ML20066D460

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1982
ML20066D460
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 10/01/1982
From: Kelly W
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20066D426 List:
References
NUDOCS 8211110348
Download: ML20066D460 (4)


Text

-

MONTHLY NARRATIVE REPORT OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of September, 1982. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is' no significant operating experience or major safety related maintenance to report.

No challenges to the PORV's or safety valves have been made. Furthermore, no changes have~ been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

8211110348 821004 PDR ADOCK 05000275 R PDR

69-10810 (25) 9/77 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-275 UNIT Diablo Canyon Unit 1 DATE 10/1/82 COMPLETED BY W.J. KELLY -

TELEPHONE (805)595-7351 MONTH Septeraber, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) IMWe-Net) 0 17 0 1

0 18 0

2 0 i, 0

3 0 2o 0

4 0 0 5 21 0

6 0 22 0 0 7 23 0 0 8 24 0 25 0

9 0 0 10 26 O 27 0

II 0 0 12 28 0 0 13 29 0 3o 0

I4 0 3, 15 16 0 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(0177)

~

, 69-10807 (25) 9/77 OPERATING DATA REPORT ,

DOCKET NO.-

50-275 DATE 10/1/82 COMPLETED BY W.J. Keily TELEPHONE (805)595-7351 OPERATING STATUS

1. Unit Name:

Diablo Canyon Unit 1 Notes

2. Reporting Period: SeDtember 1982
3. Licensed Thermal Power (MWt):

166.9

4. Nameplate Rating (Gross MWe): 1170
5. Design Electrical Rating (Net MWe): 1084
6. Maximum Dependable Ca'pecity (Gross MWe): 1134
7. Maximum Dependable Capacity (Net MWe): 1084
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NONE

9. Power Level To Which Restricted,if Any (Net MWe): 10. Reasons For Restrictions.lf Any: Suspended Low Power Test License This Month Yr.-to-Date Cumulative i1. Hours In Reporting Period 0 0 0 0 0 0
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) 0 ,_

0 0

18. Net Electrical Energy Generated (MWH) 0 0 0 19 Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Nett U/A _
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup: November, 1982 (fuel load)
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY JAN. 1983 INITIAL ELECTP,1 CITY JAN. 1983 COMMERCIAL OPERATION APRTl N3 (9/77I

69-10809 (25) 9/77 DOCKET NO. 50-275 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAME Diablo Canyon Unit 1 DATE 10/1/82 REPORTMONTH September 1982 COMPLETED BY W.d. KeIly 4

TELEPHONE (805)595-7351 We

- E . E No. Date g

!E 3 }Yh Licensee ,E g E*o o Cause & Corrective

,g5

[l 3g @ Event u? a Action to H NO u c3 E 5 jdg Report

  • Prevent Recurrence 6

810928 F 0 H 4 81-002/0lT ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation errors. Reanalysis and reviews are being conducted in accordance with Commission's instructions I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 016I)

E-Operator Training & Ucense Examination F-Administ rative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (E xplain) l l .

i . ..