ANN 4 AVERAGE DAILY UNIT POWER LEVEL b 5 50-387 ft) '

DOCKET NO.

L- "4 UNIT One h O DATE 8 October. 1982 COMPLETED BY Linne A. Kuczynski RIC si TELEPHONF. (717) 542-2181 MOND{ Rnnenmkov 10R7 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I Zero g7 Zero 2

28# Zero 18 Zero g Zero 3

4 Zer 20 Zero 5 Zer Zero 21 2"# *#

6 22 Zero Zero 7

Zero Zero 8 24 2"Y Zero 9 M 10 26 Zero Zero

!! 27 12 Zer 2"#

28 l

,3 Zer '

29 Zero Zero 14 30 15 Zero 3, Zero Z#

16 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8211110184 821013 PDR ADOCK 05000387 R PDR

h ,

h) Q,\$

W$) ,3

/ i____i L PL L DM J OPERATING DATA REPORT N

$@ O ___

JC S 4s 0 DOCKET NO. 50-387 DATE ncenhor 8: 1982 COMPLETED BY L. A. Kuczynski TELEPHONE (7171542-2181 OPERATING STATUS

1. Unit Name: Susauehanna steam Electric Station Uniti fntialcriticalityachieved
2. Reporting Period: September. 1982 on 10 Sep. 82 at 2317. Reactor 3293 critical for approx. 327 hour0.00378 days <br />0.0908 hours <br />5.406746e-4 weeks <br />1.244235e-4 months <br />
3. Licensed Thermal Power (MWt):  ;
4. Nameplate Rating (Gross MWe): 1280 x 0.9 = 1052 to support testing and
5. Design Electrical Rating (Net MWe): 1052 - 41 = 1011 training.
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
  • *MDC to be determined.
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):Z. "#
10. Reasons For Restrictions,If Any: Unir in Tnirini non eun /i nu pnunr ;p rine nhnen License restriction to 5% thermal power. Turbine Generator will not he synchronized at or below 5%.

This Month Yr.-to.Date Cumulative

11. Hours in Reporting Period 0 0 0
12. Number Of Hours Reactor Was Critical 0 0 0 0 0 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line o n n
15. Unit Reserve Shutdown Hours o n n
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) 0 0 0
18. Net Electrical Energy Generated (MWH) n n n
19. Unit Service Factor N/A
20. Unit Availability Factor N/A _
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate M/^
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Pre-Turbine roll, October 4 through 11, 1982

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status iPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 9/07/82 9/10/82 INITIAL ELECTRICITY 10/30/82 COMMERCIAL OPERATION 5/15/83 (9/77)

gANN4 4 '

a P& . '

  • l-f p(p E f\ m2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.30-387 UNIT NAME Susquehanna Unit 1 DATE 10/8/82 y&lC d REPORT MON 71f September , 1982 COMPLETED BY T- A - Knc7vnnki TELEPHONE (717)542-2181 X '!40

. "h -

c.

.! E };; Ik Licensee E t, vl, Cause & Corrective No. Date 3g ,g5 Event u7 o3 Action to H

$I $ jgg Report # AO jU Prevent Recurrence S

820910 F 11.1 11 3 N/A ID INSTRU Rx scram on IRM "11" lli HI Signal.

Operator downranged IRM based on CRT reading which was giving a false low indication. Shorfing. links were removed at the time.

820916 F 17.5 A 1 82-022/03L IC VALVEX Condensate rej ect valve cycling caused CRD pumps to trip on low suction pressure. After two CRD accumulator low pressure alarms were received, operator scrammed plant.

820922 F 55.4 B 1 N/A ZZ ZZZZZZ Manual scram performed from low power to facilitate repair activities 820929 S 17.5 B 1 N/A ZZ ZZZZZZ Manual scram in response to testing activities.

820920 F 10.2 A 3 N/A CH PUMPXX Reactor scrammed on low water level due to loss of the feedwater pump being used for level control. Pump tripped on loss of suction pressure caused by logic problem in Condensate Demineralizer System.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-01her (Explain) 0161)

E-Operator Training & Licene Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain)

PP6L FORJ 15

~

Q SUSQUEHANNA STEAM ELECTRIC STATION -

Docket Number 50-387 Date 10/8/82 Completed by: L.A. Kuczynski Telephone (717)S42-2181 September, 1982 Challenges to Main Steam Safety Relief Valves None.

Changes to 'Offsite Dose Calculation Manual None.

Major Changes to Radioactive Waste Treatment Systems The following change was approved by the PORC during the month of September:

The Caseous Radwaste System is being modified by adding additional drain pots to the Unit 1 and common offgas delay lines. This will remove excess water entrained in the offgas flow. The new drain pots will be located immediately upstream of the inlet HEPA filters.

PENNSYLVANI A POWE R & LIGHT COMPANY