ML20069A882
| ML20069A882 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/11/1983 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20069A884 | List: |
| References | |
| NUDOCS 8303160332 | |
| Download: ML20069A882 (1) | |
Text
, _ _ _ _.
4 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 0699 PHILADELPHI A. PA.19101 1215)8414000 March 11, 1993 Docket Nos. 50-277 50-278 Director Office of Insoection & Enforcement US Nuclear Reculatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthlv Operating Report Gentlemen:
Attached are twelve copies of the monthly ooerating report for Peach Bottom Units ? and 3 for the month of February, 1933 forwarded pursuant to Technical Snecification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Verv t uly o re,
/
f M. J. Cooney Superintendent Nuclear Generation Division Attachment cc:
Mr. R. C. Haynes, NRC Mr. A. R. Blough, NRC Site Insoector Mr. Stan P. Mangi, Dept. of Envir. Resources l
l I
l 8303160332 830311 i
PDR ADOCK 05000277 R