s i
ATTACHMENT I i
~
" AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V.C. Summer I DiTE 11-09-82 COMPLETED BY c.
.T. Tavlor TELEPHONE (803) 345-5209 MONTH OCTOBER 1982 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 0 37 O
1 0
0 2
jg,
0 0
3 3,
4 0
3 0
5 0
n 0
0 6
0 g
O 1
0 n
l 8
24 0
I 0
9 0
g 10 0
26 0
0 0
11 27 0
0 12 3
0 13 0
29 14 0
30 0
15 0
31 0
0 8211190184 82111h5 DR ADOCK 050003 PDR
s ATT/.CHMENT II OPERATING DATA REPORT DOCKET NO.
50 /
- UNIT V.C. Sumer T DATE 11-09-82 G. J. Taylor COMPLETED BY TELEPHONE (803) 345-5209 OPERATING STATUS 744 OCTOBER 1982 GROSS HOURS IN REPORTING PERICO:
- 1. REPORTING PERIOD:
277 5 MAX. DEPEND. CAPACITY (MWe-Net):
M/A
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
900 DESIGN ELECTRICAL RATING (MWe-Net):
N/A ( 5'/Wti
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
- 4. REASONS FOR RESTRICTION (lF ANY):
The Operating License allows operations up to HIS MOWH YR TO D ATE CUMULATIVE 5% MWt for Low Power Testing I7I 4 I7I 4 I7I 4
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERV E SHUTOOWN HCURS...................
0 0
0
- 7. HOURS GENER ATOR ON LINE.
0 0
0
- 8. UNIT RESERVE SHUTDOWN HOURS......................
0 0
0
- 9. GROS $ THERMAL ENERGY GENERATED (MWHI O
O O
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).............
O O
n
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
N/A N/A N/A
- 12. R E ACTO R SE RVICE F ACTOR..........................
N/A N/A N/A
- 13. R EACT O R AV AI LA BI LITY F ACTO R.......................
N/A N/A N/A
- 14. UNIT SERVICE FACTOR,............................
N/A N/A N/A
- 15. UNIT AVAILABILITY F ACTOR.........................
N/A N/A N/A
- 16. UNIT CAP ACITY FACTOR (Using MDC17....................
N/A N/A N/A f
- 17. UNIT CAP ACITY F ACTOR (Using Design MWel.................
N/A N/A N/A
- 18. UNIT FORCED CUTAGE RATE
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND OURATION OF EACHl:
D-3 Steam Generator Modification - March, 1983 throug/Ah May, 1983.
'I
- 20. IF SHU T DOWN AT END OF REPORT PERIOO. ESTIMATED OATE OF STARTUP:
FORECAST ACHIEVED
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL CPERATION):
t 10/20/82 10/22/82 INITI AL CRITICALITY II/I7/82 INITIAL ELECTRICITY COMMERCI AL CPERATION l
I 90 r
r 2
e o
5 i
m v
5 u
2 a
4 S
s 8
T 3
T 5
N 9
9
)
E 3
c 0
3 3
/
0 M
8 M
0 1
5 X
c
(
O 1
C E E YE S
/
ON M T B N N
O O
p A A Dl T N I
),
u T
E I
i E
t P
C K T TE A
ar L
I L
C N L
E t
E V
S O
U P
T D
M T
t I
O C
n E
a C
R l
R P
O C
la i
t i
S n
N I
O IT g
C o
)2 U
l N R(
D W OR m
E E
FOR W R
ODO n
T O R
OG C P m
ONAG e
I E
I o
HI W
T EN I
T TRI O
E C
T P
M UEU N
HHD 4,
l E
D T
STE i
M N
N E
H A
O CA S
M T
N A
W T
T
)
R 0
O O
N D
P O
T E
SA U
R E
H R
B S
T I
N N
U O )S I
T 0
R A U
'6 R O 7
U (H 0
D 2
D E
D L E U EC PR D E
Y O H T F C S
- S F :
S 1
E 3
T 0
A 1
D 2
8 A
O
/
N N
-=.
o i
i ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
-Virgil C. Summer Nuclear Station Unit No. 1 entered Mode 3-(01%
l power, 1350*F) October 1, 1982, to commence Hot Shutdown Testing.
This testing was completed on October 10, 1982.
During this period a Pressurizer Operated Relief Valve (PORV) was challenged while performing a pressurizer spray / heaters capabilities test on October 9, 1982.
Zero Power Testing commenced October 18, 1982 and was completed October 29, 1982.
At 05:25, October 22, 1982 initial criticality (Mode 2) occurred and power level was raised to 1% shortly
)
thereafter.
In the process of raising power level to 3% for an all rods out low power flux map, a reactor trip occurred at 07:45, October 23, 1982.
The trip was caused by a lo lo B Steam Generator level, as the result of a Condenser Steam Dump Valve opening due to spurious actuation.
During completion of Zero Power Testing, overpressurization of i
the Nuclear Blowdown Monitor Tank occurred October 23, 1982.
Results of the overpressurization revealed that the tank was bowed, all the hold down bolts were sheared, and pipe hangers were bent.
Virgil C.
Summer Nuclear Station is presently waiting permission from the NRC Commissioner to exceed 5% MWth power and proceed with the power ascension test program.