ML20067B741

From kanterella
Jump to navigation Jump to search
Requests Withdrawal of NRC 910129 SER Which Concluded That Proposed Change to Standby Liquid Control Sys Tech Spec Unacceptable to Enable Technical Review Process to Continue Unencumbered by Predetermined Conclusions
ML20067B741
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/07/1991
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-00025, 91-25, NUDOCS 9102110020
Download: ML20067B741 (2)


Text

.. ~

Entcrgy RTa Wa"*"' '"*>

' Operations

g j N * '

W. T. Cottle rm 1

g4 I (_

- t

-February 7, 1991 U. S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D. C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NFF-29 NRC SER Dated January 29, 1991 GNRO:-

91/00025 Gentlemen:

By letter dated-January 29, 1991 the NRC Project Manager for Grand Gulf Nuclear Station transmitted a letter and SER which concluded that a proposed change to the Standby Liquid Control System technical specification was unacceptable, it is my belief that the manner in which this issue has been addressed, particularly the use-of a premature SER which reaches unsubstantiated conclusions, was improperly handled by the PM. The meeting scheduled for February 12 is the' proper forum to review open technical issues.

I believe we have a common interest in_ wishing to resolve this long outstanding technical specification. change.

In order to do so expeditiously, we request that the SER be withdrawn so that the technical review process may continue unencumbered by predetermined conclusions.

I would appreciate your prompt consideration of this request.

-Yours truly, ePW WTC/MJM/be cc:

(See Next Page)

L 4

5 9102110020 910207 PDR ADOCK 03000416 k

l

_(,L..

P-PDR

February 7, 1991 GNRO 91/00025 Page 2 of 3 cc:

Mr. T. P. Gwynn (NRC/NRR) (w/a)

Mr. D. C. Hintz (w/a)

Mr. J. L. Mathis (w/a)

Mr. C. W. Moon (w/a)

Mr. R. B. McGehee (w/a)

Mr. T. R. Quay (NRC/NRR) (w/a)

Mr. N. S. Reynolds (w/a)

Mr. S. B. K. Sun (NRC/NRR) (w/a)

Mr. F. J. Witt (NRC/NRR) (w/a)

Mr. H. L. Thomas (w/o)

Mr. E. B. Tomlinson (NRC/NRR) (w/a)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator V. S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U.- S. Nuclear Regulatory Commission Mail Stop 11021 Washington, D. C.

20555 t

_ _ _ _ _ _ _ - _ - _ - _ _ _ _ _