Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 ML20140H0441997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Davis-Besse Nuclear Power Station Unit 1 ML20141B9521997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Davis-Beese Nuclear Power Station Unit 1 ML20137T5271997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20136G7221997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Davis-Besse Nuclear Station Unit 1 ML20134L9831997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Dbnps,Unit 1. W/Undated Ltr ML20133G0161996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20149M4071996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Davis-Besse Nuclear Power Station Unit 1 ML20134P9821996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20128Q0611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Davis-Besse NPP, Unit 1 ML20117D5341996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20117D5411996-06-30030 June 1996 Revised MOR for June 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20116E0161996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Davis-Besse Nuclear Station Unit 1 ML20113B9111996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Davis-Beese Nuclear Power Station Unit 1 ML20117H7231996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Davis-Besse Unit 1 ML20112E6061996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for David-Besse Nuclear Power Station,Unit 1 ML20101G5251996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DBNPS Unit 1 ML20149K7711996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Davis-Besse Nuclear Power Station.W/Undated Ltr ML20096C7971995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20095H3761995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20094L1041995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20093J2341995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Davis-Besse Nuclear Power Station ML20098A2651995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Davis-Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20211B0271999-08-13013 August 1999 SER Accepting Second 10-year Interval Inservice Insp Requests for Relief RR-A16,RR-A17 & RR-B9 for Plant, Unit 1 ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195K2871999-06-16016 June 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20207F4351999-05-0404 May 1999 Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504 ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199H5931999-01-20020 January 1999 Safety Evaluation Accepting Thermo-Lag Re Ampacity Derating Issues for Plant ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20155B6781998-10-28028 October 1998 Safety Evaluation Accepting Proposed Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237E3171998-08-21021 August 1998 ISI Summary Rept of Eleventh Refueling Outage Activities for Davis-Besse Nuclear Power Station ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20236R1441998-07-15015 July 1998 SER Related to Quality Assurance Program Description Changes for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236K3981998-06-30030 June 1998 SER Accepting in Part & Denying in Part Relief Requests from Some of ASME Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Davis-Besse Nuclear Power Station,Unit 1 ML20236K5131998-06-29029 June 1998 Safety Evaluation Accepting Proposed Alternate Emergency Operations Facility Location for Davis-Besse Nuclear Power Station,Unit 1 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20196B5221998-05-23023 May 1998 10CFR50.59 Summary Rept of Facility Changes,Tests & Experiments Dbnps,Unit 1 for 960602-980523 ML20236E7581998-05-19019 May 1998 Rev 0 to Davis-Besse Unit 1 Cycle 12 Colr ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20217P8041998-04-0707 April 1998 11RFO OTSG ECT Insp Scope ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20199G6321998-01-26026 January 1998 Rev 1 to Davis-Besse Unit 1,Cycle 11,COLR ML20198R4771998-01-13013 January 1998 SER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20217K6401997-12-31031 December 1997 1997 Annual Rept First Energy ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] |
Text
. _
.o AVERAGE DAILY UNIT POWER LEVEL DOC K ET .s'O.
50-346
, 3gy Davis-Besse Unit 1 DATE _
COMPLETED BY Bilal Sarsour
' TELEPilONE (419) 259-5000, Ext. 384 MONT11 November, 1981 DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 772 0
= 17 2 772 18 0 3 771 39 0 4 . 772 20 0 5 631 .
21 0 6 657 22 0 7 519 23 0 8 512 2.g 0 1
9 515 25 0 10 511 26 0 II. 511 27 0 12 510 0 28 13 460 29 0 34 2 0 30 15 0 3; 16 0 INSTRUCTIONS On this formai. list the a>cra;.c daily unit power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole megawait.
(9/77) 8211110387 811207 DR ADOCK 05000346 PDR
=_ _
~
L OPERATING DATA REPORT DOCKET NO. 50-346 DATE CO51PLETED BY Rilal Sarsour TELEP110NE (419) 259-5000, Ext. 384 OPERATING STATUS Davis-Besse Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period: November, 1981 .
- 3. Licenwd Thermal Power (StWt): 2772
- 4. Nameplate Rating (Gross 5tWe): 925
- 5. Desiga Electrical Rating (Net 5tWe): 906
- 6. 71aximum Dependable Capacity (Gross $1We): 934
- 7. Afaximum Dependable Capacity (Net 31We): 890
- 8. If Chan;;es Occur in Cipacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lesel To Which Restricted,if Any (Net 5fWe): ,
- 10. Reasons For Restrictions,if Any:
This 5fonth Yr..to Date Cumulative II. liours in Reporting Period 720 8,016 37,325
- 12. Number OfIlours Reactor Was Critica] 314.8 5.426.1 19.810.3 .
- 13. Reactor Reserve Shutdown llours 405.2 849.7 3.731.8
- 14. Ilours Generator On Line 313.1 5.224.4 18.272.2
- 15. Unit Re>ene Shutdown flours 0 0 1.731.4
- 16. Gross Thermal Energy Generated (51Wil) 667,941 12,366,497 39,271,303 .
- 17. Gross Elect ical Energy Generated (51Wil) 202.905_,.. 4.098.941 13.074.275
- 18. Net Electrical Energy Generated (51Wil) 181.671 1.839.771 12.104.272
- 19. Unit Senice Factor 43.5 65.2 49.7
- 20. Unit Availability Factor 43.5 65.2 54.6
- 21. Unit Capacity Factor (Using SIDC Net) - 28.7 53.8 38.2
- 22. Unit Capacity Factor (U>ing DER Net) 28.2 52.9 37.5
- 23. Unit Forced Outage Rate 0 26.9 25.3
- 24. Shutdowns Scheduled Oser Next 6 51onths (Type. Date,and Duration n. Each t:
Refueling Outage From February 26, 1982 - Pay 21, 1982 .
- 25. If Shut Down At $nd 0,f Report Period. Estimated Date of Startup: . _ _ December 2. 1981
- 26. Unit, In Test Statu> (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY CO\1NIERCIA L OPER AllON (9/771
9 DOCKET NO. 50-346 ,
UNIT SHUTDOWNS AND POW' t REDUCTIONS UNIT NAME Davis-Hosse Unit 1 ,
DATE COMPLETED ilY Bilal Sarsour REPORT MONTil November, 1981 TELEPIIONE (41H 259-5000. Ext.
384
~
e.
_ E E
- , .! ? 3 $ .Y 5 jss Licensee jg {% Cause & Corrective Action to No. Date R 5g i Event g e.1 H
5 $ j,3 g Report
- idu? yV Prevent Recurrence-5 17 , 18 11 7 F 0 A 5 Reactor power was reduced due to a leaking extraction steam line expan-sion bellows in No. 1 Low Pressure Turbine to No.1 De'a erator.
18 81 11 14 S 406.9 A 1 The unit was taken off line due to .
' indications of further degradation of extraction line bellows.
. See Operational Summary for further details.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Schedu!cd A.Eituipment Failure (Explain) 1 Manual for Preparation of Data D. Maintenance of Test 2 Manual Scrani. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. .
Event Report (LER) File (NllREG-D 'tei;ulstory Restriction 4 Continuation from Previous Month 0161) l.Operato Ti ;ning& License ExPmination 5-Load Reduction F Administrative 9-Other (Explain) S
- G Operational Etrur (Explain) Exliibit 1 - Same Source C1/77) Il Other (Explain)
. i
OPERATIONAL
SUMMARY
November, 1981
~
I 11/1/81 - 11/12/81 Reactor power was maintained at 95% (power was reduced to 95% due to a leaking extraction steam bellows expansion joint i in No. 1 Low Pressure Turbine to No. 1 Deserator) until 0925 hours0.0107 days <br />0.257 hours <br />0.00153 weeks <br />3.519625e-4 months <br /> on November 5, 1981, when reactor power was reduced to approximately 83%. This power level was maintained until November 7, 1981, when it was further reduced to 66%. These reductions of power were necessary due to indications of (
further degradation of the expansion joint. l 11/13/81 - 11/30/81 A manual reduction of reactor power was initiated at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on 11/13/81 for an expansion joint outage. The unit was manually taken off-line at 0103 hours0.00119 days <br />0.0286 hours <br />1.703042e-4 weeks <br />3.91915e-5 months <br /> on November 14, 1981, for the planned expansion joint outage. A total of five expansion joints were replaced during this outage.
e e
E e
P E
4
c .
November, 1981 DATE:
REFUELING INFORMATION
- 1. Name of facility: Davis-Besse Unit 1 February 26, 1982
- 2. S:heduled date for next refueling shutdown:
May 21, 1982 3., Scheduled date for restart following refueling:
- 4. Will refueling or resumption of operation thereafter require a technical If answer is yes, what, specification change or other license amendment?
in generel, will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Ccamittee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
Reload analysis is scheduled for completion as of January, 1982. No technical specification changes or other license amendments identified to date.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information. February. 1982 e.g., new or
- 6. Important licensing considerations associated with refueling, different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures. -
None identified to date J
- 7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool. ,44 - Spent Fuel Assemblies 177 (b) 8 - New Fuel Assemblics (a)
- 8. The present liaensed spent fuel pool storage capacity and the size of any incretse in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. .
735 Increase size by 0 (zero)
Present
- 9. The projected date of the last refueling that can le' discharged to the spent .
fuel pool assuming the present licensed capacity.
fuel Date 19BC - assuming ability to unload the entire oore into the spent pool is maintained .
-