Interim Deficiency Rept Re Item M-54,lack of Qualification of Hydraulic Control Units.Initially Reported on 820726. Structural Analysis Portion of Dynamic Requalification Program Completed.Final Rept Will Be Submitted by 830331
ML20066F738
Person / Time
Site: Zimmer
Issue date: 11/08/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2100, NUDOCS 8211190155
Download: ML20066F738 (1)


Text

_m._

THE CINCINNATI GAS & ELECTRIC COMPANY sE CINCINN AT1, OHIO 4520t November 8, 1982 QA-2100 E. A. BORO M AN N SENeon vic( PR(SaDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. II. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e)-ITEM M-54-LACK OF QUALIFICATION OF IIYDRAULIC CONTROL UNITS, W.0.#57300, JOB E-5590, DOCKET No.50-358, CONSTRUCTION PERMIT NO. CPPR-88, FILE NO. NRC-8, M-54 Centlemen:

This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on July 26, 1982, under the requirements of 10CFR50.55(e).

As stated in our previous report, QA-1945, dated August 17, 1982, tte subject deficiency has been addressed for Zimmer by a dynamic requalification program which is a combination of analysis and limited scope testing covering both back-to-back and single row Ilydraulic Control Unit configurations.

The structural analysis portion of this effort has been completed. A draft test specification has been completed and the test specimens are in the process of being purchased. The expected qualification test completion date is March 31, 1983, at which time a final report will be submitted.

We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

f Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By [

~

E. A. BORGMANN SENIOR VICE PRESIDENT cc:

NRC Of fice of Inspection & Enforcement Washington, D.C. 20555 NRC Scnior Resident Inspector Attn:

W. F. Christianson Zimmer Project Inspector

\\

Region III

\\