ML20069C762
| ML20069C762 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 07/12/1982 |
| From: | Holyoak R COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8207210221 | |
| Download: ML20069C762 (3) | |
Text
_
Commonwe:lth Edison e
LaSalle County Nuclear Station
___, F Rural Route #1, Box 220 e
v' Marseilles, Illinois 61341 Telephone 815/357-6761 qv ~ $
i July 12, 1982 Mr. James G. Keppler Regional Administrator Di rector of Regulatory Operations Region 111 U. S. Nucicar Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Sir:
In accordance with LaSalle County Station Unit 1 Facility Operating License NPF-11, Appendix B, Section 3 2, we are submitting to you a copy of the NPDES noncompliances for LaSalle County Nuclear Generating Station Permit No. ILOO48151.
t
[ Superintendent
_s
' H. Holyoak LaSalle County Station RHH/CLN/djp Enclosure cc:
DVR Report
(
i
,' PDR ADOCK8207210221' 820712
/
~~
j 05000373 POR
.JUL~ 1 5-082.
s
.. g 6
LASALLE COUNTY NUCLEAR GENERATING STATION N.P.D.E.S. PERMIT NO:
ILOO48151g NONCOMPLIANCE REPORT DISCHARGE NUMBER AND DESCRIPTION:
00lb - Sanitary Treatment Plant PARAMETER AND PERMIT LIMIT:
Fecal Coliform - 400 counts daily maximum 100 ml NONCOMPLIANCE, DATE, AND DURATION:
5100 counts /100 m1, 10 JUNE 82, unknown -
grab sample CAUSE OF NONCOMPLIANCE:
~
~ ~ ~ - - - - - -
High, hydraulic loading to the treatment plant.
Free c'hlorine residual at time of sampling was 1.0 mg/L.
Due to the high flowrate, the chlorine contact time between chlorine injection and sample point is Insufficient to indicate proper treatment.
i... _-
~
CORRECTIVE _ ACTION:
The Station is attempting to reduce the excessive hydraulic loading due to construction in progress.
11 JUNE 82 DATE RECOGNIZED _AS,A VIOLATION:
11 JUNE 82 DATE INVESTIGATED:
.%',1. aa.:: L JUN 161992
' h~f-t Date M, /f[$
s To:
Station Superintendent, M
S*e' Station n
v
Subject:
Noncompliance with NPDES Permit.
The Chemical Section, System Materials Analysis Department, has determined that the following parameters in a water sample from your station are not in compliance with the NPDES permit issued to the station.
^
o Sample:
L i d '/ } L Li b ; ' d 5 %,
/
4 Date Sampled:
d -/d -81 Analyzed NPDES Date of Parameter __
Value -
Limit Analysis Analyst 7ky s,. OLo Fod M
[if"Y)
YJ 4b@/
4-D-92
?$ $ = hss-I The avove information was reported by telephone to b. D a. Od um \\ \\E by $-
)
on
/
[
Chemical Section System Materials Analysis Department Distribution: Station Superintendent Technical Services SMAD Environmental files
_ _ - _ _ _ _ _ - _ - _ _ _ _.