ML20066G028

From kanterella
Jump to navigation Jump to search
Revised Final Deficiency Rept 81-02 Re Relay Assembly Cracking Replacement Program Contracted to Ge.Initially Reported on 820911.Periodic Visual Insp Program Will Be Established by 830201
ML20066G028
Person / Time
Site: LaSalle  
Issue date: 11/10/1982
From: Schroeder C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 5412N, 81-02, 81-2, NUDOCS 8211190269
Download: ML20066G028 (2)


Text

._

/ f Commonwealth Edison O

one First NitiorW PIIza. Chictgo, litinois C

1 Address RIply to: Post Office Box 767

\\j Chicago. Illinois 60690 i

November 10, 1982 Mr. James G. Keppler, Regional Adminis trator Directorate of Inspection and I

Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

LaSalle County Station Units 1 and 2 HFA Relay Assembly Cracking Re vised Final Report, LSCS 1 and 2 10 CFR 50.55(e) #81-02 NRC Docket No s. 50-373 and 50-374 4

Re ferences (a):

L.

O. DelGeorge letter to J.

G. Keppler dated September 11, 1982.

i (b):

GE Service In formation Le tter #44, Supplement 2 dated February 13, 1981.

1

Dear Mr. Keppler:

The purpose of this transmittal is to update information provided in Reference (a) relative to the HFA relay assembly cracking replacement program.

General Electric (NSSS-San Jose) has completed the replace-ment of lexan coils on all of the safety-related NSSS HFA relays for Units 1 and 2 with the exception of some Unit 2 relays that were damaged during construction.

The remaining Unit 2 NSSS safety related relays will be replaced with new qualified relays.

General Electric (IS&E), contracted by Commonwealth Edison Company, has completed the replacement of lexan coils on all of the safety-related balance-o f-plant HF A relays for Units 1 and 2, with the exception of four relays that were not upgraded due to a lack of l

qualified replacements.

Reference (b) recommended that a periodic visual inspection program be established and maintained until such time as the relays are upgraded or replaced.

Such a program will be l

implemented by LaSalle County Station by February 1,1983.

i i

[c27 8211190269 821110

~

j PDR ADDCK 05000373 l

S PDR NOV 12 E62

(

=

  • o

,/

J. G. Keppler Novembe r 10, 1982 If there are any questions in this matter, please contact this office.

This is considered a final report for LaSalle County Station Units 1 and 2.

Very truly yours, N

u lm/ht C. W. Schroeder Nuclear Licensing Administrator 1m cc:

Director of Inspection and En fo rcemen t, Washington, D.C.

NRC Resident Inspector - LSCS 1