice for technical support of the individual specifications, are included for infor=aticnal purposes and to clarify the intent of the snecificatica.

3ese bases a:t not part of the Technical Specifications, and they do n6t constitute lirdtaticas or requirements for the licensee.

e

  • e et e

M 45 6

e O

=

4 iii l

l L

LIST OF FIGURES o ge Number Title a

2.1-1 CORE PROTECTION SAFETY LIllIT 9a

~

2.1-2 CORE PROTECTION SAFETY LIMITS 9b 2.1-3 CORE PROTECTION SAFETY LIMITS

, 9 c-

2. 3-1,

PROTECTIVE SYSTEf1 MAXIMUM AL* 0WABLE SETPOINT :

14a 2.3-2 PROTECTIVE SYST'EM MAXIMUM ALLOWABLE SETPOINTS 14b 3.1.2-1 REACTOR COOLANT SYSTEtt HEATUP AND C00LDOWN LIMITATIONS 20a 3.1. 2-2 REACTbR C00LAhiT SYSTEM NOR!1AL OPERATION-HEATUP LIMITATIONS

'20b 3.1. 2-3 REACTOR C00LANT'5 5TEli, NORMAL OPERATION-COOLDOWN LIMITATIONS 20c 3.1.9-1 LIMITING PRESSURE VS. TEMPEPATURE FOR CONTROL ROD DRIVE OPERATION WITH 100 STD CC/ LITER H O 33 2

3.2.1 BORIC ACID ADDITION TANK VOLUME AND CONCENTRATION VS. RCS AVERAGE TEMPERATURE 35a 3.5.2-1A R0D POSITION LIMITS FOR FOUR-PUMP OPERATIO*; FROM 0 TO 60 EFPD-48b ANO-1, CYCLE 6

-3154-1B R0D POSITION LIMITS FOR FOUP onvo DPERATION FROM 50 TO 200+ 10

~

EFPD-ANO-1, CYCLE 6 48bl 3.5.2-1C R0D POSITION LIMITS FOR FOUR-PUMP OPERATION FROM 200 + 10 48b2 TO 350 + 10 EFPD-ANO-1, CYCLE 6 3.5.2-lD ROD POSITION LIMITS FOR FOUR-PUMP OPERATION AFTER'350 + 10 EFPD-All0-1, CYCLE 6 48b3 3.5.2 *cA ROD POSITION LIMITS FOR THREE-PUMP OPERATION FROM 0 TO 60 48c EFPD-Atl0-1, CYCLE 6 3.5.2-2B ROD POSITION LIMITS FOR THREE-PUMP OPERATION FR0!! 50 TO 200

? 48cl

+ 10 EFPD-ANO-1, CYCLE 6 3.5.2-2C R0D POSITION LIMITS FOR THREE-PUMP OPERATION FROM 200 + 10 48c2 TO 350 + 10 EFPD-ANO-1, CYCLE 6 a.5.2-2D ROD POSITION LIMITS FOR THREE-PUMP OPERATION AFTER 350 + 10 EFPD-ANO-1, CYCLE 6 48c3 iy Amendment No. K 7 1

3.5.2-2E ROD POSITION LIMITS FOR WO-PUMP OPERATION FROM 0 TO 60 EFPD-AN0-1, CYCLE 6 48c4 3.5.2-2F ROD POSITION LIMITS FOR WO-PUMP OPERATION FROM 50 TO 200 +-

48c5 10 EFPD-AND-1, CYCLE 6 3.5.2-2G ROD POSITION ' LIMITS FOR TWO-PUMP OPERATI0tl FROM 200 + 10 TO 350 + 10 EFPD-All0-1, CYCLE G 48c6 3.5.2-2H ROD POSITION. LIMITS FOR TWO-PUMP OPERATION AFTER 350 + 10 EFPD-ANO-1, CYCLE 6 48c7 3.5.2-3A OPERATI0ilAL POWER IMBALANCE EtiVELOPE FOR OPERATION FROM 0 TO 60 EFPD-ANO-1, CYCLE 6 48d 3.5.2-3B OPERATIONAL PODER IMBALANCE ENVELOPE FOR OPERATION FROM 50 TO 200 + 10 EfPD-ANO-1, CYCLE 6 48dl 3.5.2-3C OPEPATIONAL PQWER IMBALAt1CE ENVELOPE FOR OPERATION FROM 200 +

10 TO 350 + 10 EFPD-ANO-1, CYCLE 6 48d2 3.5.2-3D OPERATIONAL POWER'.-IMBALANCE ENVELOPE. FOR OPEPATION AFTER 350

+ 10 EFPD-ANO-1, CYCLE 6 48d3 3.5.2-4 LOCA LIMITED MAXIMUit ALLOWABLE LIflEAR HEAT RATE 48e 5.2-4A ASPR POSITION LIMITS FOR OPERATION FROM 0 TO 50 EFPD-ANO-1, CYCLE 6 43f 3.5.2-4B ASPRPOSITION'LiMITSFOROPERATIONFROM50TO200+10EFPD-

~

ANO-1, CYCLE 6 489

- 3.5.2-4C APSR POSITION LIMITS FOR OPERATI0tl FROM 200 + 10 TO 350 +--

43h

~~'

10 EFPD-ANO-1, CYCLE 6 3.5.2-4D APSR POSITION LIMITS FOR OPERATION AFTER 350 + 10 EFPD-Al10-1, CYCLE 6

~~

481 3.5-4-1 INCORE INSTRUMENTATION SPECIFICATION. AXIAL IMBALANCE INDICATION 53a 3.5.4-2 I!1 CORE INSTRUMENTATION SPECIFICATION RADIAL FLUX TILT INDICATION 53b 3.5.4-3 INCORE INSTRUMErlTATION SPECIFICATION 53c g

4.2-1 t%NAGEMEt1T ORGANIZATION CHART 119 6.2-2 FUNCTIONAL ORGANIZATION FOR PLANT OPERATION 120 y

Anendment No. &f,71 1

o

(

dore" Protection Safety I.i':: lits Figure 2.1-7 Inermal Power Level, 5 FP i

- 120

(-42.56,112)

(24.64,112) 1125 FP N1 = 2.90 3 l

ACCEPTABLE l

~ '2

~

4 PUMP I

OPERATION l

- 100 1

I (38.08,95.1)

(-48.39,95.1) 88.745 FP g

i ACCEPTABLE l

l l - A AND,3 PUMP

~

80 l

l l

OPERATION

(-48.39,71.64)

-d (38.08,71.84)

[

l l

62.115 FP l

UNACCEPTABLE

- 60

] UNACCEPTABLE OPERATION l

ACCEPTABLE 4,3 AND 2 PUNP l OPERATION l

l OPERATION l

l

(-45.39,45.21) l l

(38.08,45.21)

- 40 I

i j

~

i l

I l

l

- 20 I

4 pl ill 5l j ::

u is is si el I

i 1

I I

lt 60

-40

. 20 0

20 40 60 Reactor Power imoalance, 5

cendment Ho. X,R F' M N # '7 1 9b

3 I

ae e

a o z.

o.

m o2 n

es mo (D

mn 2

3-TV1 e

-< a

- -4 6-a EE F-m m

m n

^

S CD e

m U

N A

A m

=

o BI = -34

~

~ ^

v m

w.

e-8 g

_m 4

i a

m

-m o

.un m

m m

w P

A et to

==*

i M

B2 * -IO b

is! '

O l

0

~

n go y

R a

n ACCEPTABLE ACCEPTABLE ACCEPTABLE y

2,3 & 4 PUMP 3 & 4 PUMP 4 PUMP O

OPERATION OPERATION OPERATION o

o a

n N

MO a

a a

a a

a o o g :u

=_

c c r-B3 = +B o"

o" o"'

o" "c

" O

=

o o

ex 2

s a

g

.m p n

w [i

.=

=

o L

L

=

^

b no m

o r

B4 = +25 v"

o o

w g.

m x -

^

N N

N 8

O

=

.=

w a

m S

o E.

'm i

o2 m

m o

4 ga ma v

O A

Mo N

.fs v

v 3-m m

-- g o ui rt

- -4 (A

C3 3=

Z CD t--

e O

o l

Boric Acid Addition Tank Volume and Concentration

~

Requirements Vs RCS Average Te=perature Figure 3.2-1

)

7000 OPERATION ABOVE AND TO THE LEFT OF THE CURVES IS ACCEPTABLE 8700 PPM 6000 9500 PPM 10,000 PPM

~

5000

  1. 0 12,000 PPM

~ ~ Ti g

4000 O

~

3 u

]

3000 I

E

~

2000 TEMP. F REQUIRED VOLUME, GAL.

8700PRd 9500 PPM 10,000 PPM 12,000 PPM 579 6115 5568 5274 4354 532 5184 4720 4470 3689 55) 4375 3S34 3773 3115 1000 400 2358 2156 2042 1688 300 981 E94 647 73) 200 0

0 0

0 0

200 300

' 400 500 600 700 800 RCS Average Temperature, F Amendment No.EIffd7M71 35a

Rod Position Limits for Four-Pur:p Operation From 0 to 60 EFPD - ANO-1. Cycle-6 Figure 3.5.2-1A 110 (270,102)

(300,102)

(176,102) c a

100 (270,82) 90 SHUT 00tN MARGIN LIMIT P0fER LEVEL

~

CUTOFF 80 (258,80) 70 OPERATION E

OPERATION IN THis RESTRICTED 3 60

- REGION IS NOT g

ALLOWED (338:50)

(175,50) 3 50 e

PERMISSIBLE OPERATING 40 2~

REGION E

30 20 (57,15) 10 '_

~

(0,8) 0

/

i i

i G

20 40 60 80 100 120 140 LEO 180 200 220 240 260 280 JD0

~. - -

,0 20 4p 6,0 8,0 1,00 GROUP 7 0

29 40 6,0 8p 10,0 g

2,0 4p 6,0 8,0 190 Roa inaex, 5 50 GROUP 5 l

i Amendment No. Q,pfffg,71 48b

Red Position Limits for Four-Pump Operation Free 50 to 200.2 10 EFPD - ANO-1,-Cycle 6 Figure 3.5.2-1B 110 1

(176,102)

(270,102)

>(300,102) 100 c

eg SHUT 00rN MARGIN LIMIT POWER LEVEL CUTOFF (258,80)

EO E

P TION

['a OPERATION IN THIS RESTRICTED REGION IS NOT

EO ALL0 RED a

(11,8,50)

(175,50)

f. 50 E

40

/.

30 PERMISSIBLE OPERATING REGION 20 (57,15) 10,-

(0.8) g 0

20 40 SG 80 100 120 140 160 180 200 220 240 260 280 300 9

20 4,0 6,0 8,0 1,00 GROUP 7 0

2,0 4,0 ' 6,0 8,0 100 GROUP 6 0

2,0 4,0 60 8,0 1,00 GROUP 5 Roo inces, f, 10 e

Amendrer.t No. I,JI#fM,71 48bl e

Rod Position Limits for Four-Pu=p Operation From 2001 10 tc> 350 2 10 EFPD - 130-1, Cycle 6 Figure 3.5.2-1C llo (218.102)

(270,102)

(300,102) 100 1

,a 90 P0tER LEVEL CUTOFF 270,921 80 RESTRICTED (258,80)

SHUTODIN MARGIN LIMIT REGION 70

)

~

E OPERATION IN THIS' 60 3

REGION IS NOT ALLOIED o

50 (157.50)

(175,50)

PERWISSIBLE g 40 OPERATING a

REGION 30 20 f

10 (78,15)

'(0.7) 0 e

i 0

20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 p

20 4,0 6,0 80 100 GR0t? 7 p

20 40 60 8,0 10,0 e

i GROUP 6 O

2,0 4,0 60 80 100 GROUP 5 Roa incer, r0 a

(

l L.

I L

Am nd. ment flo.,g g, g g,7 7 48b2

,<-,-ee-

Rod Position.. Limits for Four-Pucp. Operation After 350 i 10 EFPD - ANO-1, Cycle 6 Figure 3.5.2-1D 110 (265,102)

(300,t02) 100 (227,102) 3 POWER 90 LEVEL (260,92)

SHUT 00tN MARGIN LIMIT CUT 0FF 30 (225,80)

~

70 OPERATION IN TH15 60 REGION IS NOT ALLORED s

S 50 (156,50)

(175,50)

.- 40

' 'Il PERMISSIBLE 30 OPERATING REGION

,0 4

10 J80,15)

I(8SI 0

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300

~

0 2,0 40 6,0 8,0 1[0 GROUP 7 0

2,0 40 6,0 8,0 1,00 I

GROUP 6 0

20 40, G,O 8,0 tp0 I

GROUP 5 Rea locex, 5 to knendment flo. gj8771 r

=

Rod Position. Limits for Three-Pu=p. Operation From 0 to*60 IFPD - ANO-1, Cycle'6' Figure 3.5.2-2A 110 100 90 (176,77)

(250,77) 80 70

-SHUTDOWN MARGIN LIMIT 0PERATION j

RESTRICTED g 60

=

OPERATION IN.TlilS REGION IS NOT PERMISSIBLE o 50 OPERATING ALLOWED

~ ~ T; REGION

~.(118,32) g 40 (134,38) a-30 20 10 (57.11)

(0.6)

~"

Q f

I e

f I

f f

f f

f f

f I

i 0

20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0

20 40 60 80 100 I

f f

f f

f e

GROUP 7 i

0 20 40 60 80 100 e

f f

f f

e 6

9 2,0 49 6,0 Sf ly0 Roa incer, 5 WO GROUP 5 Amendment flo. 27#,MZ 71 48c

Rod Position Li=its for Three-Pucp Operation From 50 to 200 2 10 EFPD - A50-1,' Cycle 6 Figure 3.5.2-2B 110 100 90 (250,77) 80 (178,77) 70 SHUTOOWN MARGIN LIMIT OPERATION E 60' RESTRICTE M

OPERATION IS THIS 50 REGION IS NOT AllatED o

. 40 (118,38) y (134,38)

E 30 PERWISSIBLE OPERATING REGION 10 (57,11) 0 O

20 40 60 80 100 120 -140 160 180 200 220 240 260 280 300 0

20 40 60 80 100 l

I f

f I

f f

l GROUP 7 0

20 40 60 80 100 0

I t

f i

t G OUP 6 0

20 40 E3 80 100 Roa Inder, 5 10 GROUP 5 Amendment No.J.T,%gg71 48c1

Rod Position-Limits for Three-Pu.p Operation From 200 2 10 to 350 2 10 ETPD

.MO-1 Cycle 6 Figure 3.5.2-2C 110 100 90 80 (213,77)

(250,77)

~

SHUTDOWN 70 MARGIN 1.!MIT E

OPERATION IN THIS REGION

= 60 IS NOT ALLOWED g

4 g

g

% 50

-?)

'- 4d 3

(157,38)

PERNIS$18LE OPERATING 30 REGION 20 r

10 (73,11)

~

0

' -~' '

O 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0

20 40 80 80 IGil i

f f

f a

_f GROUP 7 0

2,0 4p 6,0 8,0 100 GROUP 6 0

2,0 4f 6,0

{0 1,00 Rao,inces, 5 to GROUP 5 1

o.

m Amendment I;o.)fg,[M,71 4Sc2

a Rod Positiop Iimits for Three-Pg:p Operation Atter 350 2 10 EFPD - A:;0-1, Cycle 6 Figure 3.5.2-2D 110 100 90 60 (227.77)

SHUTDOWN MARGIN 70

=

OPERATION IN THIS REGION LIMIT 13 NOT ALLORED y

60 a

o 50

  • ~~ ~~}

J 40 (156,38)

PERNISSIBLE 30 OPERATING REGION 20 10 J

(0,5)

(80,11)

' ~ ~

0 0

20 ~~ 40 60 80 100 120 140 160 _1 0 200 220 240 260 280 300 0

20- 40 60 80 100 f

i i

I I

I GROUP 7 l

0 20 40 60 80 100 I

e I

i f

f i m.

's GROUP 6 0

20- 40 60 80 100 r

e i

e i

e i

Roa incer,f, WO GROUP 5 s

\\i s

Anendmat.*o.,~Tg,7 }

4Sc3

.44

.m_-

g

Rod Position Limits for Two-Pu=p Operation From 0 to 60 EFPD 3 ANO-1, Cycle 6 Figure 3.5.2-2E Il0 100 90 80 70

~

C m

OPERATION RESTRICTED 3 60 N

81,52)

OPE T10N IN THIS (176.52) 50 REGIONJiROT SHUTDOWN ALLOWE0

  • NARGIN O 40 l.!MIT j

PERiflSSIBLE 30 OPERATING REGION (118,26) 20 10 -( 0, 5)

'(57,8)

O i

e i

e i

0 20 ou 60 80 100 120 140 160 180 200 220 240 260 280 300 y

2p 4,0 6p 8,0 10,0

'l 0

20 40 60 80 100 I

I I

I g

Group 6

,0 30 j0 60 0

100 Roa Inanz, 5 3D i

GROUP 5 I

l

/tundr:ent I.'o. Z71 48c4

4 Rod Position Limits for Two-Pu.p Operation From 50 to,200 2 10 EFPD - ANO-l Cycle 6 Figure 3.5.2-2F 110 100 S'O 80

~

10

[0PERATIONRESTRIOTED OPERAil0N IN THIS

=

[ 60 REGION IS NOT Al.

EO (176,52)

(III,52) 50 SHUTDOWN MARGIN LIMIT 40 PERMISSIBLE a-3g OPl RATING (118,26)

REGION 20 10 (57,8) 0

( 0,5 ),

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 0

20 40 60 80 100 t

t t

t i

GROUP 7 0

20 40 60 80 100 t

t i

I f

f 0

20 40 60 80 100 e

i i

e i

i Roa index, 5 10 GROUP 5 Mendment No.X71 48c5

i Rod Position Li=its for Two-Pu=p Operation From 200 2 10 to.350 2 10 EFPD - ANO-1,- Cycle 6 Figure 3.5.2-2c 110 100

.i 90 80 I

70 C

=

60 (219.52) 50 SH'JTDOWN

^

MARGIN

,,=

OPERAil0N IN TH193REGl0N LIMIT a

~

f.

NOT ALLOWED PERiflS318LE f.30 OPERATING (157,26)

RANGE 20

~

10 (0.4) a (78,8) 0 i

~

0 20 40 60 80 100 120 140 160 180 200.220 240 260 280 300 0

20 40 60 80 100 t

I f

g g

g GROUP 7 l

0 20 40 60 80 100 I

I f

f l

p 2,0 4,0 q0 8,0 100 GROUP 5 Roa inoes, s 30 Amendment flo.$ 1 i

48c6

Rod Position Li=its for Two-Pu=p Operation After 350 2 10 EFPD - ANO-1, Cycle 6 Figure 3.5.2-2H 110 100 90 80 70 g

60 5

(227,52)

^

E"'

50

~

OPERATION IN THIS SHWDOW REGIONISNOTAkthED

$f" 40 PERNISSIBLE OPERATING j

30 (156,26)

REGION S

20 10

' ( 80, 8 )

0 8

I f

f I

i t

i i

~

0 20 40 60 80 100 120 14C 160 180 200 220 240 260 280 300 y

2,0 4,0 6,0 80 100 GROUP 7 0

20 40 60 80 100 t

8 I

I-t t

t l

GROUP 6 0

20.40 60 80 100 i

f I

f I

t Roa incer, 5 v0 GROUP 5 48c7 Amendment flo. Ag71

a Operational, Power Imb'alance Envelope for Operation From 0 to 60 EFPD - ANO-1, Cycle 6~ '

Figure 3.5.2-31.

. 110

(- 17. 5,102 ) C O(20,102) 100

(-17.5,92)

(20,92)

PERMI13!BLE CPERATING 8 0 (32,80)

(-26,80)

.70 RESTRICTED RESTRICTED.

^

REGION

=

REGION

=

60 3

~.

n 50 C3 m

[-

40

=

., 3 0 20

~~

10 I

I l

I I

I I

I I

-50

-40

-30

-20

-10 0

10 20 30 40 50 Axial Power Imbalance, %

i L.

be Amendmenttio.fr,py,pg5g,73 gag i

Operational Power Imbalance Envelope for Operation From 50 to 200 r 10 EITD - ANO-1, Cycle 6 Figure 3.5.2-3B

(-23,102) c 8

3(20,102)

- 100

(*23.92)

(20,92) gg PERM!!5!!LE CPERATING REGICN

(-34, 80 ) -

80 (32,80)

RESTRICTED REGION O- - 70 RESTRICTED REGION E

3-60

=

50 o.

m w

3- - 40 E

- 30

- 20 10 I

f f

f f

f I

I I

I

-50

-40

-30. -20

-10

.0 10 20 20 40 50 Axial Power Imbalance, %

l l

l 1

l Amendment No./,Jf,%Jf,71 48dl

Operational.Pover I= balance Envelope for Operation From 200 2 10'to 350 1 10 EFPD - ANO-1, Cycle 6 Figure 3.5.2-3C

( 22,102)

(20,102)

"1GO

( -22, 92)

(20,92) 90 PERMI13!BLE OPEPATINr.

REGION

(-32,80)

- 80 (32,80) 70 RESTRICTED RESTRICTED REGION REGION m

y

=

60

-i:

3

~.

n 50

=

O 40 e

30 20 10 l

I f

f I

f f

I f

f f

-50

-40

-30

-20

-10 0

10 20 30 40 50 Axial Power Imbalance, %

E l

Amendment !!o.,2f,2f,FY,5(,71

~

~

Operational Power Imbalance Envelope for Operation After 350 10 EFPD -- ANO-1, Cycle 6

' Figure 3.5.2-3D

( 24,102)

(18,102) 0

. iou

(-26,92) 90 PERMIS$18tE OPERAT!!8G REGION

(-30,80) 80 O

RESTRICTED RESTRICTED

. 70 REGION E.

REGION 3N. - 60

(-32,50) 6, _,f, S.

50 i

g 5'.. 40 30 20

~

10 t

I t

I I

t I

I t

t

-50

-40

-30

-20

-10 0

10 20 30 40 50 Axial Power Imbalance, %

1 1

Amendoent tio.JP[g71 1

48d3 i

l 0

o

APSR Position Limits for Operation From 0 to 60 EFPD -- ANO-1, Cycle 6 Figure 3.5.2-4A 110 (8,102)

(31,102)

C RESTRICTED 100 REGION 58' 2}

(31,92) 90 80 t (0,80)

(

,80)

'70

=

M s

60 PERMI.SSIBLE OPERATING E

REGION 50 g;

(100,50) g" 40 n.

~

30 20 10 0

0 10 20 30 40 50 60 70 60 90 100

% Witnarawn s

t i

L.

Amendnent fb.g,J.T_ 71 1

4gf

APSR Position Limits for 0 c\\e6 50 to 200"r 10 EFFD - ANO-Figure 3.5.2-43 110 (8.102)

(38,102)

U O

100 RESTRICTED REGION

) (9,92) a (38,92) 90 (0,80)

(41., 60 ).

80 <

70 7

E

. PERMISSIBLE OPERATING 60

"'=

REGION m

50 (100,50) k, 40 n.

30 20 10 0

s 0

10 20 30 40 50-60 70 80 90 100 i Witnarawn s

l Amendment t** A M, R 73 48g

APSR Pgsition Limits for Operatica Af ter 350 2 10-L'/PD - ANO-1. Cycle'6' Figure 3.5.2-4D 110 l

100 90 80 70 APSR INSER!!ON NOT ALLOWE0 ll IN THIS TIME INTERVAL 60 k

50

.M i

40 E

a.

30 20 10 0

t f

0 10 20 30 40 50 60 70 80 90 100 l

APSR, % Withdrawn l

fcendment flo. M M 7 1 481

~

PSR Position Limits for Operation From 200 1 10 to.350 10 EFPD - ANO-1, Cycle 6 ligure 3.5.2-4C 110 (8,102)

(38,102)

C 0

100 RESTRICTED REGION 90 (8,92)

(38,92) 80 t (0,80) 41,80) 70 3

PERMISSIBLE

' OPERATING

=06 g

REGION m

- g'.

~

50 (100,50) g t 40 E

o.

30 20

~. _ _. ~ _

10 0

t i

i 0

10 20 30 40 50 60 70 80 90 100 5 Witnarawn i

l i

Amendment flo y,g8 71 48h

-.