ML20069C673

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 78 to License DPR-30
ML20069C673
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 02/17/1983
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20069C621 List:
References
NUDOCS 8303180093
Download: ML20069C673 (2)


Text

- _ - _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _, _ _

UNIlED STAIES NUCLEAR REGULATORY COP 911SSION DOCKET NO 50-265 t.0MMONWEALTH EDISON COMPANY -

I'

'.. AND IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 78 to Facility Operating License No. DPR-30 issued to Commonwealth Edison Company and Iowa-Illinois Gas and Electric Company, which revised the Technical Specifications for operation of the Quad Cities Nuclear Power Station, Unit. 2, located it. Rock Island County, ' Illinois.

The amendment is effective as of the date of issuance.

The amendment changes provisions of the Technical Specifications nertaining to the reactor protection system delay and response times, and the average power range monitor gain adjustment.

The application for the amendment complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Conmission's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendment.

Prior public notice of the amendment was not required since the amendment does not involve a significant hazards consideration.

8303180093 830217 PDR ADOCK 05000265 p

PDR

r-

- 2..

The Commission has detennined that the issuance of the amendment will not result in any significant environmental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of the amendment.

For further details With respect to this action, see (1) the application for amendment dated May 12, 1981 (2) Amendment No. 78 to License No. DPR-30, and (3) the Comission's related Safety Evaluation.

All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, NW., Washington, D.C., and at the Holine Public Library, 604 - 17th Street, Moline, Illinois. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D.C.

20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 17th day of February 1983.

FOR THE NUCLEAR REGULATORY COMMISSION

~

Domenic B. Vassallo, Chief l

Operating Reactors Branch #2 i

Division of Licensing l

l l

l

-