ML20069B396
Jump to navigation
Jump to search
| ML20069B396 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/09/1983 |
| From: | Nix H GEORGIA POWER CO. |
| To: | NRC |
| Shared Package | |
| ML20069B398 | List: |
| References | |
| GM-83-254, NUDOCS 8303160583 | |
| Download: ML20069B396 (1) | |
Text
_
/
Georgin Po';tir Cornpiny Post Office Box 439 Billey, Georgi 2 31513 Telephone 912 367-7781 912 537-9444 Georgia Power Edwin 1. Hatch Nuclear Plant March 9, 1983 GM-83-254 i
{
{
l PLANT E.
I.
HATCH NRC Monthly Operating Report Office of Plans and Schedules
{
Directorate of Licensing
{
United States Nuclear Regulatory Commission Washington, D. C.
20545
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 1, Docket #50-321, and for Hatch Unit 2, Docket #50-366.
-l
~
H.
C.
Nix General Mana/
ger HLS/hh 9D 1
l i
[
8303160583 830309 PDR ADOCK 05000321 PDR R
_ _ - _ _ _ _ - _ _ _ _