ML20066A857

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-60 Re Installation of non- Category I Pipelines Not Seismically Supported Over safety- Related Equipment in Control Bldg.Initially Reported on 820615.Investigation Incomplete.Next Rept by 830203
ML20066A857
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/29/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, RGB-13-644, NUDOCS 8211060247
Download: ML20066A857 (1)


Text

GULF STATES UTILITIES COMPANY

  • G POST O F FIC E BOX 2951 = BEAUMONT, TEXAS 77704 AREA CODE 713 838-6631 October 29, 1982 RBG- 13,644 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of ;nspection and Enforcement 3]g]g]3 611 Ryan Plaza Drive, Suite 1000 s Arlington, Texas 76011 g l@ l

Dear Mr. Collins:

L U

- ~ ~ ~ '

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-60 On June 15, 1982, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of a condition potentially reportable under.

10CFR50.55(e) concerning the installation of non-Category I pipelines that were not seismically supported over safety-related equipment in the control building. GSU has requested additional information from our architect engineer, Stone & Webster, and therefore, our investigation for reportability of this condition is not complete at this time. An interim or final status report will be provided by

February 3, 1983.

4 Sincerely, l

  1. alp d# J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/ /kt (h

cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 y R. L. Brown (SRI) 8211060247 821029 DR ADOCK 05000458 i

PDR l_ _ _ _ . _ _ _ _ . _

_ _ _ _ . m. ._ _ - _ . _ . , . _ . . , , - _ _ _ . _ _ . - - - -,