ML20066D028
| ML20066D028 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 09/15/1982 |
| From: | BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20066D016 | List: |
| References | |
| PROC-820915-03, NUDOCS 8211110114 | |
| Download: ML20066D028 (34) | |
Text
.
G Page 1 of 17 Rev.
8 Change 2 O
CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
i 4
1.0-6 4
11 5
1.0-7 4
iii 8
1.0-8 4
iv 8
1.0-9 4
v 4
1.0-10 4
vi 5
1.0-11 5
vii 5
1.0-12 5
viu 5
1.0-13 5
O ix 5
- 2. 0- 1 1
x 4
2.0-2 1
xi 6
2.0-3 3
xii 4
2.0-4 3
xiii 4
- 2. 0-5 3
1.0- 1 1
2.0-6 3
1.0-2 1
2.0-7 2
1.0-3 6
2.0-S 2
1.0 4 4
2.0-9 2
1.0-5 4
2.0-10 3
O 1
8211110114 821102 PDR ADOCK 05000317 F
Page 2 ofi7 Rev.
S-Change 4 h
CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST CF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
2.0-11 2
- 3. 2-3 2
2.0-12 2
3.24 2
2.0-13 2
3.2-3 2
2.0-14 2
3.2-6 2
2.0-15 2
3.2-7 2
2.0-16 2
3.2-3 2
2.0-17 5
3.2-9 2
2.0-13 5
3.3-1 3
~
2.0-19 2
- 3. 3-2 3
2.0-20 3
3.3-3 3
2.0-21 3
- 3. 2-1 3
2.0-22 3
- 3. L 2 3
l 2.0-23 3
3.L3 5
3.0-1 2
3.5-1 3
Sec:icn 3.1-See List of Ch. a
- 3. 5-2 3
Eff ective Pages in Sec. 3.1
- 3. 5-3 3
3.2-1 3
- 3. 5 ;
3
- 3. 2-2 3
3.5 '
3 0
Page 3 of 17 Rev.
3 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
3.C 2 5
3.3-3 5
3.6-3 5
3.9-1 3
3.6-4 5
3.9-2 4
3.6-5 3
3.9-3 5
3.6-6 3
3.10-1 3
3.6-7 3
3.10-2 4
3.6-3 2
3.10-3 5
O 36-9 2
4.0-1 6
3.6-10 2
4.1-0 4
3.6-11 2
4.1. I-1 5
3.6-12 3
4.1.1-2 5
~
3.6-13 3
4.1.1-3 5
^
3.6-14 3
4.1.14 5
3.6-15 3
4.1. 2-1 3
3.7-1 5
4.1. 2-2 5
3.7-2 3
4.1.2-3 5
3:3-1 4
4.1.24 3
3.3-2 4
4.1.2-5 3
O
Page 4 6f 17 Rcv.
8 Chang 2
- CALVERT CLIFFS NUCLEAR POWER PLANT g
E.NIERGENCY RESPONSE PLAN IMPLE.stENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGC REV.
ERPIP PAGE REV.
4.1. 2-6 3
4.1. 7-1 1
4.1.2-7 3
4.1.7-2 6
4.1. 3-1 7
4.1.3-1 2
4.1.3-2 3
4.1.9-1 2
4.1. 4-1 6
4.1.9-2 6
4.1. 4-2 6
4.1.10-1 2
4.1.5-1 3
4.1.10-2 6
4.1.5-2 3
4.1. I 1-1 1
4.1.5-3 6
4.1.12-1 1
4.1.3 a 6
4.1.I2-2 2
4.1. 5-5 6
4.1.12-3 2
4.1.5-6 3
4.1.12 2 2
4.1.5-7 3
4.1.k2-3 2
4.1.5-3 3
a.1.12-6 6
3.1.5-9 3
.1.13 '
6 4.1.5-10 2
4.1.13-2 5
Sec:icn 2.1.6-5ee Lis: of c's.
J.
2.1,14-1 6
Eff ec-ive Pages in Sec. 2.1.6 a '..u2 3
0
Page 5 of 17 Rev.
3 Change 4 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
4.1.15-1 3
4.1.18-4 6
4.1.15-2 6
4.1.19-1 6
4.1.15-3 5
4.1.20-1 2
4.1.15-4 5
't.1. 20-2 6
4.1.15-5 5
Section 4.1.21-See List of Ch. 4 4.1.15-6 5
Effective Pages in Sec. 4.1.21 4.1.15-7 5
4.1.22-1 6
4.1.15-8 2
4.1.23-1 6
4.1.16-1 3
4.1.24-1 5
4.1.16-2 3
4.1.25-1 4
4.1.16-3 6
4.1.25-2 4
4.1.17-1 2
4.1.25-3 4
4.1.17-2 2
4.1.25 4 6
4.1.17-3 4
4.1.25-5 1
4.1.17-4 6
4.1.25-6 1
4.1.1 S-1 2
4.1.25-7 1
4.1.IS-2 1
4.1.25-8 1
4.1.13-3 2
4.1.25-9 4
O
Page 6 of 17 Rev.
3 Change 4 CALVERT CLEFS NUCLEAR POWER PLANT a
E.MERGENCY RESPONSE PLAN W
IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES __
ERPIP PAGE REV.
ERPIP PAGE
_R EV.
4.1.25-10 4
- 4. 3.1.1-3 5
4.1.25-11 4
4.3.1.1 4 5
Section 4.2 - See list of 4.3.1.1-5 2
effective pages in Sec 4.2 4.3.1.1-6 3
4.3-0 4
- 4. 3.1.1-7 5
4.3-1 2
- 4. 3.2-1 2
'!. 3.1. t 6
- 4. 3. 2-2 7
- 4. 3.1-2 4
- 4. 3.2-3 2
g 4.3.1-3 3
4.3.2 u 7
4.3.14 3
- 4. 3.2-5 7
- 4. 3.1-5 3
4.3.2-6 1
4.3.1-6 3
a.3.2 7 1
4.3.1-7 4
4.3.3-t 7
3.3.1-3 3
- a. 3. 3-2 3
- 2. 3.1-9 a
secticn a. 3. a-S ea L.s :f 3,,,
4.3.1-10 3
Eff ec-ive Pages in Sec 4.3.
a.3.1.1-1 2
- a. 2-1 6
- 2. 3.1.1-2 3
- a. 2. ; '
3 0
Page 7 of 17 Rev.
3 Change 2 O
CatvEar CtiPPS NUCteaa POwea PtaNT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE R EV.
ERPIP PAGE REV.
- 4. 4.1-2 3
- 4. 4. 3-5 8
- 4. 4.1-3 8
4.4.3-6 1
- 4. 4.1-4 8
4.4.3-7 3
4.4.1-5 3
- 4. 4.3-8 4
- 4. 4.1-6 3
4.4.3-9 4
4.4.1-7 2
- 4. 4. 4-1 3
4.4.1-8 3
- 4. 4. 4-2 8
Q
- 4. 4.1-9 5
- 4. 4. 4-3 8
- 4. 4. 2-1 8
- 4. 4. 4-4 3
- 4. 4.2-2 8
4.4.5-1 8
- 4. 4. 2-3 8
- 4. 4. 5-2 3
- 4. 4. 2-4 2
- 4. 4.5-3 3
4.4.2-5 8
4.4.5-4 3
4.4.2-6 2
- 4. 4. 5-5 3
- 4. 4. 3-1 3 -
- 4. 4. 5-6 1
- 4. 4.3-2 8
- 4. 4. 5-7 5
4.4.3-3 3
4.4.5-3 3
4.4.34 3
- 4. 4. 5-9 3
0
Paga 3 'of 17 Rev.
3 Change 'A CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN g
IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE R EV.
ERPIP PAGE REV.
- 4. 4. 6-1 2
4.4.7.3 a 4
- 4. 4.6-2 2
- 4. 4.7.3-3 4
4.4.6-3 2
4.4.7.3-6 4
4.4.63 3
- 4. 4.7.3-7 4
- 4. 4. 6-3 6
4.2.7.3-3 2
- 4. 4. 6-6 6
4.4.7.3-9 4
4.4.7-1 9
4.4.7.3-10 4
4.4.7.I-1 2
- 4. 4.7.3-t i 4
- 2. 4. 7.1-2 2
4.4.7.3-12 4.4.7.1-3 8
- a. a.7.3-13 4
4.4.7.1 3 2
- a. a. 7.1-L a
3.2.7.1-3 2
- 4. 3.7. ' - 2 3
4
- 3. 2. 7.1-6 1
c.a 7.1-3 4
2.2.7.1-7 2
2.a,7.a a a
Sec-icn 2.2.7.2 See lis: cf C2.
- s. 2.,. - 5 1
Eff ective Pages in Secticn 2.3.7
.a.7. -6 4
- a. 2.7.3-1 4
- a. 2. 7. s 7 2
- 2. 2.7.3-2 2
- 2. 2.,. 2,3
- 2. 4. 7. 3-3 O
Page 9 of 17 Rev.
3 Change 2 O
CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
4.4.7.4-9 4
- 4. 4.9-8 8
4.4.7.4-10 4
- 4. 4.9-9 8
- 4. 4.8-1 8
4.4.9-10 8
- 4. 4.8-2 8
4.4.9-11 8
4.4.8-3 8
4.4.9-12 8
- 4. 4.8.1-1 2
4.4.9 13 8
- 4. 4.8.1-2 2
4.4.9-14 8
- 4. 4.8.1-3 2
4.4.9-15 8
- 4. 4.3.1-4 8
4.4.9-16 8
4.4.8.1-5 2
4.4.9-17 3
- 4. 4.9-0 6
4.4.9-18 8
4.4.9-1 6
4.4.9-19 8
- 4. 4.9-2 3
4.4.9-20 8
~
- 4. 4.9-3 8
4.4.9-21 3
- 4. 4.9-4 6
4.5-1 4
- 4. 4.9-5 6
- 4. 5.1-1 2
4.4.9-6 8
- 4. 5.1-2 2
- 4. 4.9-7 3
- 4. 5.1-3 2
O
Page 10 of 17 Rev.
8 Change 2 CALVERT CLIFFS NUCLEAR POWER PLANT g
EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERP!P PAGE REV.
a.5.1 1 2
4.5. 3-5 2
4.5.1-5 8
4.5.3-6 2
4.5.1.1-1 4
- 4. 5. 4-1 2
4.5.1.2-1 1
4.5. 4.1-1 S
4.5.1. 2-2 4
- 4. 5. 4.1-2 3
4.5.1.2-3 2
4.5.4.2-1 5
u.5.1. 3-1 4
4.5. 4. 2-2 2
- 4. 5.1.3-2 4
4.5.5. I 2
h 4.5. 2-1 3
- 4. 5. 5-2 2
4.5.2-2 3
a.5.5-3 2
4.5.2-3 3
4.5.53 2
c.5.2 a 3
- 4. 5.6-1 2
4.5.2-5 3
a.5.6-2 3
3.5.2-6 2
- a. 5.6-3 2
a.5.3-1 2
- .5.6 u 1.5.3-2 2
1.5.6-5 2
3.5.3-3 5
2.5.6-6 2.5.3--
3
.5.6-7 O
l
Page 11 of 17 Rev.
8 Change 2 O
CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
4.5.6-8 2
4.6.3-2 2
4.5.6-9 2
4.6.3-3 2
4.5.6-10 2
4.6.3-4 4
4.6-1 4
4.6.3-5 4
4.6.1-1 2
- 4. 6. 4-1 2
4.6.1-2 7
4.6.4-2 2
4.6.1-3 2
- 4. 6. 4-3 2
4.6.1-4 2
4.6.4-4
'2
- 4. 6.1-5 2
4.6.4-5 2
4.6.1-6 3
4.6.4-6
'2 4.6.1-7 2
4.6.4-7 2
4.6.2-1 2
4.6.4-3 2
- 4. 6. 2-2 2
4.7-1 3
4.6. 2-3 2
4.S-0 4
4.6.2-4 2
4.3-1 2
4.6.2-5 1
4.3-2 2
- 4. 6.2-6 2
4.3-3 2
4.6. 3-1 1
4.8. I-1 2
4.3.1-2 3
O
Page 12 of 17 Rev.
8 Change 2 CALVERT CLIFFS NUCLEAR POWER PLANT h
EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
4.3.1-3 3
4.9-2 2
4.3.1-4 4
4.9.1-1 2
4.3.1-5 3
4.9.1-2 2
4.3.1-6 5
4, 3.1-3 2
4.3.1-7 4
4.9.21 2
4.3.1-3 4
4.9.2-2 2
4.3.1-9 3
4.9.2-3 2
4.3.1-10 3
4.9.22 2
g 4.3.1-11 3
4.10-1 2
4.3.1-12 3
4.10-2 2
4.3.1-13 3
3.0-1 3
4.3.1-13a 3
5.0- 2 3
2.3.1-13b 3
3.0-3 3
2.3.1- ! 2 2
3.02 3
4.3.1-13 3
5.0-5 3
2.3.1-16 4
5.0-6 3
l 3.3.1-17 5
5.1-1 2
2.3. !- i 3 3
5.1-2 2
2.9-1 3
O
Page 13 of 17 Rev.
8 Change 2 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
5.1-3 2
- 5. 2-2 2
5.1-4 2
5.2-3 2
5.1-5 2
5.31 2
5.1-6 3
5.3-2 2
5.1-7 2
5.3-3 2
5.1-3 2
5.3-4 1
5.1-9 2
5.3-5 2
O 5 t-10 2
5.3-6 2
5.1-11 2
- 5. 4-1 3
5.1-12 2
5.4-2 3
5.1-13 2
5.4-3 3
5.1-14 2
5.44 3
5.1-15 4
5.4-5 3
5.1-16 4
5.4-6 5
5.1-17 3
5.a-7 5
5.1-13 4
5.4-3 5
5.1-19 3
5.4-9 5
5.2-1 1
5.4-10 5
O
Page la ef. 17 Rev.
3 Changa 2 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN g
IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
5.b 11 5
Effective Pages in Sec. 5.5
- 5. 4 12 5
A series see List of 5.bl3 5
Effective Pages in App.A.1
- 5. 4 14 5
B.1-1 3
5.b 15 5
B.1-2 2
5.b 16 5
B.1-3 3
5.4-17 5
B.1 A 2
- 5. 4 13 5
B.1-5 2
O 5.2-19 5
B.1-3 2
5.3-20 5
B.1-6 2
5.u-21 5
B.1-7 2
5.4-22 5
S.1-3 2
5.2-23 5
B.1-9 2
5.1-24 3
3.1-10 L
- 3. -25 3
S.1-i i 3
5.3-26 3
S.1- !:
3 3.a-27 3
S.1-13 3
Sec-icn 5.5 - See !is: cf S.1-12 O
Page 15 of 17 Rev.
8 Change 2 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
B.1-15 4
B.1-33 8
B.1-16 8
B.1-34 8
B.1-17 8
B.1-35 8
B.1-18 8
B.1-36 8
B.1-19 2
B.1-37 8
B.1-20 2
B.1-38 8
B.1-21 2
Section B.2 - See List of O
B.1-22 4
E11ective ee8esin Sec. B.2 B.1-23 8
B.3-0 5
B.1-24 2
B.3-1 5
B.1-25 8
B.3-2 2
B.1-26 8
B.3-3 A 1
B.1-27 8
B.3-3 B 2
B.1-28 4
B.3-4 2,
B.1-29 4
B.3-5 5
B.1-30 8
B.3-6 6
B.1-31 4
B.3-7 6
B.1-32 8
C-1 6
C.1-1 2
O
Page 16 of 17 Rev.
8 Change 2 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN h
IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
C.1-2 4
C.1-21 2
C.1-3 2
C.2.I 2
C.1-4 3
C.2-2 3
C.1-5 2
C.2-3 3
C.1-6 6
C.2 2 6
C.1-7 2
C.2-5 6
C.1-3 2
C.2-6 2
C.1-9 2
C.3-1 2
g C. I-10 6
C.3-2 3
C.1-11 3
C.3-3 6
C.1-12 3
C.3 a 2
C.1-13 3
C.3-5 3
C.1-la 2
C.3-6 2
C.1-15 3
C.3 7 2
C.1-16 3
C.3-3 2
C.1-17 3
C.3-9 2
C.1-13 2
C.3-iG 2
C.i-19 2
C.3-i 1 C. '-20 3
O
Page 17 of 17 Rev.
8 Change 2 O
CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _,
ERPIP PAGE REV.
ERPIP PAGE REV.
C.3-12 2
- 0. 3 1 8
C.3-13 3
0.3-2-2 8
C.4-1 6
D.3-2-3 8
C.4-2 6
C.4-3 6
C.4-4 6
C.4-5 6
~
C.4-6 3
C. 4-7 6
C.4-3 6
C. 4-9 6
C.4-10 6
0.1-1 2
D.1-2 2
D. 2-1 2
0.2-2 1
D.3-1 2
D.3-2 1
l
' O I
a
- -, - ~
,r
ERPIP NO.: 3.1/ REV. 3 e.
O TtTte: iniri^t ^crious ^"o eaeacescv ^cTro" tevets RESPONSIBLE INDIVIDUAL: SITE EMERGENCY COORDINATOR
-NOTE-Implement normal, abnormal or emergency operating procedures to correct or isolate the condition as necessary.
1.0 If the reported event is (check one):
( ) A LNG SPILL Implement ERPIP 3.2 & THEN continue this Procedure.
( ) A FIRE Implement ERPIP 3.3 & THEN continue this Procedure.
( ) A NATURAL EVENT Implement ERPIP 3.4 & THEN continue this Procedure.
( ) A PERSONNEL INJURY Implement ERPIP 3.5 & DO NOT continue this Procedure.
( ) A RADIOLOGICAL EVENT Implement ERPIP 3.6 & DO NOT continue this Procedure.
( )If none of the above are applicable, continue this Procedure.
Initials Time 2.0 Refer to EXHIBIT 3.1-B, EMERGENCY ACTION LEVELS. to determine if an Emergency Action Level has been met or exceeded. EXHIBIT 3.1-B Reviewed:
/
Initials Time 3.0 If an EAL has been met or exceecded, record the EAL met, EAL Designation,
, implement:
( ) ERPIP 3.7 if an UNUSUAL EVENT EAL & DO NOT Continue This Procedure
( ) ERPIP 3.3 if an ALERT EAL & DO NOT Continue This Precedure
( ) ERPIP 3.9 if a SITE EMERGENCY EAL & DO NOT Continue This Procedure
( ) ERPIP 3.10 if a G5NERAL EMERGENCY EAL & DO NOT Continue This Procedure IF an EAL has NOT BEEN MET or Exceeded, Continue This Procedure Initials Time 3.1-1 s
.,m
O gr 6
p O
ERPIP 3.1 REVIEW / APPROVAL REVISION CHANGE REVIEWER SIG/
SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG
/DATE 9
l bj1Y t'.4.hM 9' S b 121IC Y Lund/
9./42 77 e
M l
A
_W-We 68NM
Rev.
3 Change }
CALVERT CLIFFS NUCLEAR POWER PLANT a
EMERGENCY RESPONSE PLAN W
IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE REV.
ERPIP PAGE REV.
3.1-1 3
3.1-2 8
Change 1 3.1-3 3
3.1-4 3
3.1-5 3
3.1-6 3
3.1-7 3
3.1-8 3
3.1-9 3
3.1-10 3
3.1-11 3
3.1-12 3
3.1-13 3
3.1-14 3
3.1-15 3
3.1-16 3
O l
e ERPIP NO.: 4.1.6 / REV. 9 e
TITLE:
OFFSITE MONITORING TEAM LEADER CHECKLIST 1.0 RESPONSIBLE INDIVIDUAL The OFMTL is responsible to the RAD to monitor offsite gaseous radiological releases during emergencies for the purpose of minimizing personnel exposure and preventing unnecessary spread of contamination.
2.0 CONDITIONS AND PREREQUISITES When directed by the RAD or SEC per ERPIPs 4.1.15 or 3.6.
3.0 ACTIONS AND LIMITATIONS (In the ECC or offsite at a survey point determined by the RAD or at ERT Mobile Monitoring Unit).
-NOTE-Checklists are to be used as determined by the OFMTL. Spaces for initials and times are to be utilized, as necessary, to clarify the status.
3.1 As the initial action, announce to the other emergency workers who you are O
endthatyou erethe OeMrt.
Announced:
/
Initials Time 3.2 Obtain initial briefing from SEC, RAD, or the person you replace.
Briefed:
/
Initials Time 3.3 Have OFMT members obtain appropriate dosimeters based on anticipated radiation levels.
Desimeters Issued:
(Range)
/
Initials Time 3.3.1 Record each assigned OFMT members' name, TLD// and EWPi/ on RCP 3-301-1,"Calvert Cliffs Weekly Desimeter Record (Attachment 1).
4.1. 6-1
ERPIP NO.: 4.1.6 [REV, 9 i
Use preapproved EWP# 006 (less than 3.000 rem /qtr), EWP# 007 I
I (greater than 3.000 rem /qtr, but less than or equal to 100 rem acute exposure) or new EWP.
- CAUTION -
WOMEN CAPABLE OF REPRODUCTION SHALL NOT TAKE PART IN EMERGENCY EXPO 5URE LIMITS (EWP #007) GREATER THAN 3.000 REM /QTR.
3.3.2 Obtain previous radiation exposure during current calendar quarter for assigned OFMT members from the DTL and record on RCP 3-301-
- 1. (Attachment 1)
- NOTE -
Items 3.3.1 thru 3.3.2 may be accomplished via radio or other communications after departure of OFMT to monitoring locations, but is to be accomplished as soon as possible to track team members radiation exposure status.
3.3.3 Based on radiological conditions, periodically contact OFMT members, obtain SRO readings, and record on RCP3-301-1 (Attactment 1). Have team member (s) rezero their SRD's af ter each time SRD readings have been recorded.
3.3.4 Report OFMT members (s) current accumulated exposures to RAD.
t 4.1.6-2
r-
{
ERPIP NO.: 4.1.6 / REV. 9 Q
3.4 Have OFMT members proceed to designated monitoring points as directed by the RAD and implement ERPIP 4.3.1.
ERPIP 4.3.1 Implemented:
/
Initials Time
-NOTE-1.
Per ERPIP 4.3.1, pick up radio (if vehicle radio is unavailable) and Emergency Monitoring Kit at the South Guard House.
2.
Operate equipment with battery power supplies conservatively.
3.
Ensure accurate and detailed records are made of all radiation levels arid air sample surveys and results are communicated to the RAD (Forms s
found in ERPIP 4.3.1). Both positive and negative results must be reported.
-CAUEON-WHILE PROCEEDING THROUGH AREAS OF UNKNOWN RADIATION LEVEL, CONTINUOUSLY MONITOR AS APPROPRIATE TO ENSURE SAFETY.
O
- NOTE -
Unless otherwise directed by RAD sit air samples are to be taken with Silver Zeolite cartridges for radiciodine analysis.
3.5 Request new monitoring location from RAD.
3.6 Turn in all records / forms / checklists to.the RAD.
s 4
J
/
N, O
4.1.6-3
1 L
L L
L L
A A
A A
A 4
T T
T T
T O
O O
O O
6 T.
T.
T.
T.
T.
- l..
K K
K K
K W
W W
W 4
/
/
~~
Y R
T
/
N E
R UO s
Y R
O T
/
F D
E I
F IC E
P S
P w
S R
/
O P
r w
R
/
R UO Y
D N
1 A
T S
t R
n E
e D
m
/
N h
U Dc D
Ra N
t O
A t
CA
/
D E
A R
E R
R E
E I
/
T V
A E
H M
U S
O O
Y D
E Y
T L
A K
C I
E N
D EW I
S S
L A
F l
F i
i I
L N
C I
R f
T UO R
u L
O w
L O
I %
e Y
te eo E
T D
7 D
T V
T T
P S
U N
N te P
S U
W L
O I
to P
S 0
p S
U P
S U
L N
N N
w L
9 I
AI E
E w
L O
I A
S A
I s
AI E
E 5
A E
te A
/
I E
E to
/
E E
E
/
I E
E to P
T C
/
I E
E
/
P T
T P
T T
P T
T P
T T
N I
M M
M M
M w
I I
I A
w I
MI MI A
M M
w I
M I
A w
I I
I T
w I
I I
A N
N N
N R
I T
T D
H I
T T
R I
T T
D R
I T
T D
H I
T T
D 3
~
1 0 2 3
1 8
8 8
3
.v D.
D O
P e 8
T C R 7
T R
t e
.s
..; ?
.i
- g. l. ?
-. r.. <r..-'..~c-g~
9 r
..t
.c
. a.. :..... r-.. e... r. - <-
..; a
.s 2 ERPIP 4.1.6 REVIEW / APPROVAL
.. t '
. n t
s.. -
5
,,'q
..I REVISION CHANGE REVIEWER SIG/
SUPERVISOR POSRC PLANT SUPERINTENDENT DAT.E EPU SIG/DATE MTG
/DATE y
t s
l 1
1 b
Y,
'E g*
g 4
~...~'.7,."'
'.. - r wg-yw ;-
v pg.
T
.. r.
Page 4 b Rev 9' y I.
T CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN g
IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES_
ERPIP PAGE R EV.
ERPIP PAGE REV.
4.1. 6-1 9
4.1.6-2 9
4.1. 6-3 9
4.1.6-4 9
0
/
O
s
~
ERP!P NO.: 4.1.21/ REV. 6 O
AsSEusty AREA teADea CaeCxtisi 1.0 RESPONSIBLE INDIVIDUAL The Assembly Area Leader (AAL)is responsible for the following:
1.1 Account for all personnel designated to report to the assembly area.
1.2 Report accountability status to South Gate Security within 30 minutes of an announced assembly.
1.3 Complete and sign accountability forms.
1.4 Provice liaison between the assembly area personnel and the SEC when an unsafe conditicn or accident is identified or discovered.
1.5 When directed by the SEC, assist Security in the search for missing personnel.
2.0 CONDITIONS AND PREREQUISITES 2.1 SEC has instructed plant personnel to report to their designated assembly areas.
Q 3.0 ACTIONS AND LIMITATIONS (At the designated assembly area per SEC instructions.)
-CAU TION-NOTIFY ALL APPROPRIATE PERSONNEL OF YOUR NAME, THE KEY PERSONNEL POSITION YOU ARE ASSUMING, AND THE NAME OF THE PERSON YOU REPLACE.
APPROPRIATE PERSONNEL NOTIFIED:
/
Initials Time
-NOTE-1.
All personnel (except SEC, RPD, RAD, TSCO and OSCD) should report to their assembly area for accountability when directed by SEC.
l 2.
Checklists are to be used as determined by the AAL. Spaces for initials and l
times are to be utilized, as necessary to clarify the status.
l O 3.
The Controi acom may announce a.esuentiai reiease of essembir etees.
l 4.1.21-1 l
ERPIP NO.: 4.1.2f / REV. 3 Chmge1 4.
If contractor technicians have been assigned to your assembly area, report the h
names to Security-South Gate of those technicians for whom you have accounted.
3.1 Reporting Directly to Designated Assembly Area.
3.1.1 When plant personnel have been instructed to report to their designated assembly area, immediately proceed to your assigned assembly area. (See Appendix A.1, Table 2 for Assembly Areas)
Designated Assembly Area:
Name Time 3.1.2 Initiate personnel accountability and hold all personnel at the assembly area until directed by the SEC. Log all unaccounted personnel on the EMERGENCY ACCOUNTABILITY FORM., EXHIBIT 4.1.21-A.
-NOTE-After being accounted for, key emergency response persennel, and alternates from your assembly area, will reper* to the OSC (Outage g
Planning Recm), if appropriate. Team members will ce dispatened from there by the OSCO as required.
3.1.3 Ensure all SEC instructions are promptly relayed :o :he assembly area personnel.
Further Instructicn (if applicableh Assembly Area Personnel Briefed:
i Init:a'.s Time 3.1.4 Notify Scuin Gate Security of :he accountability results within :hir y (30) minutes using the plant telechene system (ext. 2695 cr ext. 2696).
CR 1
ESTL Notified:
/
Init:als Time
-NOTE-The ESTL will notify :ne SEC of :nese results.
2.1.21-2
s ERPIP No.: 4.1.21/ REV. 6 Avoid unnecessary use of communications equipment.
3.1.5 Ensure EMERGENCY ACCOUNTABILITY FORM is given to Security at South Gate or Perimeter Control Point immediately.
Log Given to Security:
/
Initials Time 3.1.6 Notify the Radiation Protection Director (RPD) at the ECC if an Assembly Area Monitoring Team Leader (AAMTL) fails to monitor your area within 30 minutes if a Radiological Event has occurred.
RPO Notified:
/
Initials Time 3.1.7 When directed by the SEC, personnel should evacuate the site via their assigned route and the perimeter control point. Record the alternate assembly area on the EMERGENCY ACCOUNTABILITY FORM, EXHIBIT 4.1.21-A.
Alternate Assembly Area:
Recorded on EXHIBIT 4.1.21-A: (if applicable)
/
Initials Time 3.2 Evacuation via the Perimeter Control Point 3.2.1 All personnel being evacuated should proceed through the Security Guard House area in an orderly manner (allowing for radiation monitoring by Gate and Access Monitoring Team (GAMT) or portal monitor if operating) to the plant parking lot.
l 3.2.2 Upon release, personnel are to leave the site via the perimeter control point.
3.2.3 Security will be responsible for accountability at the perimeter control point.
3.2.4 Security shall notify the ECC/SEC of the accountability results immediately using a radio-telephone.
ECC/SEC Notified:
/
Initials Time 3.2.3 All oersonnel shall have been monitored, as necessary, prior to release from the perimeter control point.
4.1.21-3 l
ERP!P NO.: 4.1.@l / R EV. 6 C
EXHIBIT 4.1.21-A EMERCENCY ACCOUNTABILITY FORM g,
Assembly Area Initials /Date The following personnel have not reported to me within an estimated reasonable time.
NAME
- POSSIBLE LAST LOCATION 1.
2.
3.
4 3.
6.
7.
9
^
10.
I1.
12..
+11 Unknown, write "UK" ACCCUNTASILITY INCOM PLETE NOTIFIED ESTL (Scuth Gate)
/
Assemoly Area Leacer Time ACCOUNTABILITY COMPLETE NOTIFIED ESTL (Soutn Cate)
/
Assemoty Area Leacer Time When completed, reper acccuntability within 30 minutes to ESTL and immediately thereaf ter, transmit this sheet to Security (Scuth Cate er Perimeter Centrol Point).
a.i.n u
b O
ERPIP 4.1.21 REVIEW / APPROVAL REVISION CHANGE REVIEWER SIG/
SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG
/DATE 9
l h Y f.K D%eszakShi}L %d Ib' ull 9/5L o
r
/'
e e
e o
1 i
d O
~
R e v.
3 Change 1 CALVERT CLEFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES _
ERPIP PAGE R EV.
ERPIP PAGE REV.
4.1.21-1 6
4.1.21-2 3
Change 1 4.1.21-3 6
4.1.21 a 6
O O
ERPIP NO.
4.3.4 / REV. 8 Change 1 Monitoring Performed at Perimeter O
Contrei eoint i
Initials Time 3.4.2 If prior personnel monitoring was performed at the Gate House, the Gate and Access Monitoring Team shall:
- CAUTION -
Request vehicle operator to engage emergency brake CH 1
and/or place vehicle in park before monitoring near wheels.
3.4.2.1 Monitor vehicles only (not plant personnel) at the perimeter control point.
3.4 '.2 Monitor the first five (5) vehicles and every tenth vehicle thereafter.
3.4.2.3 Monitor persons found outside the protected area fence but on the site boundar~y.
-NOTE-If contamination is detected on a vehicle, monitor all subsequent vehicles. Personnel or vehicles found to be contaminated will be directed to go to the Farm Demo Building for decontamination in accordance with ERPIP 4.5.5 and RCP 3-606.
3.5 ECC Monitoring The ECC Monitoring Team, (stationed in the ECC), shall monitor the ECC and nearby areas, as directed by the RPD or SEC.
3.6 Monitoring of Emergency Teams 3.6.1 The Emergency First Aid and Decontamination Team shall continuously know the location of and monitor all EFADT members exposed to radiation and any contaminated areas required to be accessed by those members.
3.6.2 The Reentry and Repair Monitoring Team shall continuously know the location of and monitor all Reeentry and Repair Team members exposed to radiation and any contaminated areas required to be accessed by those members.
3.6.3 Both the EFADTL and the ERMTL shall keep written records of the exposure of each of their respective emergency team members.
O
- 4. 3. 4-3
ERPIP NO.: 4.3.4 / REV. 8 Change 1 3.7 Dosimetry s
Complete exposure record of persons within the Protected Area shall be kept g
by the Dosimetry Monitoring Team Leader in accordance with 10CFR20.
O e
u.a.uu
'd
.\\
- e.
y.. ;.
i y
4
=-
.c.,...,,,.....,:
".~ w ~-'c?'
r-M 7,
~
- <,c..c r..: c t.
.f
- a'.
s fg ERPIP 413.'4 REVIEW / APPROVAL
~
=
..t..
=
i!-
REVISION CHANGE REVIEWER SIG/
SUPERVISOR POSRC PLANT SUPERINTENDENT DATE EPU SIG/DATE MTG
/DATE t
/
/
4 8
e
[ g L
't O
3
_g ty
..,4
. (-
..,v-
- r. - ;.7..-r.
5
}
- -. -- -g A
Paga 1 of 1 Rev 8 Change 1 O
CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES LIST OF EFFECTIVE PAGES_
ERPIP PAGE REV.
ERPIP PAGE REV.
4.3.4-1 7
- 4. 3. 4-2 2
4.3.4-3 8 Change 1 4.3.4-4 8 Change 1 O
.O