-. _ _ _ - _ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. - - _ _ _ _ _ _ _.
i*
c -- n
\\
o Donald C. Shohen 300 Madmon tenue i
Vce President Nuclear iolado. OH 4X42KK)1 4
DeMoses (419)249 2300
(
Docket Number 50-346
{
l License Number NPF-3 Serial Number 1897 February 15, 1991
-l United States Nuclear Regulatory Commission Document Control Desk
'Vashington, D. C.
20555
Subject:
Semi-Annual Fitness-For-Duty Report July - December 1990 i
= Gentlemen
.1 Fursuant to 10 CFR 26.71(d)i" Record Keeping Requirements", Toledo Edison hereby-submits its Semi-Annual Fitness-For-Duty (FFD) report for the period of July - December.1990 for Davis-Besse Nuclear Power Station, Unit 1.
Attschment 1 provides Toledo Edison's FFD Frogram Reference Data. The data form is an industry standard developed by NUMARC to provic'e the information required by 10 CFR 26.71(d). Attachment 2 provides a susaary of management 1
actions _taken by Toledo Edison based on positive FFD results and a list of
-l i
FFD event reports submitted by Toledo Edison.-
Should you have any questions, please ' contact Mr. R. V. ',,chrauder, Manager -
-Nuclear Licensing, at (419) 249-2366.
P Very truly yours,
/p CAB /mmb Attachments cci
.P. H. Byron, DB-1 NRC Senior Resident Inspector A. B. Davis,-Regional Administrator, NRC Region III D. C. Di Ianni, DB-1 NRC Senior Froject Manager Utility Radiological Safety Board 9102260059 910215 PDR ADOCK 05000346 I
RL PDR 7
Opemhn0 Comrinies.
sE V I e,j b' (t Cleverand Electne !!Iaitunohng A !T * ' n 10ledo fd3pn i.
l
Dockot No:ber 50-346 Lic:nsa Nurb2r NPF-3 Serial Number 1897 Attachment I a
Toledo Edison's Fitness-For-Duty Report July - December 1990 February 1991
~
I APPENDIX C RTNESS FOR DUTY PROGRAM Perfonnance Data Personnel Subject to CFR 26 1
Toledo Edison 2
occcmwer 31, 1990 cOV8-ANT 6 MONTH 5 ENIANG e
3 cavis-nesse tocat e4 Robert W. Schrauder 5 (419) 249-2366 contact NAvt moNt oNewot AatA conti 3
CUT 0FFS: SCREEN / CONFIRMATION (ng/ml) b APPENDIX A TO 10CFR 26 MARIJUANA 50 / 15 AMPHETAMINES 1000 /500
/
COCAINE 300/ 150 PHENCYCLIDINE 25 /25
/
OPIATES 300/ 300 ALCOHOL (% BAC) 0.04
/
LONG TERM SHORT TERM CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH UNESCORTED ACCESS 7
1231 293
~
a REFERRED ACCESS CATEGORIES - $
TESTED POSITIVE TO EAP RESTORED TESTED POSITIVE TESTED POSITIVE PRE EMPLOYMENT 59 0
0 0
PRE-BADGING 55 1
146 0
PERIODIC 71 0
0 0
FOR CAUSE 1
0 3
0 POST ACCIDENT o
0 0
0 RANDOM 753 0
108 1
FOLLOW UP 14 0
4 0
OTHER 6
0 1
0 M9 10 262 [,
TOTAL 959 1
1
,,,,, j
RANDOM TESTING PROGRAM RESULTS 11 INDMDUALS TESTED 1989 1990 1991 1992 1993
/~
p/
- POS 9
1
/ # NEGATIVE
/
/1254./ 860 /
8/
/
% POSITIVE O.7 0.1 GRAPH OF 6
l h-~~~
% POSITIVE i
4 I
d-3 2
1 i
i i
I
?w ii i
,L CONFIRMED POSITIVE TESTS FOR SPECIFIC SUSSTANCES 12 MARlJuANA 0
COCAINE 1
OPIATES 0
AMPHETAMINES 0
PHENCYCLIDINE o
ALCOHOL I
6/7/89
\\
i
(
i Note: See pages 13,14 and 15 for numerical code descriptions.
22
1 Dock 0t Nu ber 50-346 Lic:nsa Nu ber NPF-3 i
1 Serial Number 1897 TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY Toledo Edison Contractor EAP Referral 1
0 Henagement Sanctions 1
1 TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS No Fitness-For-Duty reports were submitted by-Toledo Edison.
-