ML20065U340
Jump to navigation
Jump to search
| ML20065U340 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/13/1982 |
| From: | TOLEDO EDISON CO. |
| To: | NRC |
| Shared Package | |
| ML20065U338 | List: |
| References | |
| NUDOCS 8211040203 | |
| Download: ML20065U340 (1) | |
Text
{
+
i a
DAVIS-BESSE REVISION COVER SHEET 1
4 2
October 13, 1982 DATE Ibi1 A / A/tc hM bn-rL To:
FROM: EMER ENCY PLANNI C & PREPAREDNESS SUPV.
I SUll.1ECT: Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes 1-This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual. Control Copy JT d.
Instructions for the material are as follows:
REMOVE AND RETURN INSERT i
l Revision Index, Rev. 16 Revision Index, Rev. 17 l
T-6820 in front of El 1300.12 I
O KO that e Revlulun Ent ered Addressee Signature RETURN TO THE OFFICE MANAGER STOP #3050 i
m 8211040203 821025 PDR ADOCK 05000346 p
PDR 7_._.__..
9