Suppls 820721 Response to NRC Re Violations Noted in IE Insp Rept 50-358/82-05.Addl Training Will Be Provided for Site Personnel Re Reporting Requirements of 10CFR50.55(e).Training to Be Completed by 820930
ML20067B072
Person / Time
Site: Zimmer
Issue date: 08/16/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20067B040 List:
References
QA-1920, NUDOCS 8212060039
Download: ML20067B072 (2)


Text

.

4 7===$

THE CINCINNATI GAS & ELECTRIC COMPANY ME CIN CINNATf. OHIO 452o1 August 16, 1982 QA-1920 E A. BORGMAN N SEN80R VtCE PRESIDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 I. E. INSPECTION REPORT 82-05 DOCKET NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300, JOB E-5590 FILE NO. NRC-1 Gentlemen:

This letter constitutes a supplement to our response to the subject Report, QA-1884, dated July 21, 1982, concerning reporting of 10CFR50.55(e) events to the Commission.

With regards to the " Corrective Action Taken to Avoid Further Noncompliance" section of the response, in addition to the commit-ments already made, CG&E will provide additional training for CG&E site personnel to the reporting requirements of 10CFR50.55(e).

Personnel to be trained include those in the Nuclear Engineering, Generation Construction, Nuclear Production and Quality Assurance Departments whose duties include the processing, review and approval of Nonconformance Reports (NRs), Corrective Action Requests (CARS),

Audit Findings (AFRs), Condition Evaluation Requests (CERs) and Engineering Change Requests (ECRs). Training will include indoc-trination to identification of significant deficiencies in design and construction and the established procedure for bringing such deficiencies to the attention of appropriate levels of management.

$@f.'

8212060039 821130

$G a $

o PDR ADOCK 05000358 PDR a

__m.

l' e.

s Mr. J. G. Keppler Regional Administrator Region III August 16, 1982 - QA-1920 Page 2 i

In addition, document reviewers will be instructed to the applicability of reporting requirements during their reviews of past NRs and CARS to identify pctentially reportable items to re-sponsible management. All training will be completed by September 30, 1982.

4 We trust the above will be found acceptable as a supplementary response to the subject Report.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY ff

^r l

E. A. BORGMANN SENIOR VICE PRESIDENT FKP:plc cc: NRC Office of Inspection & Enforcement Washington, D.C.