ML20069D842
| ML20069D842 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs, 05003178 |
| Issue date: | 09/13/1982 |
| From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| RO-82-43, RO-82-53, NUDOCS 8209220285 | |
| Download: ML20069D842 (1) | |
Text
DESIGNATED ORIGIHif 7
C rtified By BALTIMORE G AS AND ELECTRIC COMPANY e.o. max;says s A LTI M c M E. M AnvLAND 2T 202.
l a.
_ h..
l
.tAQ POwtR DEPARTMENT j"..-
.-ERT CLtFF1 MUCLEAR POWER PLANT 1y; ly, n/A83YLAND 20437
.T I'E h-September 13. 1982 Y
Cv,:.
2-
. w.~,
I:@4, E.
~
Docket No. 50-317/50-318 Mr. Ronald C. Haynes, Director "J
r.*
U. S. Nuclear Regulatory Comuniasion License No. DPR 53/DPR 69 Region 1
- g. ~
~y 631 Park. Avenue
{h[
King of Prussia, PA 19406
-r
SUBJECT:
LER 82-53 (U-1); LER 82-43 (U-2)
.+.
Dear Mr. Haynes:
7
-s This letter is to confirm our verbal notification of your Mr. Dave Trimble of the discovery that our only operable hydrogen analyzer was
~
technically inoperable for a brief ~ period of ei==..
At 1045 on September 10, 1982 with Units No. I and 2 in Mode 1. it was discovered that the hydrogen analyzer (T.5'. 3.6.5.1) was iminten-tional17 adjusted out of calibration rendering the unit inoperable.
The instrument was recalibrated and returned-to service at 1125 ter-minating the event.
c;.
- s.
A complete description cf the events leading to this discovery and any further corrective actions will be addressed in a follow-up report..',
N Very truly yours, it G~
=-
d Q
1 L. B. Russell I..,",,
~ ' '
Plant Superintendent j
p,
]
LBR:bsg h
- . ? ',
'y Director, Office of Management
' ? 7,,:,,
R. M. Douglass-cc:
J. A. Tiernan Y
R. E. Architzelt-,
Information & Program Control t', 5 " ~
L. B. Russell d l'
. Z*.71 W. S. Gibson E
J. M. Bills
. ?y
' Il5 t -
2M n. -4
.[~ 7
?q qW g
PDR ADOCK 05000317 G.- M y._,
8209220285 820913
~
%~l
.4f.Y h' S
PDR y