ML20069C910
| ML20069C910 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/19/1982 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20069C911 | List: |
| References | |
| NUDOCS 8207210362 | |
| Download: ML20069C910 (1) | |
Text
_. _.. _
PH1'LADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 1215)8414000 July 19, 1982 Docket Hon.'50-277 50-278-l Mr.
R. C. Haynes, Adninistirator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
Annual Plant Modification Report File:
GOVT l-1
Dear Mr. Haynes:
Enclosed, please find the 1981 Annual Plant Hodification Report for Peach Bottora Atomic Power Station, Facility Operating Licenses Nos. DPR-44 and DPR-56.
This report is submitted in fulfillraent of the reporting requirononta of 10CrR 50.59 describing changes to the facility as the facility is described in the safety analysis report.
Sincerely, l
M. M. Alden Enginecr-In-Chargo duclear Section Generation Division 6' h RCB: Imd cc:
Document Control Desk Washington, D.C.
1 8207210362 82dI15 ^ ~
~
PDR ADOCK 05000277 R
-