ML20066D386

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1982
ML20066D386
Person / Time
Site: Beaver Valley
Issue date: 09/15/1982
From: Weaver L
DUQUESNE LIGHT CO.
To:
Shared Package
ML20066D339 List:
References
NUDOCS 8211110312
Download: ML20066D386 (1)


Text

. _

i OPERATING DATA REPORT DOCKETNO. 50-334 DATE 4 19-R7 COMPLETED BY L. W. Weaver TELEPHONE. 412-643-1829 OPERATING STATUS

1. Unit Name: Beaver Valley Power Station, Unit #1 Notes
2. Reporting Penod:

61 1982

3. Licensed Thennal Power (MWt):

2o

4. Nameplate Rating (Gross MWe):

923

5. Desagn Electrical Rating (Net MWe):

852

6. Maximum Dependable Capacity (Gross MWe):

860

7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (items Nurnber 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,if Any (Net MWe):

No"*

10. Reasons For Restrictions,If Any:

N/A This Month Yr..to Dete Cumulative

11. Hours In Reporting Period 756 9 0c7 I4 791
12. Number Of Hours Resctor Was Critical 517.'

467 ?

?1 606.5

13. Resctor Reserve Shutdown Hours 0

0 4.482.8

14. Hours Generator On-Line lao A AAo A on 691.7
15. Unit Reserve Shutdown Hours a

n 0

16. Gross Thermal Energy Generated (MWH) 07; 7

'975.L22.7 44.604.363.18

17. Gross Electrical Energy Generated t'MWH) 107 600 107 600 13.95r.040 s
18. Net Electrical Energy Generated (MWH) 286.849 257.548 12.752,124
19. Unit Service Factor 61 1 4?

19.0

20. Unit Availabihty Factor A3.1 9.2 39.0
21. Unit Capacity Factor (Using MDC Ne )

&7.6 6.1 31.6

22. Unit Capacity Factor tUsing DER Net) a; 1 9.9 30.1
23. Unit Forced Outage Rate 10.6 10.6 39.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

4

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Pnot to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIA L OPERATION N/A N/A 8211110312 821006 DR ADOCK 05000334 PDR

.