ML20067D057

From kanterella
Jump to navigation Jump to search
Forwards ISI Rept for Millstone Nuclear Power Station,Unit 2 for 890414-901104
ML20067D057
Person / Time
Site: Millstone 
Issue date: 02/04/1991
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20067D060 List:
References
B13734, NUDOCS 9102120311
Download: ML20067D057 (1)


Text

-

4 NORTHEAST UTILITIES conem on,ce.. somen sue.t. con,n. Conn.ci,cui l

2$2225sS2[:I-w'.'

P O BOX 270 n.m..""*""**

H ARTFORD. CONN ECTICUT 06141 0270 k

k J $7.U. C[,%U.[U".,,

(203) % 5-5000 February 4, 1991 Docket No. 50-336 B13734 Re:

ISI V.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 1990 In-Service inspection Report in accordance with the ASME Boiler and Pressure Vessel Code, 1980 Edition and Addenda through Winter 1981, the Millstone Unit No. 2 1990 In-Service Inspec-tion Report is submitted for your information and use.

Inspections covered by this report were performed between April 14, 1989,- and November 4, 1990.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l

l E. J.

zka Senior ice President Attachment cc:

T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 1

0]f 9102120311 910204 i

osam new tas PDR ADOCK 05000336 I

O PDR r71 7