e-Ba sTO N EpisDN COMPANY GENERAL OrrscEs 500 BovLaTON ETNEET SceTON, M ASSAcMUSETTS O219 9 A. V. M O RISS MANAGER NUCLEAR OPERATIONS SUPPORT DEPARTMENT December 6,1982 BECo. Ltr. #82-304 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License No. DN-35 Docket No. 50-293 Response to Information Survey on PNPS Emergency Operations Facility
Dear Sir:
The following infonnation is offered in response to a verbal request from Mr. K. Eccleston of your staff concerning the Primary and Backup Emergency Operations Facility (EOF) at Pilgrim Station.
Permanent Primary E0F Location On-site, approximately 1/4 mile from the reactor building Structure Type, Prefabricated aluminum and wood l
frame permanently installed mobile office structures l
l Protection Factor 1.0 Date Started Structures were first moved on-site in June 1980 Construction Status Complete and operational in March 1981 HEPA Filters No Permanent Backup E0F Location 19 miles from site Structure Type Brick and concrete 8212100031 821206 PDR ADOCK 05000293 F
e go COOTON E%1 EON COMPANY Mr. Domenic B. Vassallo, Chief December 6,1982 Page 2 h
i Date Started Existing structure (Massachusetts State Emergency Operations Facility)
Construction Status -
Complete For further information on this subject please refer to BECo Letter.#81-121, dated June 1, 1981 " Response to NRC Generic Letter #81-10".
Very truly yours, t