ML20066F877
| ML20066F877 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 12/26/1990 |
| From: | Pleniewicz R COMMONWEALTH EDISON CO. |
| To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20066F879 | List: |
| References | |
| BYRON-90-1219, NUDOCS 9101240226 | |
| Download: ML20066F877 (1) | |
Text
.
=.
' 4 A Ccmm nw:alth Edison >
k-
- ' /
On Nuclear Station
's 50 North German Church Road -
-V(. i.
v
._ Byron, Illinois 61010 s,..
~ ' '
'PRI0altY ROUTilt4 -
j E.est sersnd:
6 Ff iA L CIC 1
M p-~(:p ap su p MS
/Ane
. 3 M5 at m
DI De cemb'e r- -2 6, 1990 PAD A F'A LTRI BYRON 90-1219 FILE:
3.11.0320-
[
Mr._A. Bert Davis-Regional Administrator Office'of Inspection:and Enforcement -
l Region III-U._ S. Nuclear Regulatory Commission Glen Ellyn, IL '60139
SUBJECT:
Cominonwealth Edison Byron Unit 2 Steam Generator Eddy Current:
Examination During the Cycle 2 Refueling-_ Outage.
i Dear Mr.;Davist.
Please. find attached a report of the _ Byron Unit 2 Steam Generator examination performed during the Cycle!2-refueling outage of' September-November of 1990.-
~
This report is being submitted to you in compliance:with the requirements _of t
Mandatory Appendix IV of Section XI of the ASME Boiler:and Pressure Vessel Code,-1983-Edition _through Summer l1983 A:'denda in accordance:with Byron
{
Technical Specification 4.0.5.
'If there.are any questions, please contact Mr. J. R. - Smith at Byron Station at (815) 234-5441 extension 2847.
a
.i
- 11. Plen ewicz Station Manager Byron Nuclear Power Station 1
RP/JRS/kc cci M. Wallace/K. Graessor (w/o attachment)
P. Johnson (w/o attachment)
K. Kofron (w/ attachment) 4 R.' Tamminga'(w/ attachment),
J. Blomgren.(w/ attachment)
T..Schuster (w/ attachment-)
i J..Hendricks (w/ attachment --2 copies) g (3017z/0060z/122690) 9101240226 901226
,2-.1,
.PDR ADOCK 05000455
~
P PDR m-..
- ~..
-