ML20066C479

From kanterella
Jump to navigation Jump to search
Forwards Simulator Certification Rept
ML20066C479
Person / Time
Site: Beaver Valley
Issue date: 12/18/1990
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20066C482 List:
References
NUDOCS 9101100143
Download: ML20066C479 (2)


Text

.

~_

.~Digamme @ Compar1ya7,va;" re- < staa" Shippingport. PA 15077 0004 OV f.7? 5'L... o,~,

December 18, 1990 NG1VPN:

6459 U.S. Nuclear Regulatory Comission Att: Document Control Desk Washington, D.C.

2055'i

Reference:

Beaver Valley Power Station, Unit No.1 BV Docket No. 50-334, License No. DPR46 Simulator Certification Report (10CFR55.45)

Gentlemen:

T u purpose of this letter is to submit the Certification Report for our Beaver Valley Unit 1 Simulator in accordance with.10CFR55.45.

Duquesne Light Company by forwarding tnis report.as required by p

10CFR55.45 (b) (5) (i) is certifying to the Commission that our Simulator facility (Eeaver Valley Unit 1 Plant Referenced Simulator) meets the Comissions regulations. Enclosed. with our' report 'is o completed Fors NRC 474.

If you should have any questions about this certification, please contact either rayself or members of m..taff.

9 Sincerely, l

r-

. D. Sieber Vice Presidenc Nuclear Group-JDS/TWB/pgs

~O

.L4 9'~1100143 901216 P1 AD*CK 05000334

..Y PDR l

..___.__z.,..

~ 'NGlVPN: 6459-Dbcember

_18.-1990 Page 2 O

j cc: Mr. Thomas E. Murley, Director, Office of Nuclear Reactor-Regulation j

-(with enclosure)-

Mr. J. Becil, Sr. Resident Inspector (w/o enclosure)

Mr. T. T. Martin, NRC Region 1 Administrator- (w/o enclosure)

Mr. L. H. Bettenhausen, Acting _ Chief Operation Branch Oivision of Reactor Safety, Region 1 (w/o enclosure)

Mr. R. M. Gallo, Chief Operator Licensing Branch (w/o enclosure)

Mr. A. W. DeAgazio Project Manager (w/o enclosure)

O L

F O

o e

e v -

,-r-*

r

.e s--,

,-.,--we-

-,-