ML20066B709

From kanterella
Jump to navigation Jump to search
Forwards Status Update of Corrective Actions to Address Deficiencies in Electrical Distribution Sys Functional Insp Repts 50-266/90-201 & 50-301/90-201
ML20066B709
Person / Time
Site: Point Beach  
Issue date: 12/28/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-134 VPNPD-90-507, NUDOCS 9101080273
Download: ML20066B709 (6)


Text

-.

.. - ~

- = _ _. -. - -

Wisconsin Electnc POWER COMPANY 231 w Menom Po ikw 20a w oace Wi!.3?oi Mums m.s VPNPD 507 NRC 134 December 28, 1990 i

Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

DQQXETS 50-266 AND 50-301 STATUS UPDATE ELECTRICAL DISTRIBUTION SYSIEM FUNCTIONAL INSPECTION POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 By letter dated August 3, 1990, we provided you with our response

.to Inspection Reports 50-266/90-201 and 50-301/90-201.

In that letter, we presented detailed plans and schedules for correction of each-of the deficiencies documented in the inspection reports.

As our efforts to address these deficiencies have progressed and the issues have been more thoroughly evaluated, we have found it necessary to modify our planned correcti"e action or completion dates for four of these deficiencies.

".te attachment to this letter contains our modified response to those four deficienc'7s.

For all of the other deficiencies our planned actions are either progressing in accordance with the schedule identified in our Augubt'3, 1990,. response or the actions have been completed.

The Point Beach resident inspectors are being kept informed of our progress.

We plan to submit a more detailed update regarding our progress in addressing the identified deficiencies during the first quarter'of 1991.

Please contact us if you have any questions.

Very truly,yours, c/

(?j, & ',

C. W.

Rayt Vice Pres dent Nuclear Power L

l Attachment

//

Copies to Regional-Administrator, Region III

'/,g NRC Resident Inspector, Point Beach

/g I

1 9101080273 901228 PDR ADOCK.05000266 i

j g

PDR AsAWh ofHiwwsht&ngrOvpvatker l -

. G,. ;$.3 7

l.

1

j-.*

e k.

1 REFICIENCY 90-201-1(1 EXCESSIVE DC VOLTAGE APPLIED TO EQUIPMENT TERMINALS STATUS:

We have further evaluated the rating of the closing coils in the 4160 volt i

switchgear and have determined that these coils have a maximum voltage rating of 140 VDC.

Evaluation nf the voltage rating of additional DC equipment is continuing.

At this time, we have not identified any 1

components incapable of operating at present float voltage levels.

We will continue to operate at the present float voltage levels until our evaluation is completed.

Therefore, we have not revised procedures RMP-46 and OI-33 to lower float voltage.

We operate our batteries at a slightly higher float voltage than is recommended by IEEE 485-1983.

The float voltage recommended by our vendor and the IEEE standard is based on a battery temperature of 77'F.

We have received information l

from our vendor, EXIDE, that it is appropriate to correct the float voltage for temperature.

This results in the higher float voltage used.

In-addition, an EXIDE representative has recently i

evaluated the condition of our batteries.

He noted that some cells showed signs of undercharging and stated that any further reduction in system voltage could-be detrimental ~and-was not recommended.

l' y

<,,..-~..,--,---:---.-..--..--.~.._...-,.~.~.--,..--.-...-

DEFICIENCY 90-201-15 INADEQUATE FUEL OIL SYSTEM SEISMIC CATEGORY 1 CLASSIFICATION STATUS:

Modifications to support the fuci pil piping in the control building have been completed and will limit the stresses on this piping to less than code allowables.

We have determined that it is not practicable to seismically support fuel oil and fire protection header piping in the upper portion of the pumphouse.

In addition, even if the piping were seismically supported, it cannot be protected from missile damage.

Therefore, in lieu of seismically supporting this piping, we have initiated a modification to seal the floor and provide a floor drain in the upper portion of the pumphouse to prevent flooding if piping in the upper portion of the pumphouse should rupture.

This is expected to be completed by July 31, 1991.

In addition to the above modification, we intend to review the feasibility of relocating the fuel oil transfer pumps to a location other than the fuel oil pumphouse.

The new location would be chosen such that the pumps would be protected from flooding concerns or other l

possible common mode failures.

The j

feasibility review will be completed by July 31, 1991.

A modification to evaluate and seismically support fire protection system piping in the lower portion of the pumphouse will be initiated by January 15, 1991.

i

_The stairs in the pumphouse have been l

analyzed for seismic adequacy.

Stresses l

on the stairs remain within operability allowable limits but exceed code allowable limits.

A modification will be completed by July 31, 1991 to support the stairs to limit seismic stresses within code allowable limits.

1 1

The concrete structure of the fuel oil pumphouse has been seismically analyzed and shown to be acceptable.

We have reviewed the block wall installation and have determined that the block walls are installed in a manner comparable with other seismic blockwalls installed at Point Beach.

11owever, the blockwalls cannot be qualified for tornado missile impact loading; and therefore, further analysis of these walls is not considered beneficial.

The modification discussed above will alleviate the blockwall concerns, sinco damage to the upper pumphouse piping caused by blockwall failure would not result in flooding of the lower pumphouse, t

l l

1

l s

e D]FICIENCY 90-201-16 FUEL OIL CLOUD POINT SUBSTANTIALLY HIGHER TRAN REQUIRED STATUS:

A fuel oil specification consistent with outside temperature conditions and other fuel oil uses at point Beach has been developed and was approved by the plant staff in November.

A Safety Evaluation has-also been approved for uso of the fuel blend.

On-site fuel oil storage tanks were blended during the week of December 9,

1990, and brought into specification.

Modifications to plant systems are not required to use the specified fuel oil blend.

A special standing order is being developed giving direction on actions to be taken if outsido air temperatures drop below the fuel oil cloud point.

Wo will also be evaluating modifications to eliminate this concern with fuel oil cloud-point.

6l l-l:

l

.. -, _.., _. _ _. - _ _ _ _ _.... _. _ _. _ _ _. - -. - _ _.... ~. ~... -. _ _ _ _ _.. _ _. _ _

.. -==

l DEFICIEHQY 90-201-241 VENTING STEAM ON BAFETY-RELATED CADLED STATUS:

A temporary modification to shield the affected cables from venting steam has been completed.

All non-safety related cables in the affected trays have been moggared and found acceptable.

A modification to the steam vent system to minimize steam venting near the cables in question has been initiated and will be completed by December 1, 1991.

In our August 3, 1990, response we stated in error that the modification would be completed by December 1, 1990.

I l

l l

,