Requests That NRC Make Appropriate Arrangements to Have Dedicated ENS & HPN Installed at Proposed,Combined EOF at Coatsville,Pa.Facility Currently Scheduled for Completion by Nov 1991
ML20066D033
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 01/08/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9101140068
Download: ML20066D033 (2)


Text

{{#Wiki_filter:- l l l ~ PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD, WAYNE, PA 19087 5691 (tll) 640 6000 i January 8,-1991 Docket Nos.-50-352 i 50-353 3 277-50-278 License Nos. NPF-39 NPT-85 DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn Document control Desk' Washington, DC 20555 I

Subject:

Limerick Generating Station, Units 1 and 2-2 Peach Bottom Atomic Power Station, Units 2 and-3 Installation of Emergency Notification System and llealth Physics Network Capabilities at the Proposed Combined Emergency Operations Facility l Gentlemen: This letter is being submitted to request that-the Nuclear Regulatory Commission (NRC) make the appropriate arrangements to have the dedicated Emergency Notification System (ENS)-and-Health Physics Network (llPN) system' installed at the proposed _ combined Emergency Operations Facility (EOF) for Limerick _ Generating Station (LGS) and Peach Bottom-Atomic Power Station (PBAPS),:which is to be located in Coatesville, Pennsylvania.- i i By letter dated March 29, 1990, the-NRC approved' Philadelphia-I- Electric Company's (PECo's) -request to. construct a_ new combined -EOF for LGS and PBAPS adjacent.to:our existing--Coatesville Service Enilding facility. The proposed Coatesville EOF'is currently under design and is scheduled for completion by November, 1991.- We 9101140068 91010e o -{DR ADOCK 05000277 PDR

i U.S. Nuclear Regulatory Commission January 8, 1991 l Document Control Desk Pace 2 j i i understand that adequate lead time is necessary to ensure that ENS and HPN capabilities will be available upon completion of our new l EOF facility. Therefore, we would appreciate the NRC's aesistance regarding the installation of these dedicated systems in order to i support our construction schedule. 1 4 If you have any questions, or require additional information, please do not hesitate to contact us, a sincerely,yours, lY 4Cf/f S% C. J. Beck Manager Licensing Section Nuclear Engineering and Services cc: W. T. Russell, Administrator, Region I, USNRC l T. J. Kenny, USNRC, Senior Resident Inspector, LGS J. J. Lyash, USNRC, Senior Resident Inspector, PBAPS i l i l t}}