ML20067C282
| ML20067C282 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 11/30/1982 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20067C284 | List: |
| References | |
| NUDOCS 8212090053 | |
| Download: ML20067C282 (4) | |
Text
.
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-318 BALTIM0RE GAS AND ELECTRIC COMPANY NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The United States Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. DPrt-69 issued to Baltimore Gas and Electric Company (the licensee), for operation of the Calvert Cliffs Nuclear Power Plant, Unit No. 2 located in Calvert County, Maryland.
The amendment would revise the Safety Limits and Limiting Condition's'for
- Operation, contained in the Appendix A Technical Specifications, for Calvert Cliffs Unit No. 2 in accordance with the licensee's application dated October 15, 1982. These changes are primarily the result of new safety analysis methods applied to the analysis for Cycle 5 operation of Calvert Cliffs Unit 2.
The analysis presented provides for an increased operating period between refuelings.
Prior to issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
By January 7,1983, the licensee may file a request for a hearing with respect to issuance of the amtndment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written petition for leave to intervene.
Requests for a hearing and petitions for leave to intervene shell be filed in accordance with the Commission's " Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.
8212090053 821130 PDR ADOCK 05000318 P
E590 01__
.. If a request for a hearing or petition for leave to intervene is fUnti by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Comission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition and the Secretary or the desig-nated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 3 714, a petition for leave to intervene shall 2
set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should..be permitted with particular reference to the following factors: (1) the nature of the petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial,or other interest in the proceeding; and,(3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which l
petitioner wishes to intervene. Any person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to fifteen (15) days prior to the first pre-I hearing conference scheduled in the proceeding, but such an amended petition I
must satisfy the specificity requirements described above.
No later than fifteen (15) days prior to the first prehearing confere'nce scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter, and the bases for each contention set
~
i 7,590g
~ '
' l forth with reasona51e spectftetty. Contentions irhall be limited to matters within the scope of the amendment.funder consideration. A petitioner who fails 'to file such a supplement which satisff'es these requireme'nts with respect to at least one contention will not be permitted to participate as a party.
Those pemitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportuntty to earticipate fully in the condu'.t.of the hearing, including.the.
opportunity to present evidence'and. cross-exat ine.. witnesses.
A request for a hearing or a petition for. leave..to intervene shall be filed with tiin Secretary of the Commission, United States Nuclear Regulatory Comission Washtngton, D. C.
20555. Attention: Docketing and Service Section, or may 5e delivered'to the Commission's Public Document Room,1717 H Stheet, N.Y., Washington, D.C. By the above date. Where petitions are filed during the last ten 00) days of the nottee period, it is requested that the petittoner or representative for the petitioner promptly so inform the..
~
Comission by a toll-free telephone call to Western Union at (800) 325-6000.
(in Missouri (800) 342-6700). The Western Union operator should be given l
Datagram Identification Number 3737' and the following message addressed to Robert A. Clark:
(petitioner's name and telephone number), (date petition was mailed); (plant name); and (publication date and page number of this FEDERAL REGISTER nottee). A copy of the petition should also be sent to',,,
the Executive Legal Director, U S. Nuclear Regulhtory Commission, Washing, ton.
D.C.
20555, and to James A. Biddison, Jr., General Counsel, G and E Building,
~
Charles Center BaltimorepMaryland 21203,' attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental pettttons and/or requests for. hearing will not be entertained s
O
~ ' ' ' '----
e -..
7590-01 absent a determination by the Commission, the presiding officer or the Atomic Safety and Licensing Board designated to rule on the petition and/or request.
That determination will be based upon a balancing of the factors specified in 10 CFR g2.714(a)(i)-(v) and g2.714(d).
For further details with respect to this action, see the application for amendment dated October 15, 1982, which is available for public inspection at the Commission's Public Document Room,1717 H Street, N. W, Washington, D. C., and at the Calvert County Library, Prince Frederick, Maryland.
Dated at Bethesda, Maryland this 30th day of November,1982 FOR THE NUCLEAR REGULATORY COMMISSION
~
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing l
l l
t
,